Lake Contracting, Inc.: IDOT bid record

Lake Contracting, Inc. submitted 22 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 16 JAN 2026, and was the low bidder on 8 of them (36%). When it was not low, its total sat a median +15% above the low bid.

Owner
Illinois DOT
Low bid volume
$2,600,986
Latest bid
16 JAN 2026
Data through
18 SEP 2026
22Bids
8Low bids
36Win rate, percent
+15%Median gap to the low bid when not low, 14 bids

By year

YearBidsLow bidsWin rate
20215120%
20224250%
20237457%
2024200%
2025300%
202611100%
Lake Contracting, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0711436%
District 086117%
District 095360%
Lake Contracting, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Name plates51500100EACH1514 (93%)$400.00$773.24
Conc struct50300225CY1610 (63%)$700.00$1,260.00
Terminal marker - DA72501000EACH149 (64%)$40.00$47.85
Concrete encasement50300280CY128 (67%)$700.00$1,200.00
Reinf bars, epoxy CTD50800205LB86 (75%)$2.00$2.50
Reinforcement bars50800105LB95 (56%)$2.00$2.50
Test pile ST HP12X5351203600EACH95 (56%)$10,000$8,900.00
Rem exist struct50100100EACH154 (27%)$15,000$50,000
Channel excavation20300100CY144 (29%)$18.75$35.00
Pile shoes51204650EACH74 (57%)$125.00$200.00
Agg surf cse B40200800TON74 (57%)$34.00$50.00
Earth excavation20200100CY163 (19%)$20.00$48.00
Lake Contracting, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Lake Contracting, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
16 JAN 202674D50District 07Section D71 of 3$115,664Low, 12% under the second
13 JUN 202599752District 09Project Number: 0Jyp-394 / /, section 20-00148-00-BR3 of 3$540,466+19%
17 JAN 202595970District 07Project Number: Xsiq-084 / /, section 20-00131-00-BR3 of 3$891,613+6.0%
17 JAN 202597849District 08Project Number: X3Q7-734 / /, section 21-00101-00-BR2 of 3$1,177,074+8.0%
26 APR 202476T46District 08Section 119-1BR-12 of 3$391,976+26%
26 APR 202497823District 08Project Number: 6Zqt-622 / /, section 19-11004-00-BR2 of 4$793,930+18%
28 APR 202374B84District 07Section D71 of 1$211,788Low
28 APR 202395928District 07Project Number: Edex-677 / /, section 19-05125-00-BR2 of 3$345,515+11%
28 APR 202395929District 07Project Number: 6Z2T-482 / /, section 19-02130-00-BR2 of 3$441,854+9.0%
28 APR 202395932District 07Project Number: 8Pvt-973 / /, section 19-00125-00-BR1 of 3$709,450Low, 2.0% under the second
28 APR 202397782District 08Project Number: L008-774 / /, section 18-11122-00-BR1 of 3$319,999Low, 2.0% under the second
20 JAN 202378962District 09Section (28-2-1)(I-2)RA1 of 2$434,024Low, 2.0% under the second
20 JAN 202397797District 08Project Number: D17A-312 / /, section 21-00084-00-BR2 of 2$711,986+2.0%
29 APR 202246931District 09Section IDNR1 of 3$239,183Low, 19% under the second
11 MAR 202299665District 09Marion, section 18-00123-00-SW1 of 3$209,037Low, 19% under the second
21 JAN 202295898District 07Project Number: Bq7G-886 / /, section 04-12114-00-BR2 of 4$273,119+14%
21 JAN 202295906District 07Project Number: Gjzp-832 / /, section 18-08137-00-BR2 of 2$577,226+11%
11 JUN 202195894District 07Project Number: J0J7-421 / /, section 19-00124-00-BR3 of 3$491,676+17%
11 JUN 202195896District 07Project Number: L3Z9-012 / /, section 17-18119-00-BR3 of 4$348,814+18%
05 MAR 202195888District 07Project Number: 1Kij-037 / /, section 17-20129-00-BR1 of 4$361,841Low, 1.0% under the second
05 MAR 202197749District 08Project Number: 2Muy-482 / /, section 15-09034-00-BR3 of 3$274,796+16%
05 MAR 202199654District 09Project Number: 0Nw6-427 / /, section 18-00001-00-BT4 of 4$1,032,160+25%
Lake Contracting, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy