Guinzy Construction,Inc.: IDOT bid record

Guinzy Construction,Inc. submitted 19 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 27 FEB 2026, and was the low bidder on 7 of them (37%). When it was not low, its total sat a median +26% above the low bid.

Owner
Illinois DOT
Low bid volume
$8,184,697
Latest bid
27 FEB 2026
Data through
18 SEP 2026
19Bids
7Low bids
37Win rate, percent
+26%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
2021200%
202233100%
20233267%
20246233%
2025200%
2026300%
Guinzy Construction,Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0810770%
District 09900%
Guinzy Construction,Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR55 (100%)$15.00$15.00
TraineesZ0076600HR55 (100%)$0.80$0.80
Earth excavation20200100CY94 (44%)$32.14$48.00
Filter fabric28200200SY74 (57%)$3.85$4.65
Temp eros contr seed28000250LB83 (38%)$4.88$5.00
Trench backfill20800150CY73 (43%)$62.94$55.00
Sidewalk rem44000600SF63 (50%)$3.41$3.00
Perimeter eros bar28000400LF63 (50%)$4.21$3.50
Bit matls tack CT40600290LB53 (60%)$1.66$0.01
P cul CL A 1 15542A0220LF53 (60%)$83.32$91.00
Pipe culvert remov50105220LF82 (25%)$23.96$23.50
Erosion contr blanket25100630SY72 (29%)$2.63$1.85
Guinzy Construction,Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Guinzy Construction,Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
27 FEB 202678B83District 09Section D92 of 2$952,089+181%
16 JAN 202678A09District 09Section 127CR-12 of 3$1,069,096+12%
16 JAN 202678B92District 09Section (112)I-24 of 4$951,930+383%
13 JUN 202578B21District 09Section D94 of 4$2,880,161+227%
07 MAR 202546942District 09Section REND4 of 4$1,486,598+46%
08 NOV 202478949District 09Section 19CR-13 of 3$595,079+62%
08 NOV 202478A88District 09Section D92 of 2$698,968+26%
14 JUN 202476H70District 08Section 27BR-11 of 8$43,254Low, 42% under the second
14 JUN 202478776District 09Section 5R-23 of 4$7,193,444+8.0%
19 JAN 202446933District 08Section FORBES2 of 2$9,483,767+12%
19 JAN 202497820District 08Project Number: Fu6M-069 / /, section 20-00144-00-SP1 of 2$3,423,535Low, 18% under the second
17 NOV 202376M90District 08Section 101CR-11 of 4$490,747Low, 8.0% under the second
10 MAR 202376R42District 08Section (12,13,14)CJS-15 of 5$419,187+313%
20 JAN 202397791District 08Centralia, section 18-00106-00-PV1 of 3$1,778,437Low, 12% under the second
18 NOV 202246935District 08Section WASHINGTON1 of 4$375,302Low, 7.0% under the second
18 NOV 202297781District 08Project Number: Lmrk-332 / /, section 18-00139-00-RS1 of 3$1,647,597Low, 14% under the second
17 JUN 202297778District 08Salem, section 18-00047-03-PV1 of 1$425,825Low
05 MAR 202199654District 09Project Number: 0Nw6-427 / /, section 18-00001-00-BT3 of 4$1,004,343+21%
15 JAN 2021SA034District 08Section SALEM-LECKRONE4 of 4$249,731+32%
Guinzy Construction,Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.