Samron Midwest Contracting, Inc.: IDOT bid record
Samron Midwest Contracting, Inc. submitted 458 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 197 of them (43%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $500,250,842
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 65 | 29 | 45% |
| 2022 | 48 | 18 | 38% |
| 2023 | 77 | 28 | 36% |
| 2024 | 103 | 50 | 49% |
| 2025 | 94 | 34 | 36% |
| 2026 | 71 | 38 | 54% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 09 | 336 | 154 | 46% |
| District 07 | 96 | 33 | 34% |
| District 08 | 26 | 10 | 38% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Engr field office A | 67000400 | CAL MO | 220 | 185 (84%) | $1,750.00 | $2,550.00 |
| Bit matls tack CT | 40600290 | LB | 219 | 175 (80%) | $0.01 | $0.01 |
| Temporary ramp | 40600990 | SY | 143 | 115 (80%) | $20.00 | $19.46 |
| Trainees TPG | Z0076604 | HR | 96 | 96 (100%) | $15.00 | $15.00 |
| Pavement rem | 44000100 | SY | 150 | 93 (62%) | $20.00 | $20.30 |
| Trainees | Z0076600 | HR | 88 | 88 (100%) | $0.80 | $0.80 |
| Paint PVT MK line 4 | 78001110 | LF | 209 | 86 (41%) | $2.00 | $1.00 |
| Reinf bars, epoxy CTD | 50800205 | LB | 177 | 84 (47%) | $2.50 | $2.50 |
| Perimeter eros bar | 28000400 | LF | 128 | 84 (66%) | $4.00 | $3.50 |
| Raised refl pavt MKR | 78100100 | EACH | 166 | 81 (49%) | $48.12 | $48.00 |
| HMA surf rem butt JT | 40600982 | SY | 146 | 80 (55%) | $15.00 | $16.50 |
| Short term pavt mking | 70300100 | LF | 191 | 74 (39%) | $1.75 | $1.01 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| E. T. Simonds Construction Company | 327 | 164 of 327 |
| Sangamo Construction Company | 52 | 22 of 52 |
| Sierra Bravo Contractors, LLC | 50 | 22 of 50 |
| C-Hill Civil Contractors, Inc. | 31 | 23 of 31 |
| G. M. Sipes Construction, Inc. | 25 | 11 of 25 |
| Kieffer Bros. Construction Co., Inc. | 22 | 2 of 22 |
| Kinney Contractors, Inc. | 21 | 11 of 21 |
| Plocher Construction Company, Inc. | 16 | 5 of 16 |
| Southern Illinois Asphalt Co., Inc. | 13 | 5 of 13 |
| Lake Contracting, Inc. | 12 | 7 of 12 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 74650 | District 07 | Section (15-22VB)BR | 2 of 3 | $11,858,707 | +3.0% |
| 18 SEP 2026 | 74D06 | District 07 | Section (101,102) | 1 of 2 | $3,376,083 | Low, 6.0% under the second |
| 18 SEP 2026 | 74D71 | District 07 | Section D7 | 3 of 3 | $858,422 | +11% |
| 18 SEP 2026 | 78990 | District 09 | Section 106CR-1 | 1 of 2 | $539,518 | Low, 3.0% under the second |
| 18 SEP 2026 | 78B55 | District 09 | Section (12,12-2)R-1,RS-3 | 1 of 2 | $2,308,150 | Low, 36% under the second |
| 31 JUL 2026 | 78520 | District 09 | Section (41-8,1,2)RS-5;1B-1 | 2 of 2 | $10,360,275 | +4.0% |
| 31 JUL 2026 | 78935 | District 09 | Section 113B-2 | 2 of 2 | $1,321,450 | +4.0% |
| 31 JUL 2026 | 99769 | District 09 | Project Number: Mqtu-969 / /, section 23-00111-00-RS | 1 of 1 | $1,054,105 | Low |
| 31 JUL 2026 | 99775 | District 09 | Herrin, section 25-00078-00-RS | 1 of 2 | $693,605 | Low, 1.0% under the second |
| 12 JUN 2026 | 74B79 | District 07 | Section D7 | 2 of 2 | $1,162,469 | +12% |
| 12 JUN 2026 | 76M95 | District 08 | Section 95-(3,4)RS-2 | 1 of 3 | $74,388,393 | Low, 20% under the second |
| 12 JUN 2026 | 76U77 | District 08 | Section 29-2(BDR,BRR,BJR) | 1 of 2 | $1,125,909 | Low, 22% under the second |
| 12 JUN 2026 | 78791 | District 09 | Section 136-1(B-2) | 1 of 2 | $3,285,578 | Low, 4.0% under the second |
| 12 JUN 2026 | 78977 | District 09 | Section 5N-3 | 1 of 2 | $967,393 | Low, 60% under the second |
| 12 JUN 2026 | 78A13 | District 09 | Section D9 | 2 of 2 | $2,734,148 | +2.0% |
| 12 JUN 2026 | 78A85 | District 09 | Section D9 | 2 of 2 | $6,151,363 | +4.0% |
| 12 JUN 2026 | 78B49 | District 09 | Section (41-8)PP-1,R-1 | 1 of 2 | $4,558,321 | Low, 16% under the second |
| 12 JUN 2026 | 78B59 | District 09 | Section 127RS-6 | 1 of 2 | $1,230,184 | Low, 16% under the second |
| 12 JUN 2026 | 78C10 | District 09 | Section 101BRR-1 | 2 of 2 | $587,311 | +1.0% |
| 12 JUN 2026 | 78C13 | District 09 | Section 40(SLP-1) | 1 of 1 | $328,825 | Low |
| 12 JUN 2026 | 78C24 | District 09 | Section 8RS-4 | 1 of 2 | $1,989,087 | Low, 8.0% under the second |
| 12 JUN 2026 | 78C25 | District 09 | Section 111RS-4 | 1 of 2 | $1,618,916 | Low, 9.0% under the second |
| 12 JUN 2026 | 95996 | District 07 | Teutopolis, section 23-00022-00-PV | 4 of 5 | $315,315 | +15% |
| 12 JUN 2026 | 95997 | District 07 | Vandalia, section 21-00070-00-SW | 5 of 5 | $2,074,876 | +26% |
| 12 JUN 2026 | 99770 | District 09 | Project Number: Ex1H-054 / /, section 23-00045-00-RS | 1 of 1 | $1,079,783 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.