IDOT contract 80C95 bid tabulation

Section 2025-2129-RS,SW. Let by Illinois DOT on September 18, 2026, Will, District 01. 5 bids received; low bid $1,094,428 by Gallagher Asphalt Corporation.

Owner
Illinois DOT
Letting
18 SEP 2026
Pay items
99
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gallagher Asphalt Corporation$1,094,428Low
2D. Construction, Inc.$1,102,760+1.0%
3P. T. Ferro Construction Co.$1,127,910+3.0%
4Iroquois Paving Corporation$1,259,724+15%
5Austin Tyler Construction, Inc.$1,284,716+17%
IDOT contract 80C95: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gallagher Asphalt Corporation2. D. Construction, Inc.3. P. T. Ferro Construction Co.4. Iroquois Paving Corporation5. Austin Tyler Construction, Inc.
1Prun safety/equip CLR (K1004595)LS1$11,000$12,100$11,000$9,300.00$11,000
2Constructn layout SPL (X0320050)LS1$4,997.87$10,000$15,000$13,000$5,000.00
3Selective clearing (X2010516)UNIT1$450.00$495.00$450.00$2,070.00$450.00
4Grading & shap SHLDRS (X2020110)UNIT23$274.48$75.00$100.00$252.00$200.00
5Temporary ramp SPL (X4060995)SY162$0.01$0.01$0.01$0.01$15.00
6CC&G RMVL repl < = 10 (X4400501)LF80$53.75$80.00$90.00$92.75$150.00
7CC&G RMVL repl > 10FT (X4400503)LF998$50.75$50.00$65.00$85.00$95.00
8SS cleaned 12 (X5537800)LF450$1.00$1.10$1.00$1.05$1.00
9FR & lids adjust SPL (X6030310)EACH35$1,123.92$900.00$1,000.00$1,925.00$1,500.00
10Centerln rum strip 16 (X6420114)LF430$8.09$21.75$11.70$6.75$8.00
11Engrs FLD ofc TY A D1 (X6700407)CAL MO12$500.00$4,000.00$1.00$1,500.00$3,000.00
12Temp info signing (X7200061)SF494$15.00$30.00$35.00$15.50$15.00
13HS THPL PM LN 4 (X7800815)LF860$5.50$6.05$5.00$5.70$5.50
14Conc FDN TY A 12D (X8780012)LF4$1,000.00$1,100.00$1,000.00$1,035.00$1,000.00
15Drainage STR cleaned (Z0018500)EACH30$350.00$385.00$350.00$360.00$350.00
16RE-optimize TR sig sys 1 (Z0033044)EACH1$3,000.00$3,300.00$3,000.00$3,100.00$3,000.00
17Tree remov 6-15 (20100110)UNIT64$35.00$38.50$35.00$77.60$35.00
18Earth excavation (20200100)CY88$77.76$60.00$75.00$158.00$85.00
19Topsoil F & P 4 (21101615)SY189$12.50$5.50$0.01$10.35$20.00
20Grading & shap ditch (21400100)LF139$13.89$35.00$30.00$27.75$35.00
21Sodding salt tolerant (25200110)SY189$28.00$104.50$100.00$31.00$30.00
22Supple watering (25200200)UNIT2$246.00$330.00$300.00$1.00$100.00
23Bit matls tack CT (40600290)LB13,722$1.13$0.01$0.01$0.01$0.01
24Long joint sealant (40600370)LF13,948$3.18$3.15$3.00$3.15$3.40
25Mix CR JTS flangewys (40600400)TON40$0.01$0.01$0.01$538.50$350.00
26HMA surf rem butt JT (40600982)SY353$0.01$20.00$0.01$0.01$20.00
27HMA BC IL-9.5 N70 (40602985)TON968$91.47$79.00$89.00$108.00$85.00
28HMA SC IL-9.5 D N50 (40604060)TON12$243.02$200.00$235.00$300.00$375.00
29HMA SC IL-9.5 D N70 (40604062)TON2,565$95.68$80.00$89.00$108.00$85.00
30Protective coat (42001300)SY540$0.94$1.00$1.50$2.25$5.00
31PCC driveway pavt 6 (42300200)SY5$298.05$500.00$250.00$112.50$295.00
32PCC driveway pavt 8 (42300400)SY3$436.19$1,000.00$350.00$185.00$495.00
33PC conc sidewalk 5 (42400200)SF3,358$8.60$9.00$10.50$9.30$12.45
34Detectable warnings (42400800)SF393$20.41$25.00$22.00$23.92$40.00
35HMA surf rem 1 3/4 (44000156)SY17,531$2.88$1.85$2.50$2.05$2.25
36HMA surf rem 3 3/4 (44000164)SY8,642$5.93$3.75$3.20$4.35$5.00
37Drive pavement rem (44000200)SY57$45.60$20.00$30.00$19.00$35.00
38Sidewalk rem (44000600)SF3,408$3.18$3.00$3.50$2.50$3.50
39CL D patch T2 12 (44201789)SY20$130.00$120.00$150.00$153.00$245.00
40CL D patch T3 12 (44201794)SY20$130.00$120.00$150.00$153.00$240.00
41CL D patch T4 12 (44201796)SY40$130.00$120.00$130.00$153.00$250.00
42CL D patch T2 15 (44201827)SY106$180.00$145.00$180.00$228.50$280.00
43CL D patch T3 15 (44201831)SY144$180.00$145.00$175.00$202.00$275.00
44CL D patch T4 15 (44201833)SY185$180.00$145.00$145.00$187.00$270.00
45Agg wedge SHLD type B (48102100)TON45$78.70$60.00$60.00$91.50$55.00
46Water valves adjust (56109210)EACH30$361.92$250.00$250.00$262.00$400.00
47Man adjust (60255500)EACH1$329.48$500.00$1,000.00$315.00$450.00
48Inlets adjust (60260100)EACH6$329.48$500.00$500.00$315.00$450.00
49FR & grates adjust (60300105)EACH13$329.48$500.00$500.00$315.00$450.00
50FR & lids adjust (60300305)EACH5$329.48$500.00$500.00$315.00$450.00
51Grates T8 (60402210)EACH1$280.66$600.00$1,000.00$240.00$155.00
52Pipe culv cleaned 12 (60920012)LF40$55.00$60.50$55.00$57.00$55.00
53Pipe culv cleaned 15 (60920015)LF30$65.00$71.50$65.00$67.25$65.00
54Shoulder rum strip 8 (64200108)LF860$6.56$14.30$5.85$4.00$8.00
55Non SPL waste disposl (66900200)CY88$70.00$85.00$100.00$0.01$200.00
56Soil disposal analy (66900530)EACH3$900.00$1,650.00$900.00$1,500.00$940.00
57Reg sub P-const plan (66901001)LS1$4,800.00$2,250.00$4,800.00$3,200.00$4,800.00
58Reg sub F con report (66901003)LS1$500.00$2,250.00$500.00$1,250.00$500.00
59Reg sub mon (66901006)CAL DAY12$715.00$800.00$0.01$700.00$715.00
60Mobilization (67100100)LS1$44,995$40,000$60,000$75,000$52,000
61TR cont & prot 701501 (70102620)LS1$5,102.84$0.01$21,000$11,250$5,200.00
62TR cont & prot 701502 (70102622)LS1$7,143.98$48,519$21,000$7,250.00$7,300.00
63TR cont & prot 701701 (70102635)LS1$2,296.27$0.01$500.00$2,325.00$2,400.00
64TR cont & prot 701801 (70102640)LS1$5,102.84$0.01$500.00$11,250$5,500.00
65Short term pavt mking (70300100)LF6,902$0.01$0.01$1.00$0.01$1.30
66SHRT TRM pavt MK rem (70300150)SF217$0.01$0.01$5.00$0.01$4.00
67Temp PVT MK LTR & sym paint (70300211)SF1,380$0.01$0.01$2.00$0.01$1.70
68Temp PVT MK line 4 - paint (70300221)LF26,832$0.01$0.01$0.30$0.01$0.30
69Temp PVT MK line 6 - paint (70300241)LF3,318$0.01$0.01$0.30$0.01$0.45
70Temp PVT MK line 8 - paint (70300251)LF2,862$0.01$0.01$0.30$0.01$0.75
71Temp PVT MK line 12 - paint (70300261)LF4,782$0.01$0.01$0.75$0.01$0.90
72Temp PVT MK line 24 - paint (70300281)LF900$0.01$0.01$2.00$0.01$1.70
73Temp PVT MK L4 T4 tape (70307120)LF657$2.50$0.01$4.50$0.01$3.50
74Remov sin pan assy TA (72400100)EACH1$250.00$137.50$300.00$260.00$250.00
75Rem & rel sign panel asmbly TA (72400205)EACH3$500.00$412.50$500.00$520.00$500.00
76THPL PVT MK LTR & sym (78000100)SF690$5.50$6.05$5.75$5.70$5.50
77THPL PVT MK line 4 (78000200)LF13,416$0.76$0.84$0.75$0.80$0.76
78THPL PVT MK line 6 (78000400)LF1,659$1.25$1.38$1.25$1.30$1.25
79THPL PVT MK line 8 (78000500)LF1,431$1.65$1.82$1.40$1.70$1.65
80THPL PVT MK line 12 (78000600)LF2,391$2.45$2.70$2.80$2.55$2.45
81THPL PVT MK line 24 (78000650)LF450$5.25$5.78$5.75$5.45$5.25
82Raised refl pavt MKR (78100100)EACH320$46.50$51.15$55.00$48.10$46.50
83Raised ref PVT MK rem (78300200)EACH320$0.01$9.00$0.01$0.01$15.00
84Undrgrd C galvs 2 (81028200)LF231$50.00$55.00$50.00$51.75$50.00
85HD handhole (81400200)EACH4$7,000.00$7,700.00$7,000.00$6,465.00$7,000.00
86Main EX TR sig instal (85000200)EACH1$2,500.00$2,750.00$2,500.00$2,229.00$2,500.00
87Elcbl C signal 14 2C (87301215)LF163$6.00$6.60$6.00$6.20$6.00
88Elcbl C signal 14 3C (87301225)LF168$7.00$7.70$7.00$7.25$7.00
89Elcbl C lead 14 1PR (87301305)LF986$6.00$6.60$6.00$6.20$6.00
90Elcbl C egrdc 6 1C (87301900)LF158$6.00$6.60$6.00$6.20$6.00
91Drill EX handhole (87900200)EACH5$800.00$880.00$800.00$828.00$800.00
92Det loop T1 (88600100)LF1,286$32.00$35.20$32.00$33.00$32.00
93Reloc EX ped sig head (89500200)EACH1$1,000.00$1,100.00$1,000.00$1,035.00$1,000.00
94Reloc EX ped push-but (89500400)EACH1$500.00$550.00$500.00$518.00$500.00
95Reloc EX TS equip (89501250)EACH1$2,000.00$2,200.00$2,000.00$2,070.00$2,000.00
96Rem elcbl FR con (89502300)LF1,125$1.00$1.10$1.00$1.05$1.00
97Rebuild EX handhole (89502376)EACH1$4,000.00$4,400.00$4,000.00$4,140.00$4,000.00
98Remov EX handhole (89502380)EACH4$1,500.00$1,650.00$1,500.00$1,550.00$1,500.00
99Remov EX conc FDN (89502385)EACH1$1,500.00$1,650.00$1,500.00$1,550.00$1,500.00
IDOT contract 80C95: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of September 18, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy