Kankakee Valley Construction Company, Inc.: IDOT bid record

Kankakee Valley Construction Company, Inc. submitted 65 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 38 of them (58%). When it was not low, its total sat a median +11% above the low bid.

Owner
Illinois DOT
Low bid volume
$155,067,105
Latest bid
31 JUL 2026
Data through
18 SEP 2026
65Bids
38Low bids
58Win rate, percent
+11%Median gap to the low bid when not low, 27 bids

By year

YearBidsLow bidsWin rate
202112975%
2022171271%
202310330%
20249667%
202512542%
20265360%
Kankakee Valley Construction Company, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 03633759%
District 052150%
Kankakee Valley Construction Company, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB4137 (90%)$0.01$0.01
Raised refl pavt MKR78100100EACH2318 (78%)$41.16$48.00
Soil disposal analy66900530EACH2216 (73%)$1,500.00$1,470.00
Reg sub mon66901006CAL DAY2214 (64%)$1,192.50$820.00
Long joint sealant40600370LF2313 (57%)$3.00$3.30
THPL PVT MK line 1278000600LF1413 (93%)$4.91$3.10
Paint PVT MK line 478001110LF1413 (93%)$0.14$1.00
Temp info signingZ0030850SF2012 (60%)$25.00$18.00
Sidewalk rem44000600SF1812 (67%)$3.62$3.00
Nitrogen fert nutr25000400LB1812 (67%)$4.00$3.00
Potassium fert nutr25000600LB1812 (67%)$4.00$3.00
Phosphorus fert nutr25000500LB1812 (67%)$4.00$3.00
Kankakee Valley Construction Company, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Gallagher Asphalt Corporation194 of 19
H. J. Eppel & Co.124 of 12
Advanced Asphalt Company97 of 9
D. Construction, Inc.54 of 5
Scanlon Excavating & Concrete, Inc.41 of 4
Ruben E. Smith Const. dba R & R, Inc.30 of 3
Iroquois Paving Corporation33 of 3
P. T. Ferro Construction Co.31 of 3
M & J Underground Inc.33 of 3
ICC Group Inc.21 of 2
Kankakee Valley Construction Company, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202666M85District 03Section [(37,101)BVB]BR2 of 3$10,443,322+5.0%
24 APR 202666T17District 03Section (140,139Z,124CS,10CS,18CS)RS-11 of 2$2,380,597Low, 24% under the second
24 APR 202687900District 03Project Number: 2Hsr-970 / /, section 22-00201-04-RS1 of 2$805,843Low, 10% under the second
27 FEB 202687910District 03Project Number: Px2V-154 / /, section 25-00412-00-WR2 of 2$1,276,654+4.0%
16 JAN 202666D52District 03Section 1081 of 1$7,195,925Low
13 JUN 202566R18District 03Section (12,13,14)CJS,SR1 of 1$1,599,488Low
13 JUN 202587860District 03Project Number: Kr3Z-125 / /, section 18-00042-03-RS1 of 2$580,188Low, 7.0% under the second
13 JUN 202587874District 03Grant Park, section 21-00017-00-PV2 of 3$3,268,374+16%
13 JUN 202587883District 03Bradley, section 21-00100-00-BT2 of 4$339,254+3.0%
25 APR 202566A85District 03Section (109,110)RS-31 of 3$3,511,811Low, 15% under the second
25 APR 202566M99District 03Section (26,26A)RS,SW2 of 2$3,296,808+24%
25 APR 202566R33District 03Section (7R)RS-22 of 2$2,100,194+8.0%
25 APR 202587862District 03Project Number: 6F7S-297 / /, section 21-00229-00-RS2 of 2$1,671,174+2.0%
07 MAR 202566P95District 03Section (FRONTAGE1 of 3$180,130Low, 6.0% under the second
07 MAR 202566R09District 03Section (12,13)G,SR2 of 2$103,164+17%
07 MAR 202587879District 03Streator, section 24-00107-00-PV2 of 2$1,978,703+18%
17 JAN 202587805District 03Project Number: Dd1S-584 / /, section 08-00286-00-FP1 of 1$9,569,046Low
20 SEP 202466E54District 03Section (112X)RS-4,(11X)RS-2&(12)SFY1 of 1$7,271,812Low
20 SEP 202466P42District 03Section (109,110,111)RS-43 of 3$7,527,768+18%
02 AUG 202466P43District 03Section (99)RS-31 of 1$3,524,732Low
02 AUG 202470H40District 05Section (13R-2)RS2 of 2$799,646+23%
14 JUN 202466H56District 03Section (53-4,53-3,53-2)RS,BRR1 of 1$39,441,550Low
14 JUN 202487801District 03Project Number: Hjjs-619 / /, section 15-00351-00-WR2 of 2$8,441,239+21%
26 APR 202487829District 03Project Number: 000R-893 / /, section 19-00068-03-RS1 of 2$323,707Low, 12% under the second
26 APR 202487831District 03Project Number: 9P1Q-781 / /, section 20-00146-04-RS1 of 2$2,522,672Low, 14% under the second
Kankakee Valley Construction Company, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy