ICC Group Inc.: IDOT bid record
ICC Group Inc. submitted 65 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 16 of them (25%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $175,770,400
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 19 | 1 | 5% |
| 2022 | 9 | 4 | 44% |
| 2023 | 9 | 3 | 33% |
| 2024 | 15 | 4 | 27% |
| 2025 | 6 | 1 | 17% |
| 2026 | 7 | 3 | 43% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 24 | 5 | 21% |
| District 04 | 16 | 5 | 31% |
| District 03 | 12 | 1 | 8% |
| District 05 | 5 | 2 | 40% |
| District 02 | 4 | 1 | 25% |
| District 06 | 2 | 0 | 0% |
| District 07 | 2 | 2 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 42 | 42 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 40 | 40 (100%) | $0.80 | $0.80 |
| Changeable message SN | 70107025 | CAL DAY | 42 | 34 (81%) | $37.50 | $55.00 |
| Bit matls tack CT | 40600290 | LB | 37 | 28 (76%) | $0.01 | $0.01 |
| Perimeter eros bar | 28000400 | LF | 38 | 27 (71%) | $2.75 | $3.50 |
| Traf bar term T6 | 63100085 | EACH | 34 | 27 (79%) | $3,937.50 | $4,400.00 |
| Guardrail remov | 63200310 | LF | 37 | 26 (70%) | $7.00 | $8.00 |
| TR bar TRM T1 SPL tan | 63100167 | EACH | 35 | 26 (74%) | $3,469.14 | $3,800.00 |
| Nitrogen fert nutr | 25000400 | LB | 33 | 24 (73%) | $3.00 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 33 | 24 (73%) | $3.00 | $3.00 |
| Reinf bars, epoxy CTD | 50800205 | LB | 51 | 23 (45%) | $1.76 | $2.50 |
| Terminal marker - DA | 72501000 | EACH | 32 | 23 (72%) | $40.00 | $47.85 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| D. Construction, Inc. | 18 | 15 of 18 |
| Lorig Construction Company | 16 | 12 of 16 |
| Dunnet Bay Construction Company | 14 | 8 of 14 |
| Herlihy Mid-Continent Company | 12 | 7 of 12 |
| Stark Excavating, Inc. | 11 | 9 of 11 |
| F. H. Paschen, S.N. Nielsen & Associates LLC | 10 | 3 of 10 |
| White Construction LLC | 10 | 6 of 10 |
| Civil Constructors, Inc. d/b/a/ Helm Civil | 9 | 7 of 9 |
| Granite Construction Company | 8 | 2 of 8 |
| Areatha Construction Co., Inc. | 7 | 4 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 61L85 | District 01 | Project Number: 50B4-000 / /, section 18-00488-00-BR | 1 of 5 | $4,751,000 | Low, 12% under the second |
| 18 SEP 2026 | 66926 | District 03 | Section (1BR)D,(1BR-1)BR-1 | 2 of 2 | $5,461,000 | +28% |
| 18 SEP 2026 | 68E86 | District 04 | Section (72-3HB-3)BR | 3 of 3 | $5,574,500 | +27% |
| 31 JUL 2026 | 62W20 | District 01 | Section FAI | 4 of 6 | $8,395,000 | +17% |
| 31 JUL 2026 | 66M85 | District 03 | Section [(37,101)BVB]BR | 1 of 3 | $9,933,000 | Low, 5.0% under the second |
| 24 APR 2026 | 85798 | District 02 | Project Number: Fgub-532 / /, section 18-00661-00-BR | 1 of 2 | $4,934,200 | Low, 17% under the second |
| 16 JAN 2026 | 62K65 | District 01 | Section 2019-192-B-R | 3 of 7 | $14,884,500 | +11% |
| 01 AUG 2025 | 68898 | District 04 | Section (10R-VBY)BR | 1 of 2 | $23,160,000 | Low, 1.0% under the second |
| 13 JUN 2025 | 68E44 | District 04 | Section (15B-1)BP,BRR;(14HB-1)BRR | 2 of 2 | $73,694,000 | +5.0% |
| 25 APR 2025 | 61G79 | District 01 | Naperville, section 06-00133-00-BR | 4 of 4 | $38,108,000 | +15% |
| 25 APR 2025 | 68G27 | District 04 | Section (103-I-8)BR | 2 of 2 | $6,562,700 | +94% |
| 25 APR 2025 | 70H54 | District 05 | Section (10-33,33)PP | 2 of 4 | $488,600 | +10% |
| 07 MAR 2025 | 62P43 | District 01 | Section 2021-120-BR | 7 of 7 | $19,132,000 | +37% |
| 13 DEC 2024 | 62T30 | District 01 | Section FAP | 5 of 8 | $1,933,000 | +30% |
| 08 NOV 2024 | 61J87 | District 01 | Barrington, section 11-00087-02-GS | 2 of 7 | $71,912,000 | +4.0% |
| 14 JUN 2024 | 62M79 | District 01 | Section 2018-067-BR | 2 of 3 | $24,328,000 | +7.0% |
| 14 JUN 2024 | 62W48 | District 01 | Section 15-00131-01-BR | 1 of 3 | $8,563,500 | Low, 3.0% under the second |
| 14 JUN 2024 | 66K66 | District 03 | Section [(06-2B-1) | 3 of 3 | $25,693,000 | +6.0% |
| 14 JUN 2024 | 66P06 | District 03 | Section (50-4B)BR-1 | 2 of 2 | $1,525,800 | +12% |
| 14 JUN 2024 | 68E35 | District 04 | Section (48-29B)BR | 3 of 4 | $15,559,000 | +8.0% |
| 14 JUN 2024 | 68H22 | District 04 | Section 62-(3B-1;3B;3HB-2)BRR | 1 of 1 | $2,310,000 | Low |
| 14 JUN 2024 | 87722 | District 03 | Kirkland, section 14-00009-00-BR | 4 of 4 | $4,195,000 | +29% |
| 26 APR 2024 | 62L31 | District 01 | Section 2020-143-BR | 2 of 2 | $19,150,000 | +24% |
| 26 APR 2024 | 68880 | District 04 | Section (72-2BVB)BRR | 2 of 2 | $23,390,500 | +2.0% |
| 26 APR 2024 | 70254 | District 05 | Section (10-33HB-2)BR | 1 of 4 | $17,670,000 | Low, 5.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.