Gillan Construction LLC: IDOT bid record
Gillan Construction LLC submitted 28 bids on Illinois DOT contracts in the data, from 20 JAN 2023 to 18 SEP 2026, and was the low bidder on 4 of them (14%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $2,586,018
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2023 | 1 | 0 | 0% |
| 2025 | 12 | 2 | 17% |
| 2026 | 15 | 2 | 13% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 03 | 21 | 2 | 10% |
| District 02 | 5 | 0 | 0% |
| District 04 | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Filter fabric | 28200200 | SY | 9 | 5 (56%) | $4.00 | $4.65 |
| Bar splicers | 50800515 | EACH | 5 | 5 (100%) | $52.00 | $57.80 |
| Reinf bars, epoxy CTD | 50800205 | LB | 8 | 4 (50%) | $2.90 | $2.50 |
| Stone riprap CL A4 | 28100107 | SY | 7 | 4 (57%) | $82.50 | $95.00 |
| Linear delin panels 4 | X6350204 | EACH | 7 | 4 (57%) | $50.00 | $75.00 |
| Temp info signing | X7200061 | SF | 8 | 3 (38%) | $27.50 | $20.00 |
| Mod ureth PM line 4 | 78009004 | LF | 7 | 3 (43%) | $2.53 | $1.69 |
| Temp BR traf signals | 70106500 | EACH | 7 | 3 (43%) | $17,600 | $15,400 |
| Short term pavt mking | 70300100 | LF | 6 | 3 (50%) | $3.00 | $1.01 |
| PVT MKG rem WTR blast | 78300202 | SF | 9 | 2 (22%) | $9.90 | $2.75 |
| SHRT TRM pavt MK rem | 70300150 | SF | 8 | 2 (25%) | $2.00 | $1.20 |
| Guardrail remov | 63200310 | LF | 8 | 2 (25%) | $9.95 | $8.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D. Construction, Inc. | 14 | 13 of 14 |
| Gensini Excavating, Inc. | 11 | 4 of 11 |
| Advanced Asphalt Company | 7 | 2 of 7 |
| Phoenix Corporation of the Quad Cities | 6 | 2 of 6 |
| Universal Asphalt & Excavating, Inc. | 5 | 1 of 5 |
| Martin & Company Excavating | 5 | 5 of 5 |
| Civil Constructors, Inc. d/b/a/ Helm Civil | 5 | 0 of 5 |
| Riber Construction, Inc. | 5 | 1 of 5 |
| Davis Concrete Construction Co. | 4 | 1 of 4 |
| Alliance Contractors, Inc. | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 66M67 | District 03 | Section (103BR)BR-1 | 2 of 3 | $994,097 | +14% |
| 12 JUN 2026 | 66M84 | District 03 | Section (22X)CR-2546 | 2 of 4 | $531,831 | +20% |
| 24 APR 2026 | 66R63 | District 03 | Section (140C-BR)BRR | 2 of 2 | $506,881 | +2.0% |
| 24 APR 2026 | 66R64 | District 03 | Section (70VBR)BRR | 2 of 3 | $814,379 | +23% |
| 24 APR 2026 | 66R69 | District 03 | Section (22B)BRR | 3 of 4 | $474,643 | +13% |
| 24 APR 2026 | 85797 | District 02 | Project Number: Ysis-006 / /, section 25-00365-00-BR | 2 of 3 | $593,991 | +2.0% |
| 24 APR 2026 | 87909 | District 03 | Marseiles, section 24-00057-00-SW | 5 of 6 | $322,004 | +18% |
| 27 FEB 2026 | 64T23 | District 02 | Section (141-1)PP | 3 of 5 | $145,602 | +5.0% |
| 27 FEB 2026 | 66N22 | District 03 | Section (3)CR-2514 | 3 of 4 | $221,731 | +11% |
| 27 FEB 2026 | 68E33 | District 04 | Section (3-B)BR | 1 of 4 | $1,706,806 | Low, 2.0% under the second |
| 27 FEB 2026 | 68K57 | District 04 | Section (124BR)SCR | 1 of 6 | $21,865 | Low, 11% under the second |
| 27 FEB 2026 | 87886 | District 03 | Ladd, section 22-00022-00-PP | 3 of 3 | $173,737 | +27% |
| 16 JAN 2026 | 64T96 | District 02 | Section (111BR-1)BDR | 3 of 4 | $471,110 | +28% |
| 16 JAN 2026 | 66R77 | District 03 | Section D3 | 4 of 4 | $426,796 | +118% |
| 16 JAN 2026 | 66R85 | District 03 | Section (50-6)T | 3 of 4 | $365,852 | +10% |
| 19 SEP 2025 | 66R59 | District 03 | Section (6)SCR | 2 of 6 | $27,920 | +1.0% |
| 19 SEP 2025 | 87871 | District 03 | Oglesby, section 22-00042-00-SW | 4 of 7 | $361,920 | +28% |
| 01 AUG 2025 | 87904 | District 03 | City Of Lasalle, section 19-00082-00-SW | 3 of 7 | $365,613 | +7.0% |
| 13 JUN 2025 | 46941 | District 03 | Section SR | 2 of 6 | $534,444 | +4.0% |
| 13 JUN 2025 | 64M76 | District 02 | Section 75CR | 2 of 6 | $531,098 | +8.0% |
| 13 JUN 2025 | 64T97 | District 02 | Section (141-1HB)BDR | 3 of 4 | $440,115 | +40% |
| 13 JUN 2025 | 87882 | District 03 | Seneca, section 21-00020-00-BR | 2 of 4 | $561,554 | +5.0% |
| 25 APR 2025 | 66P89 | District 03 | Section (116)DR,T | 1 of 2 | $601,985 | Low, 18% under the second |
| 25 APR 2025 | 66R11 | District 03 | Section 50(1-8)G,SR | 2 of 3 | $1,165,248 | +65% |
| 25 APR 2025 | 66R15 | District 03 | Section (3R,16R,20)G,SR | 2 of 5 | $231,931 | +16% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.