D. Construction, Inc.: IDOT bid record

D. Construction, Inc. submitted 466 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 252 of them (54%). When it was not low, its total sat a median +9.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$1,375,648,074
Latest bid
18 SEP 2026
Data through
18 SEP 2026
466Bids
252Low bids
54Win rate, percent
+9.0%Median gap to the low bid when not low, 214 bids

By year

YearBidsLow bidsWin rate
2021893843%
2022734055%
2023633352%
2024803949%
2025865766%
2026754560%
D. Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0129914348%
District 0316410765%
District 022150%
District 0411100%
D. Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB323317 (98%)$0.01$0.01
Trainees TPGZ0076604HR194194 (100%)$15.00$15.00
TraineesZ0076600HR175175 (100%)$0.80$0.80
Raised ref PVT MK rem78300200EACH199136 (68%)$10.00$15.00
Earth excavation20200100CY252114 (45%)$40.00$48.00
HMA SC IL-9.5 D N7040604062TON130108 (83%)$85.38$108.16
Bit matls PR CT40600275LB9897 (99%)$0.01$0.01
HMA SC IL-9.5 D N5040604060TON10881 (75%)$93.50$120.00
Drive pavement rem44000200SY12379 (64%)$12.00$20.00
Pavement rem44000100SY16778 (47%)$15.00$20.30
Protective coat50300300SY13072 (55%)$1.50$3.00
Structure excavation50200100CY9461 (65%)$35.00$46.00
D. Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

D. Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202661M68District 01Montgomery, section 25-00064-00-RS1 of 3$1,466,728Low, 4.0% under the second
18 SEP 202662V55District 01Section FAP2 of 3$3,860,639+4.0%
18 SEP 202664T43District 02Section (37-(3-1,4,5,6))BRR1 of 4$8,698,583Low, 6.0% under the second
18 SEP 202666926District 03Section (1BR)D,(1BR-1)BR-11 of 2$4,253,399Low, 28% under the second
18 SEP 202666M67District 03Section (103BR)BR-11 of 3$868,946Low, 14% under the second
18 SEP 202680B49District 01Section (CIP-617)2 of 6$830,067+9.0%
18 SEP 202680C95District 01Section 2025-2129-RS,SW2 of 5$1,102,760+1.0%
18 SEP 202680D33District 01Section (0909.1)2 of 3$6,692,099+4.0%
31 JUL 202662T84District 01Section FAU1 of 3$1,552,966Low, 38% under the second
31 JUL 202662V45District 01Section FAP1 of 4$1,062,900Low, 7.0% under the second
31 JUL 202662W20District 01Section FAI1 of 6$7,166,048Low, 5.0% under the second
31 JUL 202662X43District 01Section 68B-11 of 4$290,657Low, 11% under the second
31 JUL 202662Y20District 01Section 2025-1070-BDR,BJR2 of 5$1,392,514+13%
31 JUL 202666P22District 03Section (ORCB)BRR-12 of 2$1,918,739+53%
31 JUL 202680B42District 01Section 2025-2020-I1 of 4$1,380,593Low, 32% under the second
31 JUL 202680B44District 01Section (1313VB-VC-WPGM)1 of 5$2,052,202Low, 16% under the second
31 JUL 202680C87District 01Section 2025-2119-RS,DR2 of 3$316,088+10%
12 JUN 202661M42District 01Sugar Grove, section 25-00037-00-RS1 of 4$654,874Low, 3.0% under the second
12 JUN 202661M43District 01Sugar Grove, section 25-00038-00-RS1 of 4$692,262Low, 2.0% under the second
12 JUN 202662L30District 01Section 2020-142-C&DR1 of 6$13,940,412Low, 8.0% under the second
12 JUN 202662T46District 01Section FAU1 of 4$602,552Low, 6.0% under the second
12 JUN 202662V08District 01Section 20231 of 3$1,863,322Low, 57% under the second
12 JUN 202662X28District 01Section (FXB-1R)1 of 3$248,599Low, 33% under the second
12 JUN 202662X52District 01Section 2024-1015-SCR1 of 4$266,169Low, 14% under the second
12 JUN 202666C06District 03Section (G)RS-6&(F)RS-31 of 4$4,185,244Low, 8.0% under the second
D. Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy