IDOT contract 78B91 bid tabulation
Section D9. Let by Illinois DOT on February 27, 2026, Jackson, District 09. 3 bids received; low bid $404,654 by F. W. Electric, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 32
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | F. W. Electric, Inc. | $404,654 | Low |
| 2 | Gerstner Electric, Inc. | $434,352 | +7.0% |
| 3 | Brown Electric, Inc. | $447,327 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. F. W. Electric, Inc. | 2. Gerstner Electric, Inc. | 3. Brown Electric, Inc. |
|---|---|---|---|---|---|---|
| 1 | Grund rod 8' copper (XP000179) | EACH | 28 | $337.57 | $235.00 | $230.00 |
| 2 | Cellular modem (X0325922) | EACH | 1 | $7,441.25 | $6,630.00 | $8,485.85 |
| 3 | Conc foundation GR MT (X7340100) | CY | 0.50 | $5,460.42 | $5,178.00 | $760.00 |
| 4 | Accessible ped signal (X8760200) | EACH | 6 | $1,173.07 | $1,315.00 | $1,369.00 |
| 5 | Vid & rad hyb det sys (X8891301) | EACH | 2 | $60,677 | $53,000 | $66,486 |
| 6 | TS batt backup system (Z0033068) | EACH | 2 | $10,927 | $11,300 | $11,500 |
| 7 | Mobilization (67100100) | LS | 1 | $8,840.83 | $34,756 | $8,000.00 |
| 8 | TR cont & prot 701601 (70102630) | LS | 1 | $19,110 | $1,000.00 | $12,000 |
| 9 | TR cont & prot 701701 (70102635) | LS | 1 | $13,910 | $1,000.00 | $10,000 |
| 10 | TR cont & prot 701801 (70102640) | LS | 1 | $6,760.21 | $1.00 | $1,680.00 |
| 11 | Changeable message SN (70107025) | CAL DAY | 112 | $217.57 | $107.00 | $135.00 |
| 12 | Sign panel T1 (72000100) | SF | 60 | $91.55 | $65.00 | $67.00 |
| 13 | Locate undergr cable (80300100) | LF | 570 | $1.94 | $9.70 | $3.80 |
| 14 | Serv install GRND MT (80500010) | EACH | 2 | $5,850.21 | $12,050 | $10,300 |
| 15 | Undrgrd C CNC 2 (81028750) | LF | 40 | $57.10 | $30.00 | $82.60 |
| 16 | Undrgrd C CNC 3 (81028770) | LF | 254 | $16.33 | $110.00 | $58.00 |
| 17 | Undrgrd C CNC 4 (81028790) | LF | 316 | $15.94 | $42.00 | $62.00 |
| 18 | EC C XLP use 3-1C 10 (81702450) | LF | 255 | $4.35 | $3.20 | $4.90 |
| 19 | LT cont pedm 240V 60 (82500330) | EACH | 1 | $9,035.10 | $8,000.00 | $9,984.00 |
| 20 | Fac T5 cab (85700300) | EACH | 2 | $33,107 | $37,285 | $37,130 |
| 21 | Elcbl C signal 14 7C (87301255) | LF | 1,300 | $2.63 | $3.25 | $5.15 |
| 22 | Elcbl C serv 6 3C (87301815) | LF | 50 | $6.27 | $7.00 | $39.70 |
| 23 | Elcbl C egrdc 6 1C (87301900) | LF | 1,030 | $2.24 | $6.00 | $5.58 |
| 24 | Conc FDN TY C (87800150) | LF | 6 | $563.37 | $1,470.00 | $1,172.00 |
| 25 | Drill EX handhole (87900200) | EACH | 12 | $552.55 | $400.00 | $490.00 |
| 26 | SH LED 1F 3S mam (88030020) | EACH | 2 | $1,194.75 | $1,120.00 | $922.00 |
| 27 | SH LED 1F 3S BM (88030050) | EACH | 2 | $1,121.95 | $1,055.00 | $916.00 |
| 28 | SH LED 1F 4S BM (88030070) | EACH | 6 | $1,303.95 | $1,300.00 | $1,116.00 |
| 29 | SH LED 1F 4S mam (88030080) | EACH | 6 | $1,389.75 | $1,375.00 | $1,221.00 |
| 30 | Ped SH LED 1F BM CDT (88102717) | EACH | 6 | $1,108.95 | $1,090.00 | $975.00 |
| 31 | TS backplate (88200100) | EACH | 16 | $484.28 | $355.00 | $365.00 |
| 32 | Remov EX TS equip (89502375) | EACH | 2 | $2,210.21 | $8,500.00 | $7,200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.