P. T. Ferro Construction Co.: IDOT bid record

P. T. Ferro Construction Co. submitted 133 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 34 of them (26%). When it was not low, its total sat a median +14% above the low bid.

Owner
Illinois DOT
Low bid volume
$59,944,845
Latest bid
18 SEP 2026
Data through
18 SEP 2026
133Bids
34Low bids
26Win rate, percent
+14%Median gap to the low bid when not low, 99 bids

By year

YearBidsLow bidsWin rate
2021251144%
202223522%
202320420%
202423730%
202524521%
202618211%
P. T. Ferro Construction Co., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 011022827%
District 0331619%
P. T. Ferro Construction Co., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB112110 (98%)$0.01$0.01
Trainees TPGZ0076604HR5656 (100%)$15.00$15.00
TraineesZ0076600HR5555 (100%)$0.80$0.80
THPL PVT MK line 678000400LF8353 (64%)$1.25$1.40
THPL PVT MK line 478000200LF9152 (57%)$0.77$0.88
THPL PVT MK line 2478000650LF8347 (57%)$5.75$6.00
Detectable warnings42400800SF6347 (75%)$21.00$37.00
THPL PVT MK line 1278000600LF8445 (54%)$3.00$3.10
Temp info signingZ0030850SF8144 (54%)$20.00$18.00
THPL PVT MK LTR & sym78000100SF7842 (54%)$5.50$5.75
Nitrogen fert nutr25000400LB5436 (67%)$3.00$3.00
Potassium fert nutr25000600LB5435 (65%)$3.00$3.00
P. T. Ferro Construction Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

P. T. Ferro Construction Co., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202680C95District 01Section 2025-2129-RS,SW3 of 5$1,127,910+3.0%
12 JUN 202662L30District 01Section 2020-142-C&DR5 of 6$16,772,291+20%
12 JUN 202666C06District 03Section (G)RS-6&(F)RS-34 of 4$5,645,311+35%
24 APR 202662V71District 01Section FAP2 of 6$2,846,617+1.0%
24 APR 202680B05District 01Section 2025-2018-RS,SW4 of 5$1,743,861+22%
24 APR 202680B07District 01Section 2025-1095-RS4 of 5$1,774,227+12%
24 APR 202680B30District 01Section 2025-2011-RS4 of 5$4,724,351+15%
24 APR 202680B31District 01Section 2025-2012-RS1 of 4$2,127,428Low, 1.0% under the second
24 APR 202680C49District 01Section 2025-2106-RS3 of 5$4,531,713+9.0%
24 APR 202687907District 03Gardner, section 24-00019-00-SW4 of 4$223,387+36%
27 FEB 202662P01District 01Section 2021-064-CR3 of 4$5,612,641+13%
27 FEB 202680B13District 01Section 2025-1086-RS1 of 5$1,424,777Low, 6.0% under the second
16 JAN 202661L81District 01Romeoville, section 25-00080-00-RS3 of 6$614,124+3.0%
16 JAN 202661L99District 01University Park, section 05-00017-00-LS4 of 6$2,337,303+28%
16 JAN 202680B11District 01Section 2025-1099-RS3 of 3$1,560,604+20%
16 JAN 202680B14District 01Section 2025-1087-RS2 of 4$2,049,2980.0%
16 JAN 202680B34District 01Section 2025-2004-RS3 of 6$1,069,082+9.0%
16 JAN 202680B36District 01Section 2025-1088-RS4 of 6$3,427,677+5.0%
07 NOV 202561L73District 01Project Number:, section 21-P4015-00-BT4 of 6$461,168+31%
07 NOV 202562R51District 013 of 4$3,413,216+7.0%
19 SEP 202561L72District 01Lemont, section 24-00060-00-RS1 of 6$1,092,187Low, 1.0% under the second
19 SEP 202562X01District 01Section 2024-981-RS5 of 6$8,834,677+20%
01 AUG 202562V12District 01Section FAU5 of 6$696,909+5.0%
01 AUG 202562X50District 01Section 2024-1012-SW,RS3 of 5$1,007,849+3.0%
01 AUG 202562X86District 01Section 2024-1047-RS3 of 4$268,363+7.0%
P. T. Ferro Construction Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy