IDOT contract 87805 bid tabulation
Project Number: Dd1S-584 / /, section 08-00286-00-FP. Let by Illinois DOT on January 17, 2025, Kankakee, District 03. 1 bid received; low bid $9,569,046 by Kankakee Valley Construction Company, Inc..
- Owner
- Illinois DOT
- Letting
- 17 JAN 2025
- Pay items
- 179
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Kankakee Valley Construction Company, Inc. | $9,569,046 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Kankakee Valley Construction Company, Inc. |
|---|---|---|---|---|
| 1 | Boring TS foundation (XX009634) | EACH | 4 | $2,200.00 |
| 2 | EM veh P S LSC 20 3C (X0324085) | LF | 379 | $1.50 |
| 3 | TS BCKPLT L F PL SPL (X1400318) | EACH | 17 | $450.00 |
| 4 | Topsoil placement (X2111110) | CY | 3,138 | $27.00 |
| 5 | Temp access- priv ent (X4021000) | EACH | 4 | $746.00 |
| 6 | Temp access- com ent (X4022000) | EACH | 4 | $1,670.00 |
| 7 | Temp access- FLD ent (X4024000) | EACH | 7 | $1,238.00 |
| 8 | Rem & rein pipe culv (X5000015) | LF | 115 | $45.00 |
| 9 | Traf cont & prot SPL (X7010216) | LS | 1 | $50,000 |
| 10 | Comb LTG control (X8250091) | EACH | 1 | $3,000.00 |
| 11 | Accessible ped signal (X8760200) | EACH | 2 | $1,500.00 |
| 12 | Confirmation beacon (X8870510) | EACH | 4 | $400.00 |
| 13 | Video veh det sys (X8891001) | EACH | 1 | $47,301 |
| 14 | Construction layout (Z0013798) | LS | 1 | $70,000 |
| 15 | Temp info signing (Z0030850) | SF | 84 | $30.00 |
| 16 | Lum sfty CBL assembly (Z0033020) | EACH | 4 | $200.00 |
| 17 | Temp pavement (Z0062456) | SY | 7,783 | $70.00 |
| 18 | Perm TR signal timing (Z0073509) | EACH | 1 | $2,000.00 |
| 19 | Trainees (Z0076600) | HR | 2,000 | $0.80 |
| 20 | Trainees TPG (Z0076604) | HR | 2,000 | $15.00 |
| 21 | Tree remov 6-15 (20100110) | UNIT | 230 | $28.00 |
| 22 | Tree remov over 15 (20100210) | UNIT | 464 | $39.00 |
| 23 | Earth excavation (20200100) | CY | 29,283 | $30.00 |
| 24 | Rem & disp uns matl (20201200) | CY | 7,556 | $30.00 |
| 25 | Trench backfill (20800150) | CY | 761 | $41.00 |
| 26 | Explor trench 52 (21301052) | LF | 5,332 | $3.50 |
| 27 | Seeding CL 2A (25000210) | ACRE | 6.50 | $1,850.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 585 | $2.00 |
| 29 | Phosphorus fert nutr (25000500) | LB | 585 | $2.00 |
| 30 | Potassium fert nutr (25000600) | LB | 585 | $2.00 |
| 31 | Mulch method 2 (25100115) | ACRE | 6.50 | $1,500.00 |
| 32 | Erosion contr blanket (25100630) | SY | 30,728 | $1.25 |
| 33 | Temp eros contr seed (28000250) | LB | 1,908 | $2.00 |
| 34 | Temp ditch checks (28000305) | LF | 210 | $16.00 |
| 35 | Perimeter eros bar (28000400) | LF | 4,977 | $3.20 |
| 36 | Inlet & pipe protect (28000500) | EACH | 9 | $94.00 |
| 37 | Inlet filters (28000510) | EACH | 69 | $218.00 |
| 38 | Stone riprap CL A4 (28100107) | SY | 17 | $120.00 |
| 39 | Filter fabric (28200200) | SY | 17 | $3.50 |
| 40 | Agg subgrade improve (30300011) | TON | 2,126 | $32.00 |
| 41 | Agg subgrade impr 12 (30300112) | SY | 39,751 | $17.00 |
| 42 | Agg base cse B 6 (35101800) | SY | 1,186 | $15.00 |
| 43 | Agg base cse B 8 (35102000) | SY | 521 | $20.00 |
| 44 | HMA BC wid 10 (35600716) | SY | 216 | $120.00 |
| 45 | Agg surf course TY B (40200800) | TON | 400 | $34.00 |
| 46 | Aggregate-temp access (40201000) | TON | 160 | $61.00 |
| 47 | Bit matls PR CT (40600275) | LB | 2,753 | $0.01 |
| 48 | Bit matls tack CT (40600290) | LB | 2,788 | $0.01 |
| 49 | Long joint sealant (40600370) | LF | 1,386 | $10.00 |
| 50 | Temporary ramp (40600990) | SY | 227 | $0.01 |
| 51 | HMA BC IL-19.0 N70 (40603085) | TON | 284 | $165.00 |
| 52 | HMA SC IL-9.5 D N70 (40604062) | TON | 547 | $120.00 |
| 53 | Incidental HMA surf (40800050) | TON | 186 | $230.00 |
| 54 | PCC PVT 9 1/2 jointd (42000411) | SY | 34,732 | $81.00 |
| 55 | PCC driveway pavt 8 (42300400) | SY | 566 | $100.00 |
| 56 | PC conc sidewalk 4 (42400100) | SF | 491 | $13.25 |
| 57 | Detectable warnings (42400800) | SF | 67 | $50.00 |
| 58 | Pavement rem (44000100) | SY | 21,304 | $16.00 |
| 59 | HMA surf rem 1 1/2 (44000155) | SY | 5,872 | $9.00 |
| 60 | Drive pavement rem (44000200) | SY | 355 | $12.00 |
| 61 | Comb curb gutter rem (44000500) | LF | 233 | $6.00 |
| 62 | Paved ditch removal (44004000) | LF | 27 | $25.00 |
| 63 | CL D patch T4 8 (44201747) | SY | 39 | $120.00 |
| 64 | Aggregate SHLDS B 6 (48101500) | SY | 479 | $20.00 |
| 65 | Pipe culvert remov (50105220) | LF | 331 | $14.00 |
| 66 | Reinforcement bars (50800105) | LB | 3,180 | $1.50 |
| 67 | Expan bolts 3/4 (54002020) | EACH | 14 | $75.00 |
| 68 | Conc box cul (54003000) | CY | 16.90 | $2,100.00 |
| 69 | P cul CL D 1 15 (542D0220) | LF | 161 | $103.00 |
| 70 | P cul CL D 1 18 temp (5421D018) | LF | 30 | $118.00 |
| 71 | PRC flar end sec 12 (54213657) | EACH | 14 | $1,000.00 |
| 72 | PRCF end S EL eqrs 24 (54214719) | EACH | 1 | $1,325.00 |
| 73 | PRCF end S EL eqrs 36 (54214731) | EACH | 1 | $3,000.00 |
| 74 | Metal FL end sec 15" (54262715) | EACH | 10 | $710.00 |
| 75 | Storm sew CL A 1 12 (550A0050) | LF | 302 | $90.00 |
| 76 | Storm sew CL A 1 24 (550A0120) | LF | 952 | $119.00 |
| 77 | Storm sew CL A 2 12 (550A0340) | LF | 283 | $91.00 |
| 78 | Storm sew CL A 2 15 (550A0360) | LF | 1,678 | $100.00 |
| 79 | Storm sew CL A 2 18 (550A0380) | LF | 1,406 | $103.00 |
| 80 | Storm sew CL A 2 24 (550A0410) | LF | 883 | $120.00 |
| 81 | SS CL A 1 eqrs 24 (550A4100) | LF | 1,956 | $178.00 |
| 82 | SS CL A 1 eqrs 36 (550A4500) | LF | 53 | $280.00 |
| 83 | Storm sewer rem 12 (55100500) | LF | 9 | $16.00 |
| 84 | Storm sewer rem 18 (55100900) | LF | 237 | $19.00 |
| 85 | Storm sewer rem 36 (55101600) | LF | 45 | $25.00 |
| 86 | Pipe drains 6 (60100915) | LF | 200 | $36.25 |
| 87 | Pipe drains 8 (60100925) | LF | 200 | $37.60 |
| 88 | Pipe drains 10 (60100935) | LF | 200 | $41.50 |
| 89 | Pipe drains 12 (60100945) | LF | 200 | $42.00 |
| 90 | Pipe drains 15 (60100955) | LF | 200 | $49.00 |
| 91 | Pipe drains 18 (60100965) | LF | 200 | $55.50 |
| 92 | Man TA 4 dia T1F CL (60218400) | EACH | 36 | $4,000.00 |
| 93 | Man TA 4 dia T11F&G (60219300) | EACH | 2 | $4,200.00 |
| 94 | Man TA 5 dia T1F CL (60221100) | EACH | 15 | $4,500.00 |
| 95 | Man TA 7 dia T1F CL (60224446) | EACH | 1 | $9,600.00 |
| 96 | Inlets TA T24F&G (60237470) | EACH | 64 | $1,525.00 |
| 97 | Inlets TB T24F&G (60240328) | EACH | 2 | $2,170.00 |
| 98 | Remov manholes (60500040) | EACH | 1 | $500.00 |
| 99 | Remov inlets (60500060) | EACH | 1 | $250.00 |
| 100 | Comb CC&G TB6.12 (60603800) | LF | 189 | $35.00 |
| 101 | Comb CC&G TY B-6.24 (60605000) | LF | 9,778 | $40.00 |
| 102 | Box cul to BE cleaned (60905305) | LF | 212 | $70.00 |
| 103 | Misc concrete (61100605) | CY | 10 | $1,500.00 |
| 104 | Storm sew prot A 6 (61101007) | LF | 200 | $37.00 |
| 105 | Storm sew prot A 8 (61101009) | LF | 200 | $39.25 |
| 106 | Storm sew prot A 10 (61101011) | LF | 200 | $43.30 |
| 107 | Storm sew prot A 12 (61101013) | LF | 200 | $48.50 |
| 108 | Storm sew prot A 15 (61101017) | LF | 200 | $50.00 |
| 109 | Storm sew prot A 18 (61101020) | LF | 200 | $56.00 |
| 110 | FLD tile jun vault 2D (61133100) | EACH | 3 | $1,200.00 |
| 111 | FLD tile jun vault 3D (61133200) | EACH | 3 | $1,765.00 |
| 112 | FLD tile jun vault 4D (61133300) | EACH | 3 | $3,045.00 |
| 113 | Storm sewer spec 6 (61139900) | LF | 200 | $36.25 |
| 114 | Storm sewer spec 8 (61140000) | LF | 200 | $37.60 |
| 115 | Storm sewer spec 10 (61140100) | LF | 200 | $41.50 |
| 116 | Storm sewer spec 12 (61140200) | LF | 200 | $42.00 |
| 117 | Storm sewer spec 15 (61140400) | LF | 200 | $49.00 |
| 118 | Storm sewer spec 18 (61140600) | LF | 200 | $55.50 |
| 119 | Perm surv MKRS T1 (66700205) | EACH | 2 | $2,325.00 |
| 120 | Non SPL waste disposl (66900200) | CY | 1,841 | $120.00 |
| 121 | Soil disposal analy (66900530) | EACH | 2 | $1,800.00 |
| 122 | Reg sub P-const plan (66901001) | LS | 1 | $2,200.00 |
| 123 | Reg sub F con report (66901003) | LS | 1 | $2,200.00 |
| 124 | Reg sub mon (66901006) | CAL DAY | 5 | $1,190.00 |
| 125 | Mobilization (67100100) | LS | 1 | $400,000 |
| 126 | Changeable message SN (70107025) | CAL DAY | 238 | $27.00 |
| 127 | Short term pavt mking (70300100) | LF | 224 | $0.01 |
| 128 | Temp PVT MK LTR & sym paint (70300211) | SF | 1,763 | $2.95 |
| 129 | Temp PVT MK line 4 - paint (70300221) | LF | 240,954 | $0.16 |
| 130 | Temp PVT MK line 6 - paint (70300241) | LF | 4,172 | $0.24 |
| 131 | Temp PVT MK line 8 - paint (70300251) | LF | 2,876 | $0.32 |
| 132 | Temp PVT MK line 12 - paint (70300261) | LF | 5,292 | $0.50 |
| 133 | Temp PVT MK line 24 - paint (70300281) | LF | 911 | $2.95 |
| 134 | Sign panel T1 (72000100) | SF | 149 | $25.00 |
| 135 | Sign panel T2 (72000200) | SF | 10 | $28.00 |
| 136 | Wood sin support (73000100) | LF | 271 | $26.00 |
| 137 | Mod ureth PM LTR-sym (78009000) | SF | 1,763 | $6.00 |
| 138 | Mod ureth PM line 4 (78009004) | LF | 52,176 | $0.67 |
| 139 | Mod ureth PM line 6 (78009006) | LF | 4,172 | $0.80 |
| 140 | Mod ureth PM line 8 (78009008) | LF | 2,876 | $1.00 |
| 141 | Mod ureth PM line 12 (78009012) | LF | 5,292 | $3.85 |
| 142 | Mod ureth PM line 24 (78009024) | LF | 278 | $6.00 |
| 143 | Raised refl pavt MKR (78100100) | EACH | 249 | $40.00 |
| 144 | PVT MKG rem WTR blast (78300202) | SF | 20,017 | $1.00 |
| 145 | Serv install pole MT (80500020) | EACH | 1 | $3,000.00 |
| 146 | Undrgrd C galvs 4 (81028240) | LF | 389 | $61.00 |
| 147 | Undrgrd C PVC 2 (81028350) | LF | 17 | $20.00 |
| 148 | Undrgrd C PVC 2 1/2 (81028360) | LF | 92 | $24.00 |
| 149 | Undrgrd C PVC 3 (81028370) | LF | 66 | $29.00 |
| 150 | Undrgrd C PVC 4 (81028390) | LF | 64 | $34.00 |
| 151 | HD handhole PCC (81400710) | EACH | 2 | $2,800.00 |
| 152 | DBL handhole PCC (81400720) | EACH | 2 | $4,500.00 |
| 153 | EC C XLP use 3-1C 10 (81702450) | LF | 603 | $2.50 |
| 154 | Lum LED rdwy G (82110007) | EACH | 4 | $625.00 |
| 155 | Rem LT unit salv (84200500) | EACH | 2 | $750.00 |
| 156 | Rem pole FDN (84200804) | EACH | 2 | $750.00 |
| 157 | Fac T4 cab (85700200) | EACH | 1 | $26,300 |
| 158 | Uninter power sup ext (86200300) | EACH | 1 | $8,400.00 |
| 159 | Elcbl C signal 14 2C (87301215) | LF | 221 | $2.00 |
| 160 | Elcbl C signal 14 3C (87301225) | LF | 601 | $2.00 |
| 161 | Elcbl C signal 14 5C (87301245) | LF | 1,238 | $2.00 |
| 162 | Elcbl C signal 14 7C (87301255) | LF | 1,957 | $2.00 |
| 163 | Elcbl C serv 6 2C (87301805) | LF | 62 | $8.00 |
| 164 | Elcbl C egrdc 6 1C (87301900) | LF | 525 | $4.00 |
| 165 | TS post galvs 10 (87502440) | EACH | 1 | $2,850.00 |
| 166 | TS post galvs 16 (87502500) | EACH | 3 | $2,950.00 |
| 167 | STL comb maa&P 48 (87702970) | EACH | 2 | $26,000 |
| 168 | STL comb maa&P 60 (87703030) | EACH | 2 | $30,000 |
| 169 | Conc FDN TY A (87800100) | LF | 16 | $275.00 |
| 170 | Conc FDN TY C (87800150) | LF | 4 | $650.00 |
| 171 | Conc FDN TY E 36D (87800415) | LF | 26 | $500.00 |
| 172 | Conc FDN TY E 42D (87800420) | LF | 42 | $700.00 |
| 173 | SH P LED 1F 3S BM (88040070) | EACH | 2 | $1,700.00 |
| 174 | SH P LED 1F 3S mam (88040090) | EACH | 5 | $1,825.00 |
| 175 | SH P LED 1F 5S BM (88040150) | EACH | 5 | $2,600.00 |
| 176 | SH P LED 1F 5S mam (88040160) | EACH | 5 | $2,750.00 |
| 177 | Ped SH P LED 1F BM CT (88102825) | EACH | 2 | $750.00 |
| 178 | Light detector (88700200) | EACH | 4 | $1,600.00 |
| 179 | Light detector amp (88700300) | EACH | 1 | $3,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 17, 2025. Compiled by Mirage Metrics.