IDOT contract 66R64 bid tabulation

Section (70VBR)BRR. Let by Illinois DOT on April 24, 2026, Lasalle, District 03. 3 bids received; low bid $660,277 by D. Construction, Inc..

Owner
Illinois DOT
Letting
24 APR 2026
Pay items
54
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1D. Construction, Inc.$660,277Low
2Gillan Construction LLC$814,379+23%
3Gensini Excavating, Inc.$919,630+39%
IDOT contract 66R64: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. D. Construction, Inc.2. Gillan Construction LLC3. Gensini Excavating, Inc.
1Anti-graffiti coating (X0327999)SF1,572$36.30$36.30$36.52
2Clean app slab drain (X1300003)EACH6$400.00$700.00$553.30
3Floor drains cleaned (X5030539)EACH8$300.00$450.00$553.30
4Struct steel remov (X5051204)LB77$45.00$30.00$45.10
5Rem & RE-E EX BR rail (X5091742)LF55$90.00$40.00$135.15
6Linear delin panels 4 (X6350204)EACH16$125.00$50.00$55.33
7Linear delin panels 6 (X6350206)EACH8$250.00$60.00$83.00
8Traf cont-prot BLR 21 (X7011800)LS1$0.01$1,100.00$4,315.75
9Temp info signing (X7200061)SF84$30.00$38.50$55.33
10RRPM reflector removl (X7830050)EACH8$40.00$57.00$22.13
11Appr slab repair (PD) (Z0001800)SY5$1,500.00$2,000.00$2,513.05
12Conc curb repair (Z0012500)LF4$250.00$225.00$140.23
13Earth excavation (20200100)CY100$50.00$99.00$99.59
14Sub gran mat B 6 (31101400)SY529$14.00$22.00$22.13
15Bit matls tack CT (40600290)LB476$0.01$1.76$1.77
16Curb rem (44000300)LF319$10.00$2.15$2.16
17Paved SHLD removal (44004250)SY508$20.00$14.30$14.39
18HMA shoulders 10 (48203037)SY529$60.00$93.50$94.06
19Conc rem (50102400)CY27.10$2,500.00$4,000.00$4,628.74
20Protective shield (50157300)SY32$160.00$160.00$304.31
21Conc sup-STR (50300255)CY27.10$2,500.00$4,000.00$5,017.95
22Protective coat (50300300)SY77$1.00$8.00$50.71
23F & E struct steel (50500405)LB121$55.00$45.00$67.32
24Reinf bars, epoxy CTD (50800205)LB3,770$3.50$4.50$4.16
25Bar splicers (50800515)EACH52$65.00$55.00$55.93
26Pref JT strip seal (52000110)LF170$250.00$450.00$283.98
27Anchor bolts 1 (52100520)EACH6$150.00$165.00$216.90
28Deck slab rep (part) (53016000)SY2$1,750.00$2,500.00$6,672.41
29Deck slab rep (FD-T1) (53016001)SY2$2,500.00$3,000.00$6,720.80
30STR rep con DP = < 5 (53212754)SF24$300.00$400.00$1,645.05
31Epoxy crack injection (59000200)LF199$66.00$60.00$38.73
32HMA SHLD curb (66101150)LF319$40.00$25.00$49.08
33Mobilization (67100100)LS1$20,800$45,000$23,660
34Traf cont-prot 701321 (70100405)EACH2$28,896$30,000$29,463
35TR cont & prot 701801 (70102642)EACH1$0.01$1,100.00$2,766.51
36Temp BR traf signals (70106500)EACH2$40,000$22,440$24,013
37Temp rumble strips (70106700)EACH12$1,100.00$1,100.00$995.94
38Changeable message SN (70107025)CAL DAY88$50.00$85.80$165.99
39Short term pavt mking (70300100)LF479$0.01$16.50$2.21
40SHRT TRM pavt MK rem (70300150)SF160$0.01$22.00$4.98
41Temp conc barrier (70400100)LF700$30.00$45.00$89.49
42Rel temp conc barrier (70400200)LF687.50$15.00$15.00$45.56
43Imp attn temp NRN TL3 (70600251)EACH4$7,000.00$5,500.00$3,541.13
44Imp attn rel NRN TL3 (70600352)EACH4$2,500.00$2,750.00$663.96
45Sign panel T1 (72000100)SF15$30.80$77.00$39.96
46Remov sin pan assy TA (72400100)EACH2$104.50$313.00$96.94
47Rem & rel sign panel T2 (72400740)SF11$60.50$71.50$176.25
48Wood sin support (73000100)LF60$28.60$60.00$35.93
49Mod ureth PM line 4 (78009004)LF4,092$2.53$2.53$2.93
50Mod ureth PM line 6 (78009006)LF220$5.06$5.06$4.43
51Replacement reflector (78100300)EACH8$198.00$88.00$44.26
52Grdrail ref type A (78200005)EACH24$30.00$25.00$22.13
53Barr wall ref type C (78200011)EACH21$30.00$25.00$11.07
54PVT MKG rem WTR blast (78300202)SF1,473$3.58$3.40$4.70
IDOT contract 66R64: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 24, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy