IDOT contract 68E33 bid tabulation
Section (3-B)BR. Let by Illinois DOT on February 27, 2026, Marshall, District 04. 4 bids received; low bid $1,706,806 by Gillan Construction LLC.
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 91
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gillan Construction LLC | $1,706,806 | Low |
| 2 | Riber Construction, Inc. | $1,741,586 | +2.0% |
| 3 | Stark Excavating, Inc. | $1,832,155 | +7.0% |
| 4 | Gensini Excavating, Inc. | $2,596,014 | +52% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gillan Construction LLC | 2. Riber Construction, Inc. | 3. Stark Excavating, Inc. | 4. Gensini Excavating, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Bar terminators (X5080530) | EACH | 564 | $29.00 | $27.00 | $25.50 | $32.27 |
| 2 | SPBGR (short radius) (X6330725) | LF | 37.50 | $43.78 | $39.80 | $70.00 | $44.16 |
| 3 | Linear delin panels 4 (X6350204) | EACH | 8 | $31.79 | $28.90 | $74.00 | $32.07 |
| 4 | Fence removal (X6640104) | LF | 49 | $10.51 | $0.01 | $17.00 | $10.60 |
| 5 | GDRL agg eros cont (Z0001002) | TON | 67 | $50.00 | $40.00 | $111.00 | $84.03 |
| 6 | BR approach SHLD rem (Z0001495) | SY | 71 | $32.00 | $45.00 | $52.00 | $10.72 |
| 7 | Approach slab rem (Z0004552) | SY | 118 | $127.00 | $90.00 | $65.00 | $10.70 |
| 8 | Construction layout (Z0013798) | LS | 1 | $15,000 | $20,000 | $9,000.00 | $19,973 |
| 9 | RR prot liability ins (Z0048665) | LS | 1 | $10,000 | $0.01 | $5,000.00 | $11,651 |
| 10 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 | $0.80 |
| 11 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 | $15.00 |
| 12 | Earth excavation (20200100) | CY | 1,430 | $36.00 | $0.01 | $0.01 | $28.20 |
| 13 | Channel excavation (20300100) | CY | 170 | $36.00 | $110.00 | $35.00 | $29.98 |
| 14 | Topsoil F & P 4 (21101615) | SY | 1,325 | $9.25 | $0.01 | $9.25 | $15.31 |
| 15 | Seeding CL 2A (25000210) | ACRE | 0.30 | $5,258.00 | $4,780.00 | $5,010.00 | $5,303.83 |
| 16 | Nitrogen fert nutr (25000400) | LB | 25 | $5.50 | $5.00 | $5.00 | $5.55 |
| 17 | Phosphorus fert nutr (25000500) | LB | 25 | $5.50 | $5.00 | $5.00 | $5.55 |
| 18 | Potassium fert nutr (25000600) | LB | 25 | $5.50 | $5.00 | $5.00 | $5.55 |
| 19 | Mulch method 2 (25100115) | ACRE | 0.30 | $6,908.00 | $6,280.00 | $4,010.00 | $6,968.20 |
| 20 | Erosion contr blanket (25100630) | SY | 1,329 | $2.20 | $2.00 | $1.90 | $2.22 |
| 21 | Temp ditch checks (28000305) | LF | 108 | $12.50 | $15.00 | $15.00 | $26.36 |
| 22 | Perimeter eros bar (28000400) | LF | 457 | $5.50 | $2.00 | $4.50 | $6.63 |
| 23 | Inlet filters (28000510) | EACH | 4 | $200.00 | $50.00 | $250.00 | $285.03 |
| 24 | Stone riprap CL A4 (28100107) | SY | 1,080 | $65.00 | $42.00 | $80.00 | $58.06 |
| 25 | Filter fabric (28200200) | SY | 1,080 | $4.00 | $1.00 | $4.00 | $3.70 |
| 26 | P bit matls tack CT (40600295) | LB | 1,934 | $1.10 | $1.00 | $1.00 | $1.11 |
| 27 | HMA surf rem butt JT (40600982) | SY | 68 | $14.30 | $13.00 | $13.00 | $14.42 |
| 28 | Temporary ramp (40600990) | SY | 34 | $16.50 | $15.00 | $15.00 | $16.64 |
| 29 | P HMA SC IL-9.5 D N50 (40604160) | TON | 113 | $302.00 | $275.00 | $275.00 | $305.14 |
| 30 | Bit matls PR CT (40800025) | LB | 346 | $1.10 | $1.00 | $1.00 | $1.11 |
| 31 | P bit matls tack CT (40800031) | LB | 222 | $1.10 | $1.00 | $1.00 | $1.11 |
| 32 | Incidental HMA surf (40800050) | TON | 52 | $302.00 | $275.00 | $275.00 | $305.14 |
| 33 | PVT con PCC BR app SL (42000080) | SY | 189.70 | $200.00 | $300.00 | $320.00 | $424.48 |
| 34 | Pavement rem (44000100) | SY | 365 | $30.00 | $43.00 | $55.00 | $29.34 |
| 35 | HMA surf rem 1 1/2 (44000155) | SY | 1,072 | $14.30 | $13.00 | $13.00 | $14.42 |
| 36 | HMA shoulders 8 (48203029) | SY | 226 | $159.00 | $145.00 | $145.00 | $160.89 |
| 37 | Rem exist struct N1 (50100300) | EACH | 1 | $115,000 | $109,600 | $90,000 | $227,056 |
| 38 | Structure excavation (50200100) | CY | 305 | $55.00 | $110.00 | $35.00 | $92.45 |
| 39 | Floor drains (50300100) | EACH | 6 | $850.00 | $700.00 | $600.00 | $1,383.94 |
| 40 | Conc struct (50300225) | CY | 83.70 | $1,000.00 | $1,000.00 | $1,000.00 | $2,342.84 |
| 41 | Conc sup-STR (50300255) | CY | 115.90 | $1,575.00 | $2,300.00 | $2,400.00 | $3,253.38 |
| 42 | BR deck grooving (50300260) | SY | 548 | $16.75 | $11.00 | $17.00 | $12.28 |
| 43 | Concrete encasement (50300280) | CY | 5 | $1,200.00 | $160.00 | $2,225.00 | $3,319.25 |
| 44 | Protective coat (50300300) | SY | 654 | $2.00 | $3.50 | $7.15 | $5.10 |
| 45 | Conc supstr app slab (50301350) | CY | 128 | $500.00 | $700.00 | $679.00 | $1,047.08 |
| 46 | F&E PP con beam IL27N (50401305) | LF | 341 | $650.00 | $600.00 | $667.00 | $857.44 |
| 47 | Reinf bars, epoxy CTD (50800205) | LB | 87,410 | $1.55 | $2.00 | $2.10 | $1.57 |
| 48 | Bar splicers (50800515) | EACH | 532 | $48.00 | $50.00 | $53.00 | $51.06 |
| 49 | Fur STL pile HP12X63 (51201610) | LF | 431 | $150.00 | $55.00 | $130.00 | $200.26 |
| 50 | Driving piles (51202305) | LF | 431 | $0.01 | $0.01 | $0.01 | $0.01 |
| 51 | Test pile ST HP12X63 (51203610) | EACH | 1 | $5,000.00 | $50,000 | $8,475.00 | $15,108 |
| 52 | Pile shoes (51204650) | EACH | 12 | $126.00 | $115.00 | $215.00 | $205.27 |
| 53 | Name plates (51500100) | EACH | 1 | $975.00 | $700.00 | $1,160.00 | $1,109.59 |
| 54 | Temp soil reten systm (52200020) | SF | 209 | $150.00 | $100.00 | $210.00 | $296.85 |
| 55 | Pipe elbow 12 (54210182) | EACH | 8 | $250.00 | $325.00 | $327.00 | $779.54 |
| 56 | Metal FL end sec 12" (54262712) | EACH | 4 | $400.00 | $350.00 | $460.00 | $812.83 |
| 57 | Granular backfill STR (58600101) | CY | 129 | $115.00 | $63.95 | $98.00 | $86.69 |
| 58 | Geocomposite wall DR (59100100) | SY | 60 | $22.50 | $20.00 | $47.00 | $70.09 |
| 59 | Pipe drains 12 (60100945) | LF | 56 | $64.00 | $100.00 | $73.00 | $113.80 |
| 60 | P undr for struct 4 (60146304) | LF | 96 | $17.00 | $0.01 | $62.00 | $56.58 |
| 61 | Conc thrust blocks (61000050) | EACH | 4 | $500.00 | $650.00 | $550.00 | $1,292.78 |
| 62 | TY F inlet box 610001 (61000225) | EACH | 4 | $7,500.00 | $7,000.00 | $4,450.00 | $5,914.31 |
| 63 | SPBGR TY A 6FT posts (63000001) | LF | 25 | $41.00 | $37.30 | $40.20 | $41.39 |
| 64 | Traf bar term T2 (63100045) | EACH | 2 | $1,838.00 | $1,671.00 | $2,440.00 | $1,854.12 |
| 65 | Traf bar term T6 (63100085) | EACH | 4 | $4,250.00 | $3,866.00 | $4,760.00 | $4,289.66 |
| 66 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $3,450.00 | $3,144.00 | $3,780.00 | $3,488.54 |
| 67 | Guardrail remov (63200310) | LF | 459 | $9.60 | $0.01 | $9.00 | $9.74 |
| 68 | Perm surv MKRS T1 (66700205) | EACH | 1 | $1,500.00 | $1,500.00 | $360.00 | $2,202.32 |
| 69 | Engr field office A (67000400) | CAL MO | 8 | $3,750.00 | $2,500.00 | $2,070.00 | $3,883.55 |
| 70 | Mobilization (67100100) | LS | 1 | $95,000 | $100,000 | $108,000 | $277,077 |
| 71 | Traf cont-prot 701321 (70100405) | EACH | 1 | $18,920 | $17,200 | $12,000 | $19,418 |
| 72 | Traf cont-prot 701201 (70100450) | LS | 1 | $880.00 | $800.00 | $910.00 | $721.23 |
| 73 | Traf cont-prot 701306 (70100460) | LS | 1 | $880.00 | $800.00 | $680.00 | $721.23 |
| 74 | Traf cont-prot 701326 (70100500) | LS | 1 | $1,760.00 | $1,600.00 | $560.00 | $721.23 |
| 75 | TR cont surveillance (70103815) | CAL DAY | 128 | $0.01 | $0.01 | $0.01 | $0.01 |
| 76 | Temp BR traf signals (70106500) | EACH | 1 | $24,500 | $30,000 | $26,500 | $36,339 |
| 77 | Temp rumble strips (70106700) | EACH | 6 | $825.00 | $750.00 | $1,200.00 | $1,692.12 |
| 78 | Changeable message SN (70107025) | CAL DAY | 28 | $126.00 | $115.00 | $150.00 | $105.41 |
| 79 | SHRT TRM pavt MK rem (70300150) | SF | 1,209 | $0.28 | $0.25 | $1.51 | $1.66 |
| 80 | Temp PVT MK L4 T4 tape (70307120) | LF | 3,482 | $1.93 | $1.75 | $1.60 | $2.22 |
| 81 | Temp PVT MK L24 T4 tape (70307210) | LF | 24 | $11.55 | $10.50 | $9.60 | $11.10 |
| 82 | Temp conc barrier (70400100) | LF | 487.50 | $44.00 | $50.00 | $55.00 | $30.79 |
| 83 | Rel temp conc barrier (70400200) | LF | 487.50 | $15.00 | $15.00 | $13.00 | $15.40 |
| 84 | Imp attn temp NRN TL3 (70600251) | EACH | 2 | $4,200.00 | $3,860.00 | $3,500.00 | $4,993.14 |
| 85 | Imp attn rel PRD TL3 (70600325) | EACH | 2 | $1,800.00 | $1,683.00 | $1,070.00 | $1,386.98 |
| 86 | Terminal marker - DA (72501000) | EACH | 2 | $38.50 | $35.00 | $50.00 | $38.84 |
| 87 | Mod ureth PM line 4 (78009004) | LF | 1,956 | $3.19 | $4.99 | $5.00 | $5.55 |
| 88 | GRV RCSD PVT MRKG 5 (78011025) | LF | 1,956 | $2.20 | $3.64 | $3.70 | $4.04 |
| 89 | Raised refl pavt MKR (78100100) | EACH | 4 | $1,457.00 | $885.00 | $900.00 | $981.98 |
| 90 | Raised ref PVT MK rem (78300200) | EACH | 6 | $50.00 | $50.00 | $39.00 | $185.75 |
| 91 | PVT MKG rem WTR blast (78300202) | SF | 653 | $15.00 | $7.57 | $8.00 | $8.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.