IDOT letting results, June 12, 2026

184 contracts let by Illinois DOT on June 12, 2026, $693,323,851 in low bids, a median of 2 bidders per contract.

Owner
Illinois DOT
Contracts
184
Low bids, total
$693,323,851
Data through
18 SEP 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
76M95Section 95-(3,4)RS-2District 083Samron Midwest Contracting, Inc.$74,388,393$88,925,753+20%IDOT
62U72Section FAPDistrict 015Martam Construction Incorporated$52,825,490$52,996,8410.0%IDOT
62R61Section FAIDistrict 013OHLA Central, Inc.$43,537,120$53,351,721+23%IDOT
62W99Section (0404-316-HB)District 015K-Five Construction Corporation$25,555,133$26,948,965+5.0%IDOT
76V17Section 60-(6,7,8,9)RS-2,(60-7HB)BJR,BDRDistrict 081The Kilian Corporation & Christ Brothers Asphalt & Keeley & Sons, Inc. tri-venture$24,110,330IDOT
70794Section 57-7RS-4,57-8RS-3District 051Rowe Construction, a div of UCM, Inc.$20,217,017IDOT
66A91Section (50-2)RS-6(50-3)RS-7District 031Advanced Asphalt Company$19,753,741IDOT
66K39Section (27-38B)BR-1District 031Stark Excavating, Inc.$19,725,609IDOT
74705Section (58-63HVB)BRDistrict 073William Charles Construction Company, LLC$18,795,822$18,955,053+1.0%IDOT
64L94Section 104RDistrict 024Valley Construction Co.$14,149,820$14,585,886+3.0%IDOT
62L30Section 2020-142-C&DRDistrict 016D. Construction, Inc.$13,940,412$15,122,173+8.0%IDOT
74D52Section (DX,BX)RS-2&(CX,BX-1)RS-3District 071Howell Paving, Inc.$12,896,618IDOT
68C93Section 72[6RS;(6-1)RS-1]District 042Advanced Asphalt Company$10,996,119$11,150,809+1.0%IDOT
72491Section 27RS-7,TS-3;District 063Illinois Valley Paving, a div of UCM, Inc.$10,156,787$10,247,828+1.0%IDOT
72639Section (1-2)SR,District 061Illinois Valley Paving, a div of UCM, Inc.$9,677,201IDOT
74D55Section (58-20)RS-1District 071Illinois Valley Paving, a div of UCM, Inc.$9,289,444IDOT
68J59Section (126X)RS-4;127RS-5;(108-HB)BRRDistrict 041R. A. Cullinan and Son, a div of UCM, Inc.$9,263,926IDOT
64V40Section ((81-2)RDistrict 021Valley Construction Co.$8,996,139IDOT
68J70Section (5,11)RS-4;114RS-6;(4-BR)BRRDistrict 042Advanced Asphalt Company$8,498,702$9,117,146+7.0%IDOT
70D62Section (101)BRDistrict 052William Charles Construction Company, LLC$7,986,429$8,768,622+10%IDOT
72D29Section (1,2)RS-9,SRDistrict 061Diamond Construction Company$7,745,903IDOT
64N73Section (20-1,District 021Civil Constructors, Inc. d/b/a/ Helm Civil$7,439,990IDOT
80B22Section 2025-2001-RSDistrict 014K-Five Construction Corporation$7,389,202$7,931,346+7.0%IDOT
72601Section (75-3VHB-1)BDR,BP,BJRDistrict 062Freesen, a div of UCM, Inc.$6,980,801$7,710,087+10%IDOT
62W82Section 2024-956-TSDistrict 013H & H Electric Co.$6,878,841$8,866,667+29%IDOT
78A85Section D9District 092E. T. Simonds Construction Company$5,912,328$6,151,363+4.0%IDOT
68J72Section 124RS-6;123RS-5District 041Advanced Asphalt Company$5,423,600IDOT
68J15Section (18HB)BRR;35RS-12;17RS-8District 041R. A. Cullinan and Son, a div of UCM, Inc.$5,373,982IDOT
72J41Section 10(RS-3,BDR);127RS-4District 061W. L. Miller Company$5,301,849IDOT
76U97Section DISTDistrict 081Illini Excavation & Reclamation, Inc.$5,201,570IDOT
76R36Section 82-8-BJR-BDR-BP-1District 082The Kilian Corporation$4,888,194$5,153,969+5.0%IDOT
76R32Section 1-BR-1District 082Stutz Excavating, Inc.$4,611,184$6,337,170+37%IDOT
78B49Section (41-8)PP-1,R-1District 092Samron Midwest Contracting, Inc.$4,558,321$5,300,922+16%IDOT
68K19Section 32RS-10District 041Gunther Construction, a div of UCM, Inc.$4,415,604IDOT
66C06Section (G)RS-6&(F)RS-3District 034D. Construction, Inc.$4,185,244$4,526,993+8.0%IDOT
87859Project Number: Udka-723 / /, section 21-00317-00-RSDistrict 031Iroquois Paving Corporation$3,970,513IDOT
80B28Section 2025-2009-RSDistrict 015K-Five Construction Corporation$3,929,710$3,949,808+1.0%IDOT
64S70Section (101,District 022Rock Road Companies, Inc.$3,817,934$4,547,696+19%IDOT
76V09Section DISTDistrict 081Keeley & Sons, Inc.$3,642,071IDOT
80C96Section 2025-2130-TR,LSDistrict 011Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc.$3,638,649IDOT
62X37Section 2024-1003-LSDistrict 011Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc.$3,580,280IDOT
76V18Section 82-(8,9,10)I-2District 082The Kilian Corporation$3,286,837$3,395,218+3.0%IDOT
78791Section 136-1(B-2)District 092Samron Midwest Contracting, Inc.$3,285,578$3,424,464+4.0%IDOT
72459Section 120RS-3District 061Illinois Valley Paving, a div of UCM, Inc.$3,193,703IDOT
68J31Section 8RS-4District 041R. A. Cullinan and Son, a div of UCM, Inc.$3,191,255IDOT
61M51Project Number:, section 23-P4062-00-BTDistrict 013Martam Construction Incorporated$3,179,237$3,330,045+5.0%IDOT
80B23Section 2025-2002-RSDistrict 013Plote Construction, Inc.$3,171,166$3,428,288+8.0%IDOT
46952Section WILLIAMDistrict 013K-Five Construction Corporation$3,153,771$3,184,230+1.0%IDOT
68K18Section 11RS-13District 041R. A. Cullinan and Son, a div of UCM, Inc.$3,147,460IDOT
80B87Section 2025-2046-RSDistrict 014Builders Paving, LLC$3,116,448$3,235,013+4.0%IDOT
99772Project Number: Gqhq-960 / /, section 23-00119-00-RSDistrict 091E. T. Simonds Construction Company$3,108,776IDOT
46678Section D4District 044RoadSafe Traffic Systems, Inc.$3,083,382$3,698,523+20%IDOT
97897Project Number: Nkap-092 / /, section 23-00074-01-RSDistrict 081Christ Bros. Asphalt, Inc.$3,056,088IDOT
76V03Section DISTDistrict 084Capital Industrial Services, LLC$2,933,300$4,968,520+69%IDOT
76U38Section DISTDistrict 081Gerstner Electric, Inc.$2,898,157IDOT
61L30Campton Hills, section 24-00012-00-FPDistrict 014Builders Paving, LLC$2,893,888$2,899,4510.0%IDOT
80B35Section 2025-2003-RSDistrict 014K-Five Construction Corporation$2,873,926$2,889,889+1.0%IDOT
72547Section 101RS-7,District 063P. H. Broughton & Sons, Inc.$2,868,316$2,879,6880.0%IDOT
66T39Section (50-3,4,5,8)PP-2District 032G. M. Sipes Construction, Inc.$2,815,825$3,976,471+41%IDOT
68J56Section (10R)RS-8District 041R. A. Cullinan and Son, a div of UCM, Inc.$2,771,058IDOT
64V39Section ((19X-1)RS-1)PP&RSDistrict 021Civil Constructors, Inc. d/b/a/ Helm Civil$2,734,393IDOT
80C89Section 2026-2160-TSDistrict 012H & H Electric Co.$2,718,198$3,939,373+45%IDOT
78A13Section D9District 092E. T. Simonds Construction Company$2,686,720$2,734,148+2.0%IDOT
76V08Section DISTDistrict 081Keeley & Sons, Inc.$2,580,521IDOT
66N45Section (06-3HB)BRDistrict 033D. Construction, Inc.$2,414,143$2,910,375+21%IDOT
64V42Section ((8Z&(32W&32WZ))RS&SWDistrict 021Civil Constructors, Inc. d/b/a/ Helm Civil$2,381,280IDOT
80D00Section 2025-2137-RS,SWDistrict 013Plote Construction, Inc.$2,322,000$2,926,808+26%IDOT
61M46Northbrook, section 21-00181-00-RSDistrict 012Builders Paving, LLC$2,247,439$2,308,804+3.0%IDOT
76U82Section 82-3HVB-BDR-1District 081Keeley & Sons, Inc.$2,195,979IDOT
66T36Section D3District 032Kujo, Inc.$2,101,221$2,392,514+14%IDOT
80C48Section 2025-2105-RSDistrict 012Peter Baker & Son Co.$2,084,785$3,269,937+57%IDOT
62W83Section 2024-957-TSDistrict 014H & H Electric Co.$2,052,267$2,326,258+13%IDOT
76U96Section DISTDistrict 081Electrico, Inc.$2,003,468IDOT
78C24Section 8RS-4District 092Samron Midwest Contracting, Inc.$1,989,087$2,147,904+8.0%IDOT
72J76Section (11BR,10B-1,10B-5)BDRDistrict 063Otto Baum Company, Inc.$1,870,400$1,924,874+3.0%IDOT
62V08Section 2023District 013D. Construction, Inc.$1,863,322$2,921,524+57%IDOT
74D54Section (7,6)&(5,4)RS-3District 072Howell Paving, Inc.$1,860,730$1,939,522+4.0%IDOT
76V13Section DISTDistrict 082Gerstner Electric, Inc.$1,847,416$3,025,900+64%IDOT
61M49Maywood, section 23-00142-00-LTDistrict 014Sjostrom & Sons, Inc.$1,709,017$1,776,250+4.0%IDOT
99771Project Number: I8Tv-074- / /, section 19-00222-00-RSDistrict 091E. T. Simonds Construction Company$1,680,906IDOT
89892Project Number: Pvhm-146 / /, section 26-00000-00-PPDistrict 041A. C. Pavement Striping Co.$1,647,297IDOT
95997Vandalia, section 21-00070-00-SWDistrict 075McCarthy Improvement Company$1,645,985$1,787,605+9.0%IDOT
78C25Section 111RS-4District 092Samron Midwest Contracting, Inc.$1,618,916$1,771,542+9.0%IDOT
68J50Section 4RS-6District 042Brandt Construction Co.$1,613,831$1,927,448+19%IDOT
80C45Section 2025-2102-RSDistrict 014Peter Baker & Son Co.$1,605,106$1,622,323+1.0%IDOT
97899East St. Louis, section 22-00235-01-RSDistrict 081Hank's Excavating & Landscaping, Inc.$1,579,164IDOT
46679Section D4District 043Precision Pavement Markings Inc.$1,560,696$1,564,3370.0%IDOT
68K21Section 35RS-5District 042Gunther Construction, a div of UCM, Inc.$1,549,883$1,923,179+24%IDOT
68K93Section (72-7)L-1;[72(8,9);90-11]L-2District 042Oberlander Electric Co.$1,451,503$1,569,347+8.0%IDOT
95A06Project Number: 3B9T-264 / /, section 20-00083-00-FPDistrict 071Dunn Company (Tyrolt Incorporated)$1,257,379IDOT
78B59Section 127RS-6District 092Samron Midwest Contracting, Inc.$1,230,184$1,427,189+16%IDOT
87851Project Number: 7M6S-350 / /, section 23-00306-00-BRDistrict 033Riber Construction, Inc.$1,225,921$1,365,431+11%IDOT
80B77Section 2025-2037-I,PPDistrict 012D. Construction, Inc.$1,130,242$1,169,328+3.0%IDOT
76U77Section 29-2(BDR,BRR,BJR)District 082Samron Midwest Contracting, Inc.$1,125,909$1,371,616+22%IDOT
97884Godfrey, section 23-00036-00-RSDistrict 082Stutz Excavating, Inc.$1,096,234$1,351,754+23%IDOT
76U76Section 82-3HVB-2BDRDistrict 082Keeley & Sons, Inc.$1,093,567$1,371,476+25%IDOT
93848Project Number: Vjxw-669 / /, section 23-00223-00-FPDistrict 061Diamond Construction Company$1,087,655IDOT
80D46Section 2026-2181-C,HBKDistrict 017Curran Contracting Company$1,087,000$1,146,156+5.0%IDOT
99770Project Number: Ex1H-054 / /, section 23-00045-00-RSDistrict 091Samron Midwest Contracting, Inc.$1,079,783IDOT
93857Project Number: Lt3F-488 / /, section 21-00057-01-SCDistrict 061Illinois Valley Paving, a div of UCM, Inc.$1,074,717IDOT
74B79Section D7District 072Sangamo Construction Company$1,036,447$1,162,469+12%IDOT
87895Project Number: Bzbk-106 / /, section 24-00130-08-WRDistrict 031Iroquois Paving Corporation$967,933IDOT
78977Section 5N-3District 092Samron Midwest Contracting, Inc.$967,393$1,545,603+60%IDOT
80B33Section 2025-2014-RSDistrict 013D. Construction, Inc.$933,943$986,378+6.0%IDOT
46918Section M-WDistrict 043Phoenix Corporation of the Quad Cities$923,507$1,069,500+16%IDOT
80D36Section (G-R)District 012Granite Construction Company$900,000$1,085,121+21%IDOT
62V78Section FAPDistrict 011Mosley Construction 1, LLC$850,529IDOT
76U54Section (107,108)RS-4District 083Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company$830,276$861,289+4.0%IDOT
68K85Section D4District 042Oberlander Electric Co.$790,676$822,171+4.0%IDOT
64T58Section (109BR)BRRDistrict 022Civil Constructors, Inc. d/b/a/ Helm Civil$784,183$934,035+19%IDOT
66T60Section TREEDistrict 032Homer Tree Service, Inc.$769,735$1,759,260+129%IDOT
66T32Section 2026-1District 031Semper Fi Yard Service, Inc. d/b/a Semper Fi Land Service, Inc.$764,070IDOT
70F48Section LEROY,TOWANDA,BLOOMDistrict 052H. J. Eppel & Co.$763,289$995,684+30%IDOT
76V06Section DISTDistrict 083Homer Tree Service, Inc.$762,370$1,363,061+79%IDOT
61M44West Dundee, section 24-00059-00-RSDistrict 013Geske and Sons, Inc.$754,807$762,070+1.0%IDOT
64T07Section (116BR)&(117BR-1)BDRDistrict 022Martin & Company Excavating$747,738$749,7680.0%IDOT
95A12Project Number: Kxzm-943 / /, section 25-00301-00-PPDistrict 071Howell Paving, Inc.$732,605IDOT
80C97Section 2025-2134-IDistrict 013Rausch Infrastructure, LLC$727,711$733,790+1.0%IDOT
64U86Section D2District 024Alliance Contractors, Inc.$727,514$741,371+2.0%IDOT
66M92Section ((125)CR-2588,CR-2589)District 035Iroquois Paving Corporation$705,367$793,348+12%IDOT
68K90Section 137PP-1,RA;102PP-1District 041R. A. Cullinan and Son, a div of UCM, Inc.$693,984IDOT
61M43Sugar Grove, section 25-00038-00-RSDistrict 014D. Construction, Inc.$692,262$703,188+2.0%IDOT
85791Rockton, section 22-00044-00-BTDistrict 024N-Trak Group LLC$659,834$698,189+6.0%IDOT
61M42Sugar Grove, section 25-00037-00-RSDistrict 014D. Construction, Inc.$654,874$672,288+3.0%IDOT
80B58Section 2025-2022-DRDistrict 011MYS, Incorporated$652,635IDOT
97827Project Number: K9Xl-969 / /, section 19-00276-07-PWDistrict 083Hank's Excavating & Landscaping, Inc.$649,527$910,220+40%IDOT
68K96Section (15W)PPDistrict 041R. A. Cullinan and Son, a div of UCM, Inc.$649,043IDOT
80B47Section (267-1212.2-15D)District 012Areatha Construction Co., Inc.$641,982$643,4360.0%IDOT
74D42Section D7District 073Phoenix Corporation of the Quad Cities$641,335$969,969+51%IDOT
66T45Section (50-6)PP-1District 033G. M. Sipes Construction, Inc.$639,792$648,919+1.0%IDOT
64T47Section (102BR-1)BRRDistrict 022Martin & Company Excavating$618,490$626,999+1.0%IDOT
78B94Section D9District 091Brown Electric, Inc.$612,761IDOT
85794City Of Rock Island, section 22-00209-00-SWDistrict 025Centennial Contractors of the Quad Cities, Inc.$609,125$699,792+15%IDOT
62T46Section FAUDistrict 014D. Construction, Inc.$602,552$639,954+6.0%IDOT
78C10Section 101BRR-1District 092E. T. Simonds Construction Company$583,277$587,311+1.0%IDOT
85792Project Number: Kne2-268 / /, section 23-00185-17-PPDistrict 022W K Construction Company, Inc.$582,004$769,411+32%IDOT
62V77Section FAPDistrict 011Mosley Construction 1, LLC$579,146IDOT
93858Project Number: 4F1E-236 / /, section 24-00146-01-PPDistrict 063A. C. Pavement Striping Co.$578,700$616,289+6.0%IDOT
76U98Section DISTDistrict 081Electrico, Inc.$573,010IDOT
72509Section (54-1,2)HL-1District 062Bodine Electric of Decatur$569,259$609,405+7.0%IDOT
76U81Section DISTDistrict 082M & M Concrete, Inc.$560,000$1,155,400+106%IDOT
70H86Section D5District 052Cross Construction, Inc.$526,225$631,309+20%IDOT
72E72Section (34-1,34-2)SRDistrict 061W. L. Miller Company$514,275IDOT
80B51Section (29R-SF)District 012Capital Industrial Services, LLC$493,330$589,677+20%IDOT
61M53Wheeling, section 23-00095-00-RSDistrict 013Builders Paving, LLC$478,613$493,502+3.0%IDOT
66M84Section (22X)CR-2546District 034D. Construction, Inc.$443,941$531,831+20%IDOT
76V12Section (Z-1)PP-1District 081Kinney Contractors, Inc.$414,711IDOT
78C15Section D9District 094Eagle Painting & Maintenance Company, Inc.$409,970$567,067+38%IDOT
80B66Section (3233-211-VB)District 014Lorig Construction Company$397,833$457,975+15%IDOT
70J03Section D5District 052Civil Coatings and Construction Inc.$396,171$440,000+11%IDOT
66T09Section (WS)PP-2District 034Iroquois Paving Corporation$388,737$438,215+13%IDOT
68K98Section (106,105)PPDistrict 041Advanced Asphalt Company$376,414IDOT
66T29Section (115,116)District 033G. M. Sipes Construction, Inc.$372,960$469,880+26%IDOT
97903Collinsville, section 23-00106-00-TLDistrict 082Gerstner Electric, Inc.$361,779$461,298+28%IDOT
66R94Section (32-1)BPDistrict 032Civil Coatings and Construction Inc.$356,186$365,966+3.0%IDOT
64T46Section (115BR)BRRDistrict 023Martin & Company Excavating$353,100$358,892+2.0%IDOT
64V31Section D2District 022RoadSafe Traffic Systems, Inc.$349,356$478,638+37%IDOT
93854Pana, section 24-00057-00-SWDistrict 062Phoenix Corporation of the Quad Cities$347,507$370,886+7.0%IDOT
78C13Section 40(SLP-1)District 091Samron Midwest Contracting, Inc.$328,825IDOT
78C20Section D9District 091F. W. Electric, Inc.$318,316IDOT
76U86Section 103PDistrict 084Eagle Painting & Maintenance Company, Inc.$314,406$394,031+25%IDOT
97896Worden, section 24-00013-00-SWDistrict 083Stutz Excavating, Inc.$295,673$327,927+11%IDOT
74D51Section D7District 072Collins & Hermann, Inc.$289,716$329,479+14%IDOT
95996Teutopolis, section 23-00022-00-PVDistrict 075A&A Concrete LLC$274,477$311,700+14%IDOT
70H72Section MBPMDistrict 054MYS, Incorporated$267,850$344,000+28%IDOT
62X52Section 2024-1015-SCRDistrict 014D. Construction, Inc.$266,169$303,313+14%IDOT
62X28Section (FXB-1R)District 013D. Construction, Inc.$248,599$331,246+33%IDOT
64V25Section (1&2)RSDistrict 022Martin & Company Excavating$241,756$315,861+31%IDOT
66T10Section (1B-1)BRRDistrict 032Riber Construction, Inc.$236,720$248,215+5.0%IDOT
72552Section 145DRDistrict 063Phoenix Corporation of the Quad Cities$216,139$235,755+9.0%IDOT
74E26Section (12Z,12,13)SRDistrict 072Phoenix Corporation of the Quad Cities$205,339$232,159+13%IDOT
80B17Section 2025-1091-RSDistrict 013Iroquois Paving Corporation$197,734$233,550+18%IDOT
72E76Section (84-5-1HB,2HB)BRRDistrict 062William Charles Construction Company, LLC$185,585$186,4420.0%IDOT
62V63Section FAPDistrict 012SKC Construction, Inc.$184,544$414,178+124%IDOT
89864Aledo, section 24-00051-00-SWDistrict 044Phoenix Corporation of the Quad Cities$180,475$182,213+1.0%IDOT
72E71Section (54-3)I-4District 062Otto Baum Company, Inc.$162,400$261,085+61%IDOT
66T40Section LITTERDistrict 035The Final Connection, Inc.$153,733$217,421+41%IDOT
72512Section (69-2B-2)BDRDistrict 064Freesen, a div of UCM, Inc.$145,221$149,403+3.0%IDOT
66T42Section LITTERDistrict 036The Final Connection, Inc.$75,170$98,736+31%IDOT
74D58Section D7District 071Mt. Carmel Stabilization Group, Inc.$70,388IDOT
66T11Section (1B)BC-5District 033All States Painting, Inc.$58,232$104,593+80%IDOT
66T12Section (111BR-1)BC-4District 033All States Painting, Inc.$57,414$84,532+47%IDOT
72E73Section (112B-1)BRR,IDistrict 064Otto Baum Company, Inc.$56,000$78,850+41%IDOT
66T41Section LITTERDistrict 036The Final Connection, Inc.$49,729$72,539+46%IDOT
IDOT contracts let on June 12, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy