IDOT letting results, April 29, 2022

185 contracts let by Illinois DOT on April 29, 2022, $589,793,671 in low bids, a median of 2 bidders per contract.

Owner
Illinois DOT
Contracts
185
Low bids, total
$589,793,671
Data through
18 SEP 2026

Contracts let that day

ContractProjectDistrictBidsLow bidderLow bidSecond bidGapSource
70C01Section 10-(33,34,5,14)RDistrict 051William Charles Construction Company, LLC and White Construction, LLC JV$125,999,995IDOT
76F79Section 61-(1,1-1,1-2,2)RS-1District 081Baxmeyer Construction, Inc.$68,555,777IDOT
62P45Section 2021-118-RDistrict 013Judlau Contracting, Inc.$41,677,110$43,488,793+4.0%IDOT
68F87Section 102(3RS-2,4RS);(62-2)RS-1District 041Advanced Asphalt Company$25,968,870IDOT
68A36Section (32,33)RS-2;34RS-4District 041Gunther Construction, a div of UCM, Inc.$20,211,670IDOT
70A89Section 10[33RS-5(34-1,35,36,37)RS-3]District 051Open Road Paving Company LLC$11,189,394IDOT
70A57Section (114,115)RS-3&(74,10-70)RS-4District 051Open Road Paving Company LLC$8,224,171IDOT
74A07Section (8-2)RS-1District 071Howell Paving, Inc.$7,730,802IDOT
70C20Section (120)RS-3&(121)RS-4District 052Cross Construction, Inc.$7,699,822$7,887,106+2.0%IDOT
66K73Section (06-1HB-2District 032D. Construction, Inc.$7,246,218$7,599,567+5.0%IDOT
66L90Section (24,25)RS-3District 032Iroquois Paving Corporation$5,795,600$5,900,711+2.0%IDOT
66J64Section (7,6)RS-3District 032Curran Contracting Company$5,740,762$5,970,791+4.0%IDOT
66K57Section (101)RS-2,SWDistrict 031Advanced Asphalt Company$5,628,157IDOT
62L68Section 2020-090-RS&SWDistrict 011Peter Baker & Son Co.$5,588,006IDOT
89789Project Number: M04I-435 / /, section 18-00029-00-PVDistrict 044Otto Baum Company, Inc.$5,288,286$5,518,126+4.0%IDOT
61H71Glenview, section 15-00190-00-PVDistrict 013Alliance Contractors, Inc.$5,262,614$5,507,225+5.0%IDOT
89819Project Number:, section 18-00043-01-BRDistrict 041Brandt Construction Co.$5,031,097IDOT
66D60Section (121,122)RS-3District 031Iroquois Paving Corporation$4,931,854IDOT
76P22Section (26-1,District 082The Kilian Corporation$4,893,775$4,962,559+1.0%IDOT
62N20Section 2020-250-BYDistrict 015P. T. Ferro Construction Co.$4,699,500$4,779,272+2.0%IDOT
61H47Western Springs, section 16-00094-00-PVDistrict 014Berger Excavating Contractors, Inc.$4,645,651$4,868,055+5.0%IDOT
70994Section (120,121)RS-1District 051Rowe Construction, a div of UCM, Inc.$4,611,308IDOT
91598Project Number: Hctl-915 / /, section 18-00137-00-SPDistrict 052Open Road Paving Company LLC$4,333,829$4,410,305+2.0%IDOT
66L73Section (1R,1R-1)RS-3District 032Kankakee Valley Construction Company, Inc.$4,199,388$4,313,778+3.0%IDOT
72E46Section (101District 061Illinois Valley Paving, a div of UCM, Inc.$4,068,912IDOT
68F44Section 122RS-3;123RS-5District 042Brandt Construction Co.$3,999,605$6,998,837+75%IDOT
62M46Section 2020-158-RS&SWDistrict 013Arrow Road Construction Co.$3,917,529$3,957,680+1.0%IDOT
66L50Section (34)RS-7&(7)RS-4,SWDistrict 032Curran Contracting Company$3,744,002$3,921,007+5.0%IDOT
70778Section 128RS-3District 051Rowe Construction, a div of UCM, Inc.$3,718,559IDOT
62P32Section 2021-107-RS&SWDistrict 013Builders Paving, LLC$3,626,380$3,928,561+8.0%IDOT
93782Project Number: 0T94-200 / /, section 21-00111-00-RSDistrict 062K. E. Vas Company$3,589,509$3,753,770+5.0%IDOT
66A79Section (5,6,7,8)RS-5District 031Advanced Asphalt Company$3,588,523IDOT
74965Section 9RS-3District 071Howell Paving, Inc.$3,573,359IDOT
87750City Of Dekalb, section 15-00185-00-WRDistrict 032William Charles Construction Company, LLC$3,514,800$3,577,778+2.0%IDOT
66F91Section (R-4)CRDistrict 032Gensini Excavating, Inc.$3,420,890$4,894,876+43%IDOT
72N02Section 25RS-10District 062Illinois Valley Paving, a div of UCM, Inc.$3,393,682$3,610,382+6.0%IDOT
62N77Section 2021-018-RS&SWDistrict 013Arrow Road Construction Co.$3,382,411$3,993,993+18%IDOT
87787Streator, section 18-00101-00-RSDistrict 033Tobey's Construction & Cartage, Inc.$3,357,439$3,576,475+7.0%IDOT
70B04Section (250,251)RS,(10-7)RS-1District 051Open Road Paving Company LLC$3,225,471IDOT
66L03Section (125)RS-6,District 031Kankakee Valley Construction Company, Inc.$3,153,189IDOT
62P10Section 2021-073-BDRDistrict 017P. T. Ferro Construction Co.$3,123,305$3,394,831+9.0%IDOT
62N99Section 2021-083-RS&SWDistrict 015K-Five Construction Corporation$3,113,352$3,145,840+1.0%IDOT
74797Section 12ZRS-2District 071Howell Paving, Inc.$2,955,277IDOT
74B13Section 109RS-3District 071Ambraw Asphalt Materials, Inc.$2,951,194IDOT
62N23Section 2020-251-BRDistrict 015Lorig Construction Company$2,831,222$2,863,861+1.0%IDOT
62N98Section 2021-085-RSDistrict 014Iroquois Paving Corporation$2,684,806$2,868,841+7.0%IDOT
85716City Of Rock Island, section 19-00195-00-TLDistrict 023McCarthy Improvement Company$2,616,940$2,741,051+5.0%IDOT
62P47Section 2021-116-RSDistrict 013Plote Construction, Inc.$2,590,116$2,727,727+5.0%IDOT
61G32Project Number: Lqz2-494 / /, section 16-08112-01-BRDistrict 016Lorig Construction Company$2,279,677$2,281,6150.0%IDOT
66E51Section (F)RS-5District 034D. Construction, Inc.$2,116,332$2,128,427+1.0%IDOT
93784Project Number: Hwvq-638 / /, section 20-00068-00-PPDistrict 064Beniach Construction Co., Inc.$2,097,266$2,151,594+3.0%IDOT
64J65Section (81-1)LSDistrict 023McCarthy Improvement Company$2,065,884$2,544,403+23%IDOT
74A89Section 111District 071Howell Paving, Inc.$1,960,827IDOT
66L75Section (53-6B)BJR,BRRDistrict 031Tobey's Construction & Cartage, Inc.$1,906,501IDOT
66L72Section (R-4)SFY,RS-4District 031Advanced Asphalt Company$1,899,841IDOT
61H57Schaumburg, section 20-00136-00-RSDistrict 015Plote Construction, Inc.$1,865,189$1,968,637+6.0%IDOT
72M22Section (3RS-5,105RS-7,106RS-5)SWDistrict 062Truman L. Flatt & Sons Co., Inc.$1,823,887$1,971,170+8.0%IDOT
62H26Section 2018-068-BDistrict 011D. Construction, Inc.$1,802,727IDOT
62N70Section 2021-028-RSDistrict 013J. A. Johnson Paving Company$1,798,173$2,007,007+12%IDOT
70E03Section (9,10,11)RS-4,(9-1,9)RS-1District 053Beniach Construction Co., Inc.$1,797,603$2,098,963+17%IDOT
62M59Section 2020-167-BRDistrict 016MYS, Incorporated$1,748,339$1,838,753+5.0%IDOT
76P24Section 33-1RS-3District 082Christ Bros. Asphalt, Inc.$1,746,801$1,771,875+1.0%IDOT
87777Ottawa, section 17-00169-00-PVDistrict 034D. Construction, Inc.$1,713,095$1,714,2530.0%IDOT
91610Project Number: Vvx2-892 / /, section 19-00216-00-SPDistrict 052Cross Construction, Inc.$1,700,000$1,897,846+12%IDOT
87770Project Number: Nmku-643 / /, section 14-00246-00-RSDistrict 032Curran Contracting Company$1,698,623$1,866,688+10%IDOT
61G89Project Number: 3P1R-750 / /, section 16-00146-00-SWDistrict 015Acura Inc.$1,696,019$1,758,804+4.0%IDOT
85724Project Number: Cq6J-807 / /, section 20-00253-00-RSDistrict 023Civil Constructors, Inc. d/b/a/ Helm Civil$1,611,487$1,969,674+22%IDOT
62N07Section 2020-238-TDistrict 011Martam Construction Incorporated$1,608,899IDOT
62R47Section 2022-049-SWDistrict 011Elgin Sweeping Services, Inc.$1,593,840IDOT
66K77Section (112&112Z)&(38-5HB-4)RS-3,SWDistrict 031Iroquois Paving Corporation$1,584,326IDOT
72M31Section (84-3-2)BDRDistrict 062Freesen, a div of UCM, Inc.$1,576,577$1,788,819+13%IDOT
91611Project Number: Pp90-359 / /, section 21-00220-05-SDDistrict 051Open Road Paving Company LLC$1,485,453IDOT
46592Section D2District 024Precision Pavement Markings Inc.$1,478,750$1,559,228+5.0%IDOT
64N71Section (3BR)BRR-1District 022White Construction LLC$1,458,043$2,568,493+76%IDOT
70F56Section (28X-1,District 052Cross Construction, Inc.$1,441,144$1,501,473+4.0%IDOT
78925Section (5-4,District 092E. T. Simonds Construction Company$1,364,664$1,537,422+13%IDOT
62G71Section 2018-019-RS-SWDistrict 012MAT Construction Leasing, Inc.$1,320,682$1,434,606+9.0%IDOT
64N37Section (9-15D)RS-2District 022Brandt Construction Co.$1,308,309$1,349,429+3.0%IDOT
62R46Section 2022-045/056-SWDistrict 011Elgin Sweeping Services, Inc.$1,249,890IDOT
87771Project Number: Iqed-180- / /, section 18-00125-00-RSDistrict 032Iroquois Paving Corporation$1,239,137$1,512,393+22%IDOT
62M58Section 2020-176-BRDistrict 014Lorig Construction Company$1,225,496$1,326,706+8.0%IDOT
62P82Section 2021-160-BPDistrict 012Eagle Painting & Maintenance Company, Inc.$1,176,437$1,283,300+9.0%IDOT
89790Project Number: G4X4-555 / /, section 19-00117-03-PVDistrict 042Langman Construction, Inc.$1,160,989$1,300,688+12%IDOT
62M48Section 2020-161-RS&SWDistrict 014Plote Construction, Inc.$1,160,466$1,182,000+2.0%IDOT
78923Section (6-2,District 092E. T. Simonds Construction Company$1,093,312$1,181,858+8.0%IDOT
74A75Section D7District 071Howell Paving, Inc.$1,082,723IDOT
95905Olney, section 18-00083-00-SWDistrict 071Kieffer Bros. Construction Co., Inc.$1,080,805IDOT
64R38Section (37BR-2)BPDistrict 023Three Star Painting, Inc.$1,060,875$1,123,095+6.0%IDOT
62N65Section 2021-027-RSDistrict 012Peter Baker & Son Co.$1,021,974$1,032,600+1.0%IDOT
61H18Warrenville, section 19-00039-00-BTDistrict 013Landmark Contractors, Inc.$1,001,551$1,222,949+22%IDOT
62P35Section 2021-112-SWDistrict 013Triggi Construction, Inc.$998,023$1,062,447+6.0%IDOT
85725Project Number: Bdec-446 / /, section 17-00654-00-BRDistrict 025Civil Constructors, Inc. d/b/a/ Helm Civil$987,871$991,7750.0%IDOT
64J47Section (7B)BRRDistrict 021Civil Constructors, Inc. d/b/a/ Helm Civil$987,610IDOT
61H60Project Number: 5Wl6-766 / /, section 20-06000-02-FPDistrict 015Builders Paving, LLC$985,000$1,032,243+5.0%IDOT
74A21Section (113R-5)&(114RS-4)District 072Howell Paving, Inc.$978,300$1,049,474+7.0%IDOT
62N87Section 2021-056-SWDistrict 013Triggi Construction, Inc.$971,423$1,063,515+9.0%IDOT
93780Project Number: S18P-313 / /, section 18-00081-00-BRDistrict 062County Contractors, Inc.$949,926$1,059,942+12%IDOT
78938Section (13-1)RS-7District 092Samron Midwest Contracting, Inc.$898,898$1,096,465+22%IDOT
72M68Section (68-5)RSDistrict 062DMS Contracting, Inc.$887,712$1,151,360+30%IDOT
62P17Section 2021-080-RSDistrict 013D. Construction, Inc.$878,988$895,406+2.0%IDOT
61H63Zion, section 19-00091-00-RSDistrict 013J. A. Johnson Paving Company$871,468$990,778+14%IDOT
62P30Section 2021-102-RS&SWDistrict 014Builders Paving, LLC$868,000$869,7410.0%IDOT
72M83Section (109-1)Z,RSDistrict 062Truman L. Flatt & Sons Co., Inc.$862,713$969,934+12%IDOT
46590Section D-2District 024P & P Construction Co.$847,811$980,564+16%IDOT
87788Project Number: Hysk-316 / /, section 19-00118-01-RSDistrict 032Curran Contracting Company$843,488$968,959+15%IDOT
72L63Section (68-4)R-RSDistrict 063DMS Contracting, Inc.$827,233$852,555+3.0%IDOT
46587Section D-3District 032Marking Specialists Corporation$789,990$1,000,000+27%IDOT
70F83Section D5District 052Midwest Fence Corporation$788,584$814,463+3.0%IDOT
61H67Brookfield, section 21-00136-00-RSDistrict 015K-Five Construction Corporation$780,544$824,659+6.0%IDOT
62R39Section 2021District 014Western Remac, Inc.$765,120$776,039+1.0%IDOT
78914Section 5RS-4District 093E. T. Simonds Construction Company$753,253$765,432+2.0%IDOT
64R14Section (201-2HB)BDRDistrict 027Martin & Company Excavating$750,819$783,989+4.0%IDOT
74A23Section (7,6)RS-3District 072Howell Paving, Inc.$739,240$787,114+6.0%IDOT
78910Section BRIDGEDistrict 092E. T. Simonds Construction Company$738,610$888,889+20%IDOT
76P86Section (30,66,108,109,110,111)PP-1District 082The Kilian Corporation$738,089$748,076+1.0%IDOT
68G31Section (38-1)RS-1District 043A. C. Pavement Striping Co.$734,321$778,203+6.0%IDOT
85723Moline, section 19-00272-00-RSDistrict 023Langman Construction, Inc.$730,709$743,295+2.0%IDOT
66M41Section (108)RS-6District 033D. Construction, Inc.$725,559$726,4490.0%IDOT
66M27Section (71X)RS,MGDistrict 031Advanced Asphalt Company$699,074IDOT
61H66Barrington, section 13-00091-00-BTDistrict 014Lorig Construction Company$695,851$751,489+8.0%IDOT
68G30Section (109,District 043Beniach Construction Co., Inc.$692,608$723,522+4.0%IDOT
68G33Section (137,138)RS-5District 042DMS Contracting, Inc.$656,824$721,499+10%IDOT
70F34Section MBPMDistrict 051Stark Excavating, Inc.$656,698IDOT
74B12Section D7District 071Bodine Electric of Decatur$654,534IDOT
64M17Section 15CR&SRDistrict 023Martin & Company Excavating$648,371$693,462+7.0%IDOT
78901Section (105,103)RS-7District 092E. T. Simonds Construction Company$646,217$800,999+24%IDOT
70F45Section CLINTON/MONTICELLODistrict 052Illiana Construction Co., Inc., A Div. of Champaign Asphalt Company$626,070$850,916+36%IDOT
72809Section D6District 062Bodine Electric of Decatur$621,576$757,834+22%IDOT
68G74Section D4District 042Oberlander Electric Co.$598,683$602,277+1.0%IDOT
66M46Section 53(3,4,5,6)PPDistrict 032G. M. Sipes Construction, Inc.$590,810$625,838+6.0%IDOT
97779O'Fallon, section 14-00067-00-PVDistrict 083The Kilian Corporation$588,145$590,6570.0%IDOT
68G34Section (17,16)RS-5;15RS-8District 043Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company$553,862$588,994+6.0%IDOT
72M29Section (107Z)BDR-1District 062Freesen, a div of UCM, Inc.$551,176$723,446+31%IDOT
68G88Section (55-2)NDistrict 041Gunther Construction, a div of UCM, Inc.$539,236IDOT
61H64Lincolnwood, section 21-00071-00-RSDistrict 013J. A. Johnson Paving Company$537,537$581,500+8.0%IDOT
66K35Section (114)CRDistrict 031Phoenix Corporation of the Quad Cities$535,704IDOT
62N75Section 2021-015-RS&SWDistrict 015J. A. Johnson Paving Company$532,000$536,692+1.0%IDOT
70F44Section PARISDistrict 052Feutz Contractors, Inc.$518,656$616,517+19%IDOT
62G03Section 2017-060TSDistrict 011Hecker and Company, Inc.$509,914IDOT
68G78Section 102[2HB-1;2HB]BPDistrict 045Three Star Painting, Inc.$500,000$576,520+15%IDOT
72808Section D6District 063Bodine Electric of Decatur$487,198$493,875+1.0%IDOT
61H38Forest Park, section 20-00116-00-RSDistrict 016Lindahl Brothers, Inc.$485,407$518,076+7.0%IDOT
46588Section D-3District 032Marking Specialists Corporation$479,809$650,000+35%IDOT
78841Section 41-2SLP-1District 093Sierra Bravo Contractors, LLC$478,844$712,357+49%IDOT
99672Project Number: Bh9V-830 / /, section 19-00158-00-BRDistrict 092Samron Midwest Contracting, Inc.$444,444$497,949+12%IDOT
97774Alton, section 17-00231-02-SWDistrict 082RCS Construction, Inc.$442,744$443,2490.0%IDOT
62H62Section 2018-120-RSDistrict 016Gallagher Asphalt Corporation$439,851$481,619+9.0%IDOT
74A78Section D7District 073Beniach Construction Co., Inc.$411,367$498,920+21%IDOT
99684Project Number: Cedc-041 / /, section 19-00047-00-RSDistrict 092E. T. Simonds Construction Company$409,442$496,859+21%IDOT
93781Project Number: 5Fm7-562 / /, section 19-11115-00-BRDistrict 063Depew and Owen Builders, Inc.$399,988$427,274+7.0%IDOT
91614Project Number: Ba04-565 / /, section 20-00115-00-BTDistrict 054Duce Construction Company$391,500$394,000+1.0%IDOT
74A76Section D7District 073Beniach Construction Co., Inc.$388,450$399,985+3.0%IDOT
CO069Section COLESDistrict 072American Road Maintenance, Inc. d/b/a Midwest Tar Sealer, Inc.$366,518$499,275+36%IDOT
66M01Section (111)ELEDistrict 034Van-Mack Electric Co.$359,960$368,507+2.0%IDOT
74A83Section D7District 071Beniach Construction Co., Inc.$349,437IDOT
78907Section D9District 092F. W. Electric, Inc.$297,533$326,246+10%IDOT
78857Section 101TS-2District 091Brown Electric, Inc.$294,174IDOT
68G50Section D4District 044All States Painting, Inc.$293,000$298,804+2.0%IDOT
78880Section D9District 091Brown Electric, Inc.$287,973IDOT
70F80Section (120)IDistrict 051Howell Paving, Inc.$281,428IDOT
68G32Section 125RS-6District 043Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company$278,305$318,937+15%IDOT
70F62Section 116District 052Open Road Paving Company LLC$266,798$300,000+12%IDOT
74B11Section D7District 071Beniach Construction Co., Inc.$264,854IDOT
70F65Section (15)RS-3District 051Illinois Valley Paving, a div of UCM, Inc.$252,643IDOT
64R44Section D2District 026Alliance Contractors, Inc.$249,382$252,618+1.0%IDOT
68G73Section 90(6,106)LDistrict 043Bodine Electric of Decatur$248,640$264,504+6.0%IDOT
76P59Section 21CRDistrict 082DMS Contracting, Inc.$242,608$281,083+16%IDOT
46931Section IDNRDistrict 093Lake Contracting, Inc.$239,183$284,398+19%IDOT
66M10Section (L,M)TS,RRDistrict 032Outsen Electric, Incorporated$238,185$239,709+1.0%IDOT
74A81Section D7District 073G. M. Sipes Construction, Inc.$229,634$247,699+8.0%IDOT
72N36Section (54-3B)DRDistrict 062White Construction LLC$223,809$267,772+20%IDOT
62R44Section 2022-055-2LDistrict 016Winston's Image LLC$222,264$231,764+4.0%IDOT
66M29Section (351E)RS,MGDistrict 034Curran Contracting Company$191,273$207,357+8.0%IDOT
72856Section D6District 062Capitol Construction Group, LLC d/b/a Egizii Electric$190,640$295,502+55%IDOT
62R45Section 2022-055-LDistrict 016Winston's Image LLC$186,480$193,136+4.0%IDOT
66M34Section (113)PP-2District 032Terrazas, LLC$183,566$196,716+7.0%IDOT
68G77Section (48-29RA)I-28;District 042Laser Electric, Inc.$179,815$219,602+22%IDOT
78896Section D9District 093G. M. Sipes Construction, Inc.$176,928$197,197+11%IDOT
70E79Section FY2022District 054Interstate Maintenance, Incorporated$161,254$229,500+42%IDOT
64R46Section D2District 021Laser Electric, Inc.$154,339IDOT
46591Section D2District 023O'Brien Civil Works, Inc.$130,853$135,966+4.0%IDOT
76P92Section 201PP-1District 082RCS Construction, Inc.$90,961$118,896+31%IDOT
72N29Section 1-3RS-1District 061Diamond Construction Company$74,843IDOT
72A34Section (1-5HB-1)BRRDistrict 065County Contractors, Inc.$49,610$58,883+19%IDOT
72N34Section (22B)BRRDistrict 061County Contractors, Inc.$48,150IDOT
IDOT contracts let on April 29, 2022, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy