Gerstner Electric, Inc.: IDOT bid record

Gerstner Electric, Inc. submitted 43 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 22 of them (51%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$36,559,952
Latest bid
18 SEP 2026
Data through
18 SEP 2026
43Bids
22Low bids
51Win rate, percent
+10%Median gap to the low bid when not low, 21 bids

By year

YearBidsLow bidsWin rate
20219222%
20224125%
202333100%
20247457%
202512650%
20268675%
Gerstner Electric, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 08191263%
District 0912758%
District 044250%
District 053133%
District 07300%
District 06200%
Gerstner Electric, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Drill EX handhole87900200EACH1311 (85%)$245.00$465.00
Reg sub mon66901006CAL DAY98 (89%)$1,150.00$820.00
Remov EX TS equip89502375EACH136 (46%)$1,045.00$2,720.00
Soil disposal analy66900530EACH96 (67%)$1,200.00$1,470.00
Elcbl C signal 14 5C87301245LF86 (75%)$2.17$2.50
Lum LED rdwy G82110007EACH66 (100%)$679.00$907.50
Undrgrd C PVC 281028350LF105 (50%)$18.00$27.00
Remov lighting contr84500110EACH85 (63%)$542.50$968.79
Sign panel T172000100SF75 (71%)$50.00$31.00
Elcbl C egrdc 6 1C87301900LF75 (71%)$4.20$3.25
Rem elcbl FR con89502300LF65 (83%)$0.50$0.85
Elcbl C signal 14 7C87301255LF65 (83%)$3.12$2.90
Gerstner Electric, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202678C30District 09Section (5-4)TS-51 of 1$212,000Low
12 JUN 202676U38District 08Section DIST1 of 1$2,898,157Low
12 JUN 202676V13District 08Section DIST1 of 2$1,847,416Low, 64% under the second
12 JUN 202697903District 08Collinsville, section 23-00106-00-TL1 of 2$361,779Low, 28% under the second
24 APR 202676R78District 08Section (130,130-1,130-2)TS-3,82-5TS1 of 1$3,960,000Low
27 FEB 202678B00District 09Section D91 of 2$2,170,000Low, 18% under the second
27 FEB 202678B91District 09Section D92 of 3$434,352+7.0%
16 JAN 202674D37District 07Section D73 of 3$482,000+45%
19 SEP 202568K24District 04Section 72(7-9)L2 of 5$1,839,800+4.0%
19 SEP 202568K25District 04Section 72[(8-9)L-1,(10)L];(90-11)L1 of 5$1,018,866Low, 19% under the second
19 SEP 202570H51District 05Section HMLT2025-13 of 5$942,500+8.0%
01 AUG 202576T74District 08Section 60-7L,60-6L2 of 3$2,442,000+22%
01 AUG 202578916District 09Section D91 of 1$1,302,315Low
13 JUN 202574C97District 07Section (58-62)HL2 of 2$3,626,227+36%
13 JUN 202576T77District 08Section 132-4TS1 of 2$678,250Low, 3.0% under the second
13 JUN 202576U25District 08Section DIST1 of 2$669,700Low, 79% under the second
13 JUN 202578A33District 09Section (1X-1)TS-62 of 2$1,095,000+4.0%
13 JUN 202578B05District 09Section D91 of 2$116,085Low, 78% under the second
13 JUN 202578B06District 09Section (29X,8X)TS-22 of 2$508,200+3.0%
17 JAN 202578998District 09Section D91 of 2$1,954,250Low, 13% under the second
08 NOV 202474D00District 07Section D72 of 2$433,550+24%
26 APR 202476M86District 08Section 82-3,1 of 4$8,855,930Low, 42% under the second
26 APR 202476R94District 08Section 82-1L-11 of 2$351,983Low, 71% under the second
26 APR 202476T45District 08Section DIST1 of 3$346,843Low, 7.0% under the second
26 APR 202476T53District 08Section DIST2 of 3$272,719+4.0%
Gerstner Electric, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy