Gallagher Asphalt Corporation: IDOT bid record

Gallagher Asphalt Corporation submitted 192 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 36 of them (19%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$51,299,840
Latest bid
18 SEP 2026
Data through
18 SEP 2026
192Bids
36Low bids
19Win rate, percent
+10%Median gap to the low bid when not low, 156 bids

By year

YearBidsLow bidsWin rate
20213925%
202229724%
20232727%
2024301137%
202536617%
202631826%
Gallagher Asphalt Corporation, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 011633119%
District 0329517%
Gallagher Asphalt Corporation, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB179133 (74%)$0.01$0.01
Trainees TPGZ0076604HR9090 (100%)$15.00$15.00
TraineesZ0076600HR8686 (100%)$0.80$0.80
Mix CR JTS flangewys40600400TON12567 (54%)$100.00$270.00
THPL PVT MK line 2478000650LF15262 (41%)$5.50$6.00
THPL PVT MK line 478000200LF16461 (37%)$0.75$0.88
THPL PVT MK LTR & sym78000100SF14157 (40%)$5.30$5.75
THPL PVT MK line 1278000600LF14954 (36%)$2.75$3.10
THPL PVT MK line 678000400LF14953 (36%)$1.20$1.40
Temp info signingZ0030850SF11453 (46%)$20.00$18.00
Raised refl pavt MKR78100100EACH13052 (40%)$40.25$48.00
Engrs FLD ofc TY A D1X6700407CAL MO6447 (73%)$500.00$3,250.00
Gallagher Asphalt Corporation, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Gallagher Asphalt Corporation, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202662V55District 01Section FAP1 of 3$3,712,308Low, 4.0% under the second
18 SEP 202680C95District 01Section 2025-2129-RS,SW1 of 5$1,094,428Low, 1.0% under the second
18 SEP 202680D33District 01Section (0909.1)3 of 3$6,727,018+5.0%
31 JUL 202662V45District 01Section FAP3 of 4$1,174,699+11%
31 JUL 202680B44District 01Section (1313VB-VC-WPGM)3 of 5$2,389,284+16%
31 JUL 202680C87District 01Section 2025-2119-RS,DR1 of 3$288,498Low, 10% under the second
12 JUN 202646952District 01Section WILLIAM2 of 3$3,184,230+1.0%
12 JUN 202661M51District 01Project Number:, section 23-P4062-00-BT2 of 3$3,330,045+5.0%
12 JUN 202666C06District 03Section (G)RS-6&(F)RS-32 of 4$4,526,993+8.0%
12 JUN 202680B17District 01Section 2025-1091-RS2 of 3$233,550+18%
12 JUN 202680B33District 01Section 2025-2014-RS2 of 3$986,378+6.0%
24 APR 202662V71District 01Section FAP3 of 6$2,967,327+5.0%
24 APR 202666T17District 03Section (140,139Z,124CS,10CS,18CS)RS-12 of 2$2,963,228+24%
24 APR 202680B05District 01Section 2025-2018-RS,SW2 of 5$1,477,478+3.0%
24 APR 202680B26District 01Section 2025-2007-RS1 of 3$2,940,592Low, 1.0% under the second
24 APR 202680B30District 01Section 2025-2011-RS2 of 5$4,149,889+1.0%
24 APR 202680B31District 01Section 2025-2012-RS3 of 4$2,262,111+6.0%
24 APR 202680C49District 01Section 2025-2106-RS2 of 5$4,239,696+2.0%
24 APR 202687907District 03Gardner, section 24-00019-00-SW3 of 4$180,778+10%
27 FEB 202661L87District 01Riverdale, section 24-00141-00-RS1 of 5$902,962Low, 4.0% under the second
27 FEB 202661M05District 01South Holland, section 22-00116-00-RS2 of 5$304,778+4.0%
27 FEB 202661M18District 01Hazel Crest, section 25-00097-00-RS1 of 5$399,778Low, 7.0% under the second
27 FEB 202680B13District 01Section 2025-1086-RS3 of 5$1,638,905+15%
16 JAN 202661L81District 01Romeoville, section 25-00080-00-RS6 of 6$676,768+13%
16 JAN 202661L99District 01University Park, section 05-00017-00-LS2 of 6$2,257,272+23%
Gallagher Asphalt Corporation: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy