IDOT contract 66R18 bid tabulation

Section (12,13,14)CJS,SR. Let by Illinois DOT on June 13, 2025, Kankakee, District 03. 1 bid received; low bid $1,599,488 by Kankakee Valley Construction Company, Inc..

Owner
Illinois DOT
Letting
13 JUN 2025
Pay items
33
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Kankakee Valley Construction Company, Inc.$1,599,488Low
IDOT contract 66R18: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Kankakee Valley Construction Company, Inc.
1Long par dep rem 2 (X4405020)LF36,480$1.50
2Long part depth patch (X4420900)TON908$135.00
3Temp info signing (X7200061)SF42$25.00
4Exc & GR EX shoulder (20200600)UNIT590$225.00
5Seeding CL 2 (25000200)ACRE14$1,450.00
6Nitrogen fert nutr (25000400)LB1,219$1.00
7Phosphorus fert nutr (25000500)LB1,219$1.00
8Potassium fert nutr (25000600)LB1,219$1.00
9Mulch method 1 (25100105)ACRE14$1,450.00
10Micro-surf, single pass (40400118)SY16,213$5.70
11Bit matls tack CT (40600290)LB16,144$0.01
12Mix CR JTS flangewys (40600400)TON2.40$550.00
13Crack routing (pavt) (45100100)LF21,600$0.10
14Crack filling (45100200)LB10,800$2.47
15HMA shoulders 8 (48203029)SY19,662$41.00
16Shoulder rum strip 8 (64200108)LF57,778$0.16
17Engr field office A (67000400)CAL MO6$3,500.00
18Mobilization (67100100)LS1$97,000
19Traf cont-prot 701306 (70100460)LS1$100.00
20Traf cont-prot 701326 (70100500)LS1$10,600
21TR cont surveillance (70103815)CAL DAY20$0.01
22Short term pavt mking (70300100)LF9,544$0.01
23SHRT TRM pavt MK rem (70300150)SF1,590$0.01
24Pref PL PM TD STD LTR/sym (78004600)SF170.40$52.56
25Pref PL PM TD STD L24 (78004720)LF66$40.47
26Mod ureth PM line 4 (78009004)LF159,807$0.75
27Mod ureth PM line 6 (78009006)LF16,728$1.12
28Mod ureth PM line 8 (78009008)LF1,268$1.49
29Mod ureth PM line 12 (78009012)LF1,124$2.23
30GRV RCSD PM LTR & sym (78011000)SF170.40$12.00
31GRV RCSD PVT MRKG 25 (78011125)LF66$15.00
32Raised refl pavt MKR (78100100)EACH540$36.20
33Raised ref PVT MK rem (78300200)EACH540$0.01
IDOT contract 66R18: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy