IDOT contract 74D06 bid tabulation
Section (101,102). Let by Illinois DOT on September 18, 2026, Wayne, District 07. 2 bids received; low bid $3,376,083 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 18 SEP 2026
- Pay items
- 121
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $3,376,083 | Low |
| 2 | E. T. Simonds Construction Company | $3,568,928 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. E. T. Simonds Construction Company |
|---|---|---|---|---|---|
| 1 | Seeding CL 2 SPL (X2501000) | ACRE | 0.04 | $125,000 | $126,500 |
| 2 | Rem & rel SN P&P assy (X2600012) | EACH | 4 | $460.00 | $763.53 |
| 3 | Temporary ramp SPL (X4060995) | SY | 303 | $30.00 | $48.14 |
| 4 | HMA surf rem var DP (X4401198) | SY | 447 | $5.00 | $14.12 |
| 5 | Island removal (X4402805) | SF | 231 | $9.00 | $19.99 |
| 6 | BR deck grooving long (X5030250) | SY | 813 | $14.00 | $11.51 |
| 7 | Luminaire MT BRKT SPL (X8210402) | EACH | 16 | $640.00 | $704.94 |
| 8 | Cleaning bridge seats (Z0010400) | SF | 429 | $7.00 | $38.32 |
| 9 | Diamond grind BR sec (Z0029090) | SY | 1,304 | $13.50 | $13.78 |
| 10 | Prot reset survey MRK (Z0049799) | EACH | 3 | $2,500.00 | $1,613.33 |
| 11 | Trainees (Z0076600) | HR | 500 | $0.80 | $0.80 |
| 12 | Trainees TPG (Z0076604) | HR | 500 | $15.00 | $15.00 |
| 13 | Earth excavation (20200100) | CY | 101 | $60.00 | $138.02 |
| 14 | Topsoil F & P var DP (21101600) | SY | 189 | $20.00 | $30.73 |
| 15 | Agg base cse B (35101400) | TON | 176 | $60.00 | $83.73 |
| 16 | PCC bse cse 10 1/2 (35300510) | SY | 1,391 | $0.01 | $0.01 |
| 17 | Agg surf course TY B (40200800) | TON | 158 | $65.00 | $89.94 |
| 18 | Bit matls tack CT (40600290) | LB | 15,801 | $0.01 | $0.01 |
| 19 | Long joint sealant (40600370) | LF | 6,495 | $4.25 | $4.17 |
| 20 | HMA surf rem butt JT (40600982) | SY | 2,184 | $5.00 | $4.54 |
| 21 | Temporary ramp (40600990) | SY | 102 | $30.00 | $91.55 |
| 22 | HMA BC IL-9.5FG N70 (40602970) | TON | 2,111 | $125.00 | $109.11 |
| 23 | HMA BC IL-19.0 N70 (40603085) | TON | 34 | $400.00 | $346.33 |
| 24 | P HMA BC IL-9.5FG N90 (40603219) | TON | 149 | $230.00 | $230.89 |
| 25 | HMA SC IL-9.5 C N70 (40604052) | TON | 2,451 | $135.00 | $105.96 |
| 26 | P HMA SC IL-9.5 D N90 (40604164) | TON | 171 | $235.00 | $220.20 |
| 27 | Incidental HMA surf (40800050) | TON | 22 | $180.00 | $425.74 |
| 28 | Welded wire reinf (42000060) | SY | 58 | $10.00 | $12.36 |
| 29 | PCC driveway pavt 8 (42300400) | SY | 57 | $135.00 | $203.71 |
| 30 | Pavement rem (44000100) | SY | 474 | $50.00 | $25.26 |
| 31 | HMA surf rem 1 1/2 (44000155) | SY | 12,845 | $2.50 | $2.44 |
| 32 | HMA surf rem 2 1/2 (44000159) | SY | 14,613 | $2.80 | $3.57 |
| 33 | Drive pavement rem (44000200) | SY | 57 | $35.00 | $80.99 |
| 34 | Comb curb gutter rem (44000500) | LF | 3,943 | $13.00 | $8.41 |
| 35 | Median removal (44003100) | SF | 1,690 | $6.60 | $5.46 |
| 36 | Dowel bars 1 1/2 (44201299) | EACH | 44 | $10.00 | $73.21 |
| 37 | CL C patch T4 11 (44201371) | SY | 58 | $285.00 | $411.49 |
| 38 | CL D patch T2 11 (44201777) | SY | 360.40 | $280.00 | $268.00 |
| 39 | CL D patch T3 11 (44201781) | SY | 103.50 | $275.00 | $265.00 |
| 40 | CL D patch T4 11 (44201783) | SY | 35 | $270.00 | $263.00 |
| 41 | Saw cuts (44213200) | LF | 158 | $10.00 | $0.01 |
| 42 | Agg wedge SHLD type B (48102100) | TON | 555 | $48.00 | $41.73 |
| 43 | HMA shoulders 3 3/4 (48203012) | SY | 6,736 | $28.50 | $21.54 |
| 44 | HMA shoulders 8 (48203029) | SY | 453 | $90.00 | $71.99 |
| 45 | Conc rem (50102400) | CY | 38.70 | $2,150.00 | $3,121.11 |
| 46 | Protective shield (50157300) | SY | 761 | $112.00 | $120.18 |
| 47 | Floor drains (50300100) | EACH | 8 | $750.00 | $1,520.39 |
| 48 | Conc struct (50300225) | CY | 8 | $1,900.00 | $2,880.74 |
| 49 | Conc sup-STR (50300255) | CY | 38.60 | $2,750.00 | $3,115.71 |
| 50 | Protective coat (50300300) | SY | 1,608 | $1.60 | $1.35 |
| 51 | Reinf bars, epoxy CTD (50800205) | LB | 5,850 | $2.20 | $2.13 |
| 52 | Bar splicers (50800515) | EACH | 40 | $50.00 | $45.10 |
| 53 | Pref JT strip seal (52000110) | LF | 159.50 | $250.00 | $298.90 |
| 54 | Deck slab rep (FD-T1) (53016001) | SY | 7.30 | $2,000.00 | $5,939.20 |
| 55 | Deck slab rep (FD-T2) (53016002) | SY | 1.40 | $2,750.00 | $7,909.11 |
| 56 | BR deck scar 2 1/2 (53101009) | SY | 1,532 | $68.00 | $101.65 |
| 57 | BRD flyash/GGBF 2 3/4 (53101210) | SY | 1,532 | $87.00 | $108.08 |
| 58 | STR rep con DP = < 5 (53212754) | SF | 503.30 | $195.00 | $221.50 |
| 59 | Comb CC&G TM6.06 (60608600) | LF | 3,150 | $52.00 | $62.91 |
| 60 | Comb CC&G TM6.06 dow (60608800) | LF | 793 | $57.00 | $64.09 |
| 61 | Conc median surf 7 (60618330) | SF | 1,690 | $14.00 | $24.76 |
| 62 | Corrugated med (60624600) | SF | 2,037 | $25.00 | $36.50 |
| 63 | Island pavement 6 (60625600) | SY | 24 | $230.00 | $296.66 |
| 64 | Shoulder rum strip 8 (64200108) | LF | 13,684 | $0.42 | $0.70 |
| 65 | Engr field office A (67000400) | CAL MO | 6 | $1,700.00 | $2,000.00 |
| 66 | Engr field lab (67000600) | CAL MO | 3 | $1,800.00 | $2,000.00 |
| 67 | Mobilization (67100100) | LS | 1 | $200,000 | $210,507 |
| 68 | Traf cont-prot 701316 (70100100) | EACH | 1 | $55,000 | $19,721 |
| 69 | Traf cont-prot 701411 (70100420) | EACH | 1 | $10,000 | $25,413 |
| 70 | Traf cont-prot 701201 (70100450) | LS | 1 | $15,000 | $38,628 |
| 71 | Traf cont-prot 701306 (70100460) | LS | 1 | $22,000 | $53,497 |
| 72 | Traf cont-prot 701406 (70100700) | LS | 1 | $5,000.00 | $0.01 |
| 73 | Traf cont-prot 701401 (70100800) | LS | 1 | $142,000 | $65,008 |
| 74 | Traf cont-prot 701456 (70100825) | LS | 1 | $5,000.00 | $0.01 |
| 75 | Temp BR traf signals (70106500) | EACH | 1 | $52,000 | $62,150 |
| 76 | Changeable message SN (70107025) | CAL DAY | 28 | $115.00 | $85.43 |
| 77 | Short term pavt mking (70300100) | LF | 1,184 | $5.00 | $6.49 |
| 78 | SHRT TRM pavt MK rem (70300150) | SF | 195 | $5.00 | $12.95 |
| 79 | Temp PVT MK LTR & sym paint (70300211) | SF | 187 | $0.01 | $0.01 |
| 80 | Temp PVT MK line 4 - paint (70300221) | LF | 22,867 | $0.01 | $0.01 |
| 81 | Temp PVT MK line 6 - paint (70300241) | LF | 390 | $0.01 | $0.01 |
| 82 | Temp PVT MK line 8 - paint (70300251) | LF | 837 | $0.01 | $0.01 |
| 83 | Temp PVT MK line 12 - paint (70300261) | LF | 545 | $0.01 | $0.01 |
| 84 | Temp PVT MK line 24 - paint (70300281) | LF | 72 | $0.01 | $0.01 |
| 85 | Sign panel T1 (72000100) | SF | 33 | $38.00 | $215.36 |
| 86 | Rem & rel sign panel asmbly TB (72400210) | EACH | 2 | $1,000.00 | $1,440.71 |
| 87 | Teles STL sin support (72800100) | LF | 165 | $24.50 | $39.90 |
| 88 | Wood sin support (73000100) | LF | 36 | $93.00 | $55.74 |
| 89 | Rem GR MT sin support (73700100) | EACH | 2 | $300.00 | $572.67 |
| 90 | THPL PVT MK LTR & sym (78000100) | SF | 187 | $13.50 | $14.30 |
| 91 | THPL PVT MK line 4 (78000200) | LF | 22,818 | $0.80 | $0.81 |
| 92 | THPL PVT MK line 6 (78000400) | LF | 390 | $3.60 | $3.85 |
| 93 | THPL PVT MK line 8 (78000500) | LF | 837 | $4.20 | $4.40 |
| 94 | THPL PVT MK line 12 (78000600) | LF | 545 | $7.00 | $7.43 |
| 95 | THPL PVT MK line 24 (78000650) | LF | 72 | $13.75 | $14.30 |
| 96 | Pref PL PM TD STD L4 (78004620) | LF | 1,224 | $6.00 | $6.33 |
| 97 | GRV RCSD PM LTR & sym (78011000) | SF | 187 | $5.25 | $5.50 |
| 98 | GRV RCSD PVT MRKG 5 (78011025) | LF | 24,042 | $0.45 | $0.45 |
| 99 | GRV RCSD PVT MRKG 7 (78011035) | LF | 390 | $0.46 | $0.46 |
| 100 | GRV RCSD PVT MRKG 9 (78011045) | LF | 837 | $4.75 | $4.95 |
| 101 | GRV RCSD PVT MRKG 13 (78011065) | LF | 545 | $5.25 | $5.50 |
| 102 | GRV RCSD PVT MRKG 25 (78011125) | LF | 72 | $6.25 | $6.60 |
| 103 | Raised refl pavt MKR (78100100) | EACH | 216 | $52.00 | $89.54 |
| 104 | Curb reflectors (78200020) | EACH | 152 | $12.50 | $16.09 |
| 105 | Raised ref PVT MK rem (78300200) | EACH | 216 | $12.00 | $14.30 |
| 106 | PVT MKG rem WTR blast (78300202) | SF | 57 | $65.00 | $0.01 |
| 107 | Elect serv install (80400100) | EACH | 1 | $4,300.00 | $4,754.53 |
| 108 | Undrgrd C CNC 2 (81028750) | LF | 442 | $23.00 | $24.64 |
| 109 | UD 2#6 #8G xlpuse 1 (81603040) | LF | 3,554 | $13.25 | $14.63 |
| 110 | UD 2#2#4GXLPUSE 1 1/4 (81603070) | LF | 4,052 | $21.00 | $23.32 |
| 111 | EC C XLP use 1C 1/0 (81702160) | LF | 150 | $14.50 | $16.09 |
| 112 | Lum LED rdwy H (82110008) | EACH | 18 | $850.00 | $937.41 |
| 113 | LT cont pedm 240V 60 (82500330) | EACH | 1 | $13,000 | $14,099 |
| 114 | LT P GS 45MH ten MT (83060830) | EACH | 14 | $5,900.00 | $6,507.85 |
| 115 | LT P GS 45MH TN MT-TW (83060835) | EACH | 2 | $5,900.00 | $6,507.86 |
| 116 | LP F M 15BC 8 5/8X6 (83600356) | EACH | 16 | $1,750.00 | $1,799.82 |
| 117 | Bkwy dev cou SS SCRN (83800650) | EACH | 64 | $250.00 | $269.97 |
| 118 | Rem LT U no salv (84200600) | EACH | 16 | $550.00 | $599.94 |
| 119 | Rem pole FDN (84200804) | EACH | 16 | $275.00 | $299.97 |
| 120 | Remov lighting contr (84500110) | EACH | 1 | $1,100.00 | $1,199.88 |
| 121 | Remov elect serv inst (84500120) | EACH | 1 | $1,250.00 | $1,650.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.