Brown Electric, Inc.: IDOT bid record
Brown Electric, Inc. submitted 12 bids on Illinois DOT contracts in the data, from 11 JUN 2021 to 12 JUN 2026, and was the low bidder on 7 of them (58%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $3,267,483
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 2 | 1 | 50% |
| 2022 | 2 | 2 | 100% |
| 2023 | 1 | 1 | 100% |
| 2025 | 4 | 2 | 50% |
| 2026 | 3 | 1 | 33% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Changeable message SN | 70107025 | CAL DAY | 5 | 4 (80%) | $105.00 | $55.00 |
| Conc FDN TY C | 87800150 | LF | 5 | 3 (60%) | $933.00 | $864.50 |
| Locate undergr cable | 80300100 | LF | 5 | 3 (60%) | $4.00 | $5.92 |
| Remov EX TS equip | 89502375 | EACH | 7 | 2 (29%) | $4,064.00 | $2,720.00 |
| Undrgrd C PVC 4 | 81028390 | LF | 6 | 2 (33%) | $61.31 | $42.64 |
| EC C XLP use 3-1C 10 | 81702450 | LF | 5 | 2 (40%) | $4.90 | $4.35 |
| Fac T5 cab | 85700300 | EACH | 5 | 2 (40%) | $37,130 | $32,072 |
| Elcbl C egrdc 6 1C | 87301900 | LF | 7 | 1 (14%) | $4.48 | $3.25 |
| Serv install GRND MT | 80500010 | EACH | 5 | 1 (20%) | $10,300 | $4,918.00 |
| Grund rod 8' copper | XP000179 | EACH | 5 | 1 (20%) | $310.00 | $205.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Gerstner Electric, Inc. | 7 | 5 of 7 |
| F. W. Electric, Inc. | 3 | 1 of 3 |
| Wissehr Electric, Inc. | 1 | 1 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 78B94 | District 09 | Section D9 | 1 of 1 | $612,761 | Low |
| 27 FEB 2026 | 78B00 | District 09 | Section D9 | 2 of 2 | $2,568,409 | +18% |
| 27 FEB 2026 | 78B91 | District 09 | Section D9 | 3 of 3 | $447,327 | +11% |
| 13 JUN 2025 | 78A33 | District 09 | Section (1X-1)TS-6 | 1 of 2 | $1,056,436 | Low, 4.0% under the second |
| 13 JUN 2025 | 78B05 | District 09 | Section D9 | 2 of 2 | $207,030 | +78% |
| 13 JUN 2025 | 78B06 | District 09 | Section (29X,8X)TS-2 | 1 of 2 | $493,996 | Low, 3.0% under the second |
| 17 JAN 2025 | 78998 | District 09 | Section D9 | 2 of 2 | $2,207,503 | +13% |
| 20 JAN 2023 | 78909 | District 09 | Section (8X,103)TS-2,SW-1 | 1 of 2 | $412,836 | Low, 1.0% under the second |
| 29 APR 2022 | 78857 | District 09 | Section 101TS-2 | 1 of 1 | $294,174 | Low |
| 29 APR 2022 | 78880 | District 09 | Section D9 | 1 of 1 | $287,973 | Low |
| 11 JUN 2021 | 78856 | District 09 | Section (19,19-1)L-1,TS-1;(29,8)TS-2 | 3 of 4 | $95,629 | +10% |
| 11 JUN 2021 | 78867 | District 09 | Section D9 | 1 of 1 | $109,307 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.