Granite Construction Company submitted 27 bids on Illinois DOT contracts in the data, from 23 APR 2021 to 31 JUL 2026, and was the low bidder on 3 of them (11%). When it was not low, its total sat a median +19% above the low bid.

Owner
Illinois DOT
Low bid volume
$6,043,965
Latest bid
31 JUL 2026
Data through
18 SEP 2026
27Bids
3Low bids
11Win rate, percent
+19%Median gap to the low bid when not low, 24 bids

By year

YearBidsLow bidsWin rate
2021600%
2022300%
20233133%
2024400%
2025300%
20268225%
Granite Construction Company, IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0126312%
District 05100%
Granite Construction Company, IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR2222 (100%)$15.00$15.00
TraineesZ0076600HR1818 (100%)$0.80$0.80
Bit matls tack CT40600290LB2015 (75%)$0.01$0.01
Changeable message SN70107025CAL DAY1810 (56%)$30.00$55.00
Perimeter eros bar28000400LF179 (53%)$3.80$3.50
Reg sub mon66901006CAL DAY188 (44%)$755.00$820.00
Non SPL waste disposl66900200CY178 (47%)$55.00$92.99
Raised refl pavt MKR78100100EACH118 (73%)$50.15$48.00
Tree remov 6-1520100110UNIT118 (73%)$18.00$35.00
Reinf bars, epoxy CTD50800205LB217 (33%)$1.68$2.50
Mod ureth PM line 478009004LF177 (41%)$3.18$1.69
Trench backfill20800150CY167 (44%)$53.50$55.00
Granite Construction Company, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Granite Construction Company, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202661M13District 01Project Number: Qnyf-462 / /, section 12-00192-04-BR6 of 6$43,967,555+20%
31 JUL 202680C90District 01Section (1616-VB-WPGM)2 of 3$2,464,588+1.0%
12 JUN 202680C97District 01Section 2025-2134-I2 of 3$733,790+1.0%
12 JUN 202680D36District 01Section (G-R)1 of 2$900,000Low, 21% under the second
24 APR 202661M15District 01Mount Prospect, section 21-00174-00-BR3 of 3$12,862,046+20%
16 JAN 202662K62District 01Section 2019-189-BR3 of 5$21,698,686+11%
16 JAN 202662K64District 01Section 2019-191-B-R3 of 5$16,455,656+18%
16 JAN 202662Y09District 01Section 2025-1066-I1 of 2$2,400,000Low, 19% under the second
13 JUN 202560R76District 01Section 99-1HB-2-BR3 of 3$6,417,816+55%
13 JUN 202562Y04District 01Section (1293-BR)BR5 of 5$950,158+37%
07 MAR 202562P43District 01Section 2021-120-BR6 of 7$18,169,960+30%
13 DEC 202462T30District 01Section FAP8 of 8$2,135,417+43%
08 NOV 202461J87District 01Barrington, section 11-00087-02-GS7 of 7$81,069,663+17%
08 NOV 202462B66District 01Section (125S-1)I-43 of 3$19,574,122+26%
14 JUN 202462M79District 01Section 2018-067-BR3 of 3$25,619,421+12%
22 SEP 202362P11District 01Section 2021-074-BR&BP1 of 3$2,743,965Low, 7.0% under the second
16 JUN 202362H52District 01Section 2018-125-B-R3 of 3$18,253,993+26%
20 JAN 202362A53District 01Section WR(2)-R-16 of 6$11,521,816+32%
17 JUN 202262P55District 01Section 2021-137-BR2 of 4$931,787+34%
11 MAR 202261H62District 01Westchester, section 15-00083-00-BR7 of 9$1,354,453+19%
21 JAN 202262H49District 01Section 2018-133-BR3 of 7$22,513,115+5.0%
05 NOV 202161H28District 01Highland Park, section 15-00123-00-BR5 of 8$4,110,775+24%
05 NOV 202162M28District 01Section 2020-168-BR2 of 6$1,143,000+15%
05 NOV 202162M30District 01Section 2020-170-BR6 of 7$2,463,000+13%
11 JUN 202162G39District 01Section 22-36HB-110 of 10$21,727,006+28%
Granite Construction Company: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy