IDOT letting results, February 27, 2026
145 contracts let by Illinois DOT on February 27, 2026, $579,435,908 in low bids, a median of 3 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 145
- Low bids, total
- $579,435,908
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 62R23 | Section FAI | District 01 | 3 | D. Construction, Inc. & Kraemer North America, LLC JV | $164,963,136 | $173,627,543 | +5.0% | IDOT |
| 72C96 | Section (84-1-2)RS-5,WS-6 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $25,964,194 | IDOT | ||
| 68474 | Section 72[(7,7-1)RS-3;1RS-5] | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $25,863,073 | IDOT | ||
| 76T66 | Section 266BRR,(4,5)I | District 08 | 1 | Keeley & Sons, Inc. and Wissehr Electric, Inc. JV | $22,242,413 | IDOT | ||
| 64R72 | Section (15X)RC&5RS | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $21,418,706 | $25,987,811 | +21% | IDOT |
| 72295 | Section 103RS-14,TS-3, | District 06 | 1 | Diamond Construction Company | $18,201,126 | IDOT | ||
| 64U03 | Section (103-1,2)RA&RS | District 02 | 2 | Rock Road Companies, Inc. | $14,540,979 | $14,968,831 | +3.0% | IDOT |
| 62R19 | Section FAI | District 01 | 2 | Meade Inc. | $12,989,531 | $17,992,257 | +39% | IDOT |
| 61M26 | Schaumburg, section 23-00146-00-PV | District 01 | 4 | A Lamp Concrete Contractors, Inc. | $12,659,993 | $13,058,813 | +3.0% | IDOT |
| 68F91 | Section (12RS-4,11RS-2) | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $11,748,219 | IDOT | ||
| 68J96 | Section 3RS-6;4RS-2 | District 04 | 1 | Advanced Asphalt Company | $7,833,037 | IDOT | ||
| 76U43 | Section 60-15RS-2 | District 08 | 2 | Charles E. Mahoney Co. | $7,764,431 | $8,090,819 | +4.0% | IDOT |
| 68J68 | Section 133RS-5;134RS-3;135RS-9 | District 04 | 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $7,447,606 | $8,217,452 | +10% | IDOT |
| 70F37 | Section (57-3)BR | District 05 | 1 | Stark Excavating, Inc. | $7,331,185 | IDOT | ||
| 64S71 | Section 106RS | District 02 | 1 | Civil Constructors, Inc. d/b/a/ Helm Civil | $7,058,363 | IDOT | ||
| 61L93 | Arlington Heights, section 23-00221-00-RS | District 01 | 4 | K-Five Construction Corporation | $6,861,033 | $7,086,807 | +3.0% | IDOT |
| 70F77 | Section (57-10HB)BR-1 | District 05 | 1 | Stark Excavating, Inc. | $6,845,494 | IDOT | ||
| 76U42 | Section 60-(7,8,9)RS-2 | District 08 | 1 | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company | $6,640,925 | IDOT | ||
| 78B34 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $5,793,218 | $5,967,786 | +3.0% | IDOT |
| 93853 | Project Number: 8Fkl-446 / /, section 20-00102-00-PP | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $5,678,290 | $5,924,555 | +4.0% | IDOT |
| 72762 | Section 119RS-4,120RS-5,CLV | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $5,590,001 | $5,858,113 | +5.0% | IDOT |
| 68J57 | Section (8,103)RS-5;[(103B)I]BRR | District 04 | 2 | Advanced Asphalt Company | $5,129,210 | $5,442,603 | +6.0% | IDOT |
| 78B52 | Section 110RS-6; | District 09 | 1 | E. T. Simonds Construction Company | $4,988,975 | IDOT | ||
| 62P01 | Section 2021-064-CR | District 01 | 4 | Austin Tyler Construction, Inc. | $4,980,727 | $5,055,284 | +1.0% | IDOT |
| 76U40 | Section (28,29-2)RS-1 | District 08 | 1 | Howell Paving, Inc. | $4,980,603 | IDOT | ||
| 97872 | Project Number: E181-096 / /, section 24-00301-26-PW | District 08 | 3 | DMS Contracting, Inc. | $4,689,431 | $4,700,338 | 0.0% | IDOT |
| 76A37 | Section 29-2BR | District 08 | 2 | Samron Midwest Contracting, Inc. | $4,343,470 | $4,823,383 | +11% | IDOT |
| 80B15 | Section 2025-1089-RS | District 01 | 4 | R. W. Dunteman Company | $4,255,555 | $4,711,301 | +11% | IDOT |
| 85769 | Loves Park, section 21-00078-01-SW | District 02 | 6 | N-Trak Group LLC | $3,986,156 | $4,115,541 | +3.0% | IDOT |
| 61M28 | Schaumburg, section 25-00149-02-RS | District 01 | 7 | A Lamp Concrete Contractors, Inc. | $3,964,130 | $4,068,800 | +3.0% | IDOT |
| 74D53 | Section (1)RS-3 | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $3,649,451 | IDOT | ||
| 68K15 | Section 130RS-7;131RS-6 | District 04 | 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $3,624,569 | $3,631,904 | 0.0% | IDOT |
| 66P67 | Section (19,20)RS-5 | District 03 | 2 | Advanced Asphalt Company | $3,606,240 | $3,692,365 | +2.0% | IDOT |
| 72989 | Section (17X)RS-1,SW | District 06 | 3 | Illinois Valley Paving, a div of UCM, Inc. | $3,597,405 | $3,618,306 | +1.0% | IDOT |
| 78967 | Section 130B-1 | District 09 | 2 | E. T. Simonds Construction Company | $3,594,116 | $4,034,493 | +12% | IDOT |
| 76B42 | Section 26BR,11BR-1 | District 08 | 3 | C-Hill Civil Contractors, Inc. | $3,575,562 | $4,095,404 | +15% | IDOT |
| 61M27 | Schaumburg, section 25-00149-01-RS | District 01 | 6 | A Lamp Concrete Contractors, Inc. | $3,554,124 | $3,687,513 | +4.0% | IDOT |
| 68K16 | Section 130RS-8 | District 04 | 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $3,332,964 | $3,364,295 | +1.0% | IDOT |
| 80B25 | Section 2025-2006-RS | District 01 | 4 | R. W. Dunteman Company | $3,330,985 | $3,654,603 | +10% | IDOT |
| 80B75 | Section 2025-2039-RS,SW | District 01 | 2 | Peter Baker & Son Co. | $3,291,674 | $3,721,570 | +13% | IDOT |
| 74653 | Section (32Q-MFT)BR | District 07 | 2 | Sangamo Construction Company | $3,082,674 | $4,354,187 | +41% | IDOT |
| 62X88 | Section 2024-1049-RS | District 01 | 5 | Peter Baker & Son Co. | $2,806,275 | $2,935,128 | +5.0% | IDOT |
| 97882 | Granite City, section 21-00189-01-RS | District 08 | 2 | Stutz Excavating, Inc. | $2,795,529 | $2,865,779 | +3.0% | IDOT |
| 74368 | Section (128BR-1)B-1 | District 07 | 2 | Sangamo Construction Company | $2,735,104 | $3,314,583 | +21% | IDOT |
| 61L39 | North Aurora, section 21-00057-00-CH | District 01 | 3 | Geneva Construction Company | $2,691,498 | $2,808,088 | +4.0% | IDOT |
| 64J38 | Section (32-2)RS-1 | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $2,673,307 | $2,955,930 | +11% | IDOT |
| 62V43 | Section FAP | District 01 | 2 | Builders Paving, LLC | $2,670,318 | $2,731,172 | +2.0% | IDOT |
| 46673 | Section D2 | District 02 | 5 | P & P Construction Co. | $2,288,600 | $2,390,000 | +4.0% | IDOT |
| 91660 | Project Number: Hxmm-530 / /, section 24-00170-01-RS | District 05 | 2 | Rowe Construction, a div of UCM, Inc. | $2,213,052 | $2,320,746 | +5.0% | IDOT |
| 80B08 | Section 2025-1096-RS | District 01 | 4 | Builders Paving, LLC | $2,172,384 | $2,269,967 | +4.0% | IDOT |
| 78B00 | Section D9 | District 09 | 2 | Gerstner Electric, Inc. | $2,170,000 | $2,568,409 | +18% | IDOT |
| 62V09 | Section FAP | District 01 | 4 | Plote Construction, Inc. | $2,129,000 | $2,170,627 | +2.0% | IDOT |
| 72540 | Section D6 | District 06 | 4 | Collins & Hermann, Inc. | $2,066,290 | $2,160,821 | +5.0% | IDOT |
| 76U52 | Section DIST | District 08 | 2 | Kinney Contractors, Inc. | $1,982,334 | $2,011,267 | +1.0% | IDOT |
| 68K62 | Section D4 | District 04 | 3 | Venus Painting Co. | $1,975,015 | $2,168,654 | +10% | IDOT |
| 62W92 | Section 2024-967-TS | District 01 | 4 | Helm Electric Facility Solutions, Inc. d/b/a Helm Electric | $1,883,890 | $1,978,232 | +5.0% | IDOT |
| 74C49 | Section D7 | District 07 | 2 | Sangamo Construction Company | $1,826,162 | $2,048,686 | +12% | IDOT |
| 62W78 | Section 2024-960-LT | District 01 | 2 | Hecker and Company, Inc. | $1,798,186 | $1,842,867 | +2.0% | IDOT |
| 99757 | Project Number: Mni4-133 / /, section 21-00164-00-PV | District 09 | 3 | Samron Midwest Contracting, Inc. | $1,715,790 | $1,816,142 | +6.0% | IDOT |
| 68E33 | Section (3-B)BR | District 04 | 4 | Gillan Construction LLC | $1,706,806 | $1,741,586 | +2.0% | IDOT |
| 72J75 | Section (68-3)RS-7 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,699,801 | IDOT | ||
| 72440 | Section 22RS-2, | District 06 | 2 | Illinois Valley Paving, a div of UCM, Inc. | $1,683,856 | $1,970,037 | +17% | IDOT |
| 76U73 | Section 82-1RS-2, | District 08 | 1 | Keeley & Sons, Inc. | $1,649,119 | IDOT | ||
| 46677 | Section D6-HT | District 06 | 5 | America's Parking ReMarking, LLC. | $1,613,371 | $1,691,840 | +5.0% | IDOT |
| 66R92 | Section 06(2HB-3,2HVB)BP | District 03 | 3 | Venus Painting Co. | $1,595,710 | $2,149,326 | +35% | IDOT |
| 61M25 | Project Number: H406-985 / /, section 16-11107-01-BR | District 01 | 7 | D. Construction, Inc. | $1,561,361 | $1,757,816 | +13% | IDOT |
| 62T82 | Section FAP | District 01 | 2 | Martam Construction Incorporated | $1,524,058 | $1,711,138 | +12% | IDOT |
| 78B38 | Section D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,494,455 | $1,707,736 | +14% | IDOT |
| 80B13 | Section 2025-1086-RS | District 01 | 5 | P. T. Ferro Construction Co. | $1,424,777 | $1,507,838 | +6.0% | IDOT |
| 68K11 | Section D4 | District 04 | 1 | All States Painting, Inc. | $1,394,676 | IDOT | ||
| 62Y17 | Section (551X-B)BDR,BJR | District 01 | 6 | MYS, Incorporated | $1,272,505 | $1,319,529 | +4.0% | IDOT |
| 93852 | Rushville, section 14-00019-00-FP | District 06 | 3 | Laverdiere Construction, Inc. | $1,249,952 | $1,699,492 | +36% | IDOT |
| 76U67 | Section 33PP-1, | District 08 | 1 | Christ Bros. Asphalt, Inc. | $1,246,663 | IDOT | ||
| 87910 | Project Number: Px2V-154 / /, section 25-00412-00-WR | District 03 | 2 | Advanced Asphalt Company | $1,225,765 | $1,276,654 | +4.0% | IDOT |
| 97886 | Fairview Heights, section 24-00035-01-RS | District 08 | 2 | Keeley & Sons, Inc. | $1,199,255 | $1,276,699 | +6.0% | IDOT |
| 62Y26 | Section (143VB-R-1(90))BR | District 01 | 7 | Iroquois Paving Corporation | $1,191,152 | $1,237,000 | +4.0% | IDOT |
| 70H62 | Section (22)BR-1,(115)BR-1 | District 05 | 1 | Sangamo Construction Company | $926,892 | IDOT | ||
| 61L87 | Riverdale, section 24-00141-00-RS | District 01 | 5 | Gallagher Asphalt Corporation | $902,962 | $942,000 | +4.0% | IDOT |
| 62X53 | Section 2024-1014-CR | District 01 | 1 | MYS, Incorporated | $899,287 | IDOT | ||
| 76U78 | Section (X-3)PP | District 08 | 4 | G. M. Sipes Construction, Inc. | $898,651 | $1,081,453 | +20% | IDOT |
| 68J51 | Section [(Z-D-SB)BR]BJR,BP | District 04 | 2 | Stark Excavating, Inc. | $878,313 | $1,070,700 | +22% | IDOT |
| 61M32 | Harwood Heights, section 22-00069-00-RS | District 01 | 6 | A Lamp Concrete Contractors, Inc. | $839,740 | $853,313 | +2.0% | IDOT |
| 61M16 | Hoffman Estates, section 23-00114-00-CH | District 01 | 6 | A Lamp Concrete Contractors, Inc. | $838,719 | $946,799 | +13% | IDOT |
| 76V02 | Section 1Z, | District 08 | 2 | The Kilian Corporation | $835,131 | $883,996 | +6.0% | IDOT |
| 62Y37 | Section 2025-1078-FNC | District 01 | 3 | Industrial Fence, Inc. | $833,967 | $896,346 | +7.0% | IDOT |
| 85789 | Project Number: 6Ktx-734 / /, section 20-00333-00-RS | District 02 | 2 | Martin & Company Excavating | $830,341 | $926,911 | +12% | IDOT |
| 74E30 | Section D7 | District 07 | 3 | Collins & Hermann, Inc. | $811,102 | $898,221 | +11% | IDOT |
| 68K91 | Section D4 | District 04 | 2 | Northern Contracting, Inc. | $800,027 | $1,500,000 | +87% | IDOT |
| 61M23 | Lakewood, section 22-00016-00-RS | District 01 | 5 | Geske and Sons, Inc. | $778,992 | $856,218 | +10% | IDOT |
| 68K06 | Section D4 | District 04 | 2 | Laser Electric, Inc. | $764,783 | $851,001 | +11% | IDOT |
| 68J46 | Section 116N,TS-1 | District 04 | 4 | Otto Baum Company, Inc. | $749,500 | $759,806 | +1.0% | IDOT |
| 78B58 | Section 129RS-10 | District 09 | 2 | Samron Midwest Contracting, Inc. | $744,591 | $829,831 | +11% | IDOT |
| 72469 | Section (2,3)Q-2 | District 06 | 2 | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company | $739,077 | $806,524 | +9.0% | IDOT |
| 97889 | Valmeyer, section 22-00011-00-RS | District 08 | 2 | Christ Bros. Asphalt, Inc. | $716,678 | $897,245 | +25% | IDOT |
| 70D72 | Section (55)CR | District 05 | 3 | Stark Excavating, Inc. | $684,610 | $789,400 | +15% | IDOT |
| 61M31 | Hoffman Estates, section 22-00111-00-RS | District 01 | 6 | A Lamp Concrete Contractors, Inc. | $631,786 | $650,942 | +3.0% | IDOT |
| 78B37 | Section D9 | District 09 | 3 | E. T. Simonds Construction Company | $600,818 | $610,888 | +2.0% | IDOT |
| 64U97 | Section D2 | District 02 | 5 | Venus Painting Co. | $584,153 | $590,600 | +1.0% | IDOT |
| 72546 | Section (84-9-3,84-10)I-2 | District 06 | 2 | J.C. Dillon, Inc. | $555,264 | $644,964 | +16% | IDOT |
| 61M19 | Bull Valley, section 22-00009-00-RS | District 01 | 6 | Geske and Sons, Inc. | $544,925 | $567,402 | +4.0% | IDOT |
| 78A87 | Section 4TS-2 | District 09 | 1 | F. W. Electric, Inc. | $543,064 | IDOT | ||
| 93845 | Project Number: Yehf-204 / /, section 24-08117-00-BR | District 06 | 4 | Laverdiere Construction, Inc. | $504,870 | $527,900 | +5.0% | IDOT |
| 70H81 | Section D5 | District 05 | 4 | Collins & Hermann, Inc. | $501,796 | $513,695 | +2.0% | IDOT |
| 76V04 | Section DIST | District 08 | 2 | The Daltons Inc. | $414,310 | $577,377 | +39% | IDOT |
| 70H61 | Section (240B)BR-1 | District 05 | 2 | Stark Excavating, Inc. | $414,045 | $515,950 | +25% | IDOT |
| 78B91 | Section D9 | District 09 | 3 | F. W. Electric, Inc. | $404,654 | $434,352 | +7.0% | IDOT |
| 80B56 | Section (1300B-89)BP | District 01 | 3 | Eagle Painting & Maintenance Company, Inc. | $401,758 | $426,428 | +6.0% | IDOT |
| 61M18 | Hazel Crest, section 25-00097-00-RS | District 01 | 5 | Gallagher Asphalt Corporation | $399,778 | $426,537 | +7.0% | IDOT |
| 61L66 | East Dundee, section 24-00050-00-RS | District 01 | 5 | Schroeder Asphalt Services, Inc. | $393,716 | $394,073 | 0.0% | IDOT |
| 68K58 | Section [(12B)BR]BRR | District 04 | 3 | Laverdiere Construction, Inc. | $393,005 | $477,933 | +22% | IDOT |
| 66R95 | Section (23-VB-1)BP | District 03 | 3 | ERA-Valdivia Contractors, Inc. | $389,686 | $814,165 | +109% | IDOT |
| 64U96 | Section D2 | District 02 | 5 | Eagle Painting & Maintenance Company, Inc. | $364,310 | $404,280 | +11% | IDOT |
| 78B83 | Section D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $338,886 | $952,089 | +181% | IDOT |
| 61M21 | Oak Lawn, section 24-00198-00-LT | District 01 | 5 | H & H Electric Co. | $326,553 | $398,947 | +22% | IDOT |
| 76U71 | Section DIST | District 08 | 1 | DMS Contracting, Inc. | $326,472 | IDOT | ||
| 72542 | Section (101RS-13, | District 06 | 3 | Truman L. Flatt & Sons Co., Inc. | $324,366 | $346,175 | +7.0% | IDOT |
| 61M20 | Oak Lawn, section 24-00199-00-LT | District 01 | 5 | H & H Electric Co. | $318,848 | $387,973 | +22% | IDOT |
| 68C43 | Section (55-3)TM | District 04 | 3 | JIMAX Landscape LLC | $314,609 | $358,232 | +14% | IDOT |
| 61M05 | South Holland, section 22-00116-00-RS | District 01 | 5 | K-Five Construction Corporation | $293,000 | $304,778 | +4.0% | IDOT |
| 93842 | Mt. Pulaski, section 24-00013-00-SW | District 06 | 4 | Earth Worx Solutions LLC | $278,650 | $289,482 | +4.0% | IDOT |
| 85790 | Moline, section 24-00299-00-SG | District 02 | 1 | Davenport Electric Contract Company | $249,275 | IDOT | ||
| 68K56 | Section (119BR-3)BRR | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $239,981 | IDOT | ||
| 80B84 | Section 2025-2030-LR | District 01 | 8 | ABC Traffic Safety | $211,275 | $245,079 | +16% | IDOT |
| 66N22 | Section (3)CR-2514 | District 03 | 4 | D. Construction, Inc. | $199,416 | $214,746 | +8.0% | IDOT |
| 66T06 | Section 104(BR-1, | District 03 | 3 | ERA-Valdivia Contractors, Inc. | $181,661 | $235,268 | +30% | IDOT |
| 80B83 | Section 2025-2031-LR | District 01 | 10 | ABC Traffic Safety | $160,313 | $185,963 | +16% | IDOT |
| 74D47 | Section D7 | District 07 | 2 | All States Painting, Inc. | $154,439 | $154,920 | 0.0% | IDOT |
| 72A82 | Section D6 | District 06 | 3 | SKC Construction, Inc. | $153,087 | $164,822 | +8.0% | IDOT |
| 70H66 | Section FY | District 05 | 2 | M & M Concrete, Inc. | $149,515 | $168,871 | +13% | IDOT |
| 46674 | Section D2 | District 02 | 3 | O'Brien Civil Works, Inc. | $147,760 | $161,440 | +9.0% | IDOT |
| 64T23 | Section (141-1)PP | District 02 | 5 | Martin & Company Excavating | $138,615 | $144,389 | +4.0% | IDOT |
| 87886 | Ladd, section 22-00022-00-PP | District 03 | 3 | Universal Asphalt & Excavating, Inc. | $137,248 | $164,616 | +20% | IDOT |
| 66T02 | Section (135BR)BP | District 03 | 3 | ERA-Valdivia Contractors, Inc. | $133,444 | $186,408 | +40% | IDOT |
| 68K59 | Section [(55-2)B,B-1]SLP | District 04 | 2 | Brandt Construction Co. | $128,795 | $139,000 | +8.0% | IDOT |
| 66R93 | Section (97BR-2)BP | District 03 | 3 | ERA-Valdivia Contractors, Inc. | $114,382 | $126,000 | +10% | IDOT |
| 64V15 | Section D2 | District 02 | 4 | Interstate Maintenance, Incorporated | $93,400 | $94,725 | +1.0% | IDOT |
| 74D64 | Section D7 | District 07 | 3 | The Daltons Inc. | $84,942 | $228,897 | +169% | IDOT |
| 64V14 | Section D2 | District 02 | 4 | All States Painting, Inc. | $84,725 | $84,900 | 0.0% | IDOT |
| 64V11 | Section D2 | District 02 | 4 | Pressure Washing Unlimited Inc. | $70,874 | $74,500 | +5.0% | IDOT |
| 64U56 | Section D2 | District 02 | 4 | Louie's Trenching Service, Inc. | $58,728 | $84,355 | +44% | IDOT |
| 66R41 | Section D3 | District 03 | 4 | Freehill Asphalt, Inc. | $57,066 | $65,575 | +15% | IDOT |
| 64V13 | Section D2 | District 02 | 4 | M & M Concrete, Inc. | $50,950 | $59,238 | +16% | IDOT |
| 66R39 | Section D3 | District 03 | 4 | Freehill Asphalt, Inc. | $39,585 | $42,894 | +8.0% | IDOT |
| 68K57 | Section (124BR)SCR | District 04 | 6 | Gillan Construction LLC | $21,865 | $24,360 | +11% | IDOT |
| 64V12 | Section D2 | District 02 | 4 | All States Painting, Inc. | $18,890 | $20,500 | +9.0% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.