Eagle Painting & Maintenance Company, Inc.: IDOT bid record
Eagle Painting & Maintenance Company, Inc. submitted 113 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 12 JUN 2026, and was the low bidder on 35 of them (31%). When it was not low, its total sat a median +19% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $24,674,683
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 29 | 5 | 17% |
| 2022 | 13 | 4 | 31% |
| 2023 | 16 | 9 | 56% |
| 2024 | 19 | 5 | 26% |
| 2025 | 21 | 7 | 33% |
| 2026 | 15 | 5 | 33% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 29 | 10 | 34% |
| District 06 | 27 | 6 | 22% |
| District 02 | 19 | 3 | 16% |
| District 08 | 12 | 5 | 42% |
| District 07 | 11 | 4 | 36% |
| District 04 | 7 | 4 | 57% |
| District 05 | 4 | 1 | 25% |
| District 09 | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 22 | 22 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 20 | 20 (100%) | $0.80 | $0.80 |
| Temp info signing | Z0030850 | SF | 13 | 10 (77%) | $12.00 | $18.00 |
| Changeable message SN | 70107025 | CAL DAY | 59 | 9 (15%) | $75.00 | $55.00 |
| Traf cont-prot 701411 | 70100420 | EACH | 21 | 9 (43%) | $500.00 | $750.00 |
| Temp conc barrier | 70400100 | LF | 80 | 8 (10%) | $25.00 | $31.73 |
| Imp attn rel NRD TL3 | 70600350 | EACH | 36 | 8 (22%) | $600.00 | $750.00 |
| Temp BR traf signals | 70106500 | EACH | 20 | 7 (35%) | $5,350.00 | $15,400 |
| Rel temp conc barrier | 70400200 | LF | 67 | 6 (9%) | $5.00 | $8.00 |
| SHRT TRM pavt MK rem | 70300150 | SF | 14 | 6 (43%) | $0.45 | $1.20 |
| Imp attn rel FRN TL3 | 70600332 | EACH | 21 | 4 (19%) | $1,100.00 | $2,218.00 |
| Pin temp conc barrier | 70400125 | EACH | 11 | 4 (36%) | $12.00 | $24.53 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| ERA-Valdivia Contractors, Inc. | 105 | 40 of 105 |
| Civil Coatings and Construction Inc. | 83 | 33 of 83 |
| Three Star Painting, Inc. | 70 | 28 of 70 |
| Venus Painting Co. | 69 | 24 of 69 |
| Capital Industrial Services, LLC | 40 | 17 of 40 |
| Thomas Industrial Coatings, Inc. | 27 | 7 of 27 |
| All States Painting, Inc. | 23 | 9 of 23 |
| Central Painting, Inc. | 3 | 1 of 3 |
| KMX Painting, Inc. | 2 | 0 of 2 |
| Royal Bridge, Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 76U86 | District 08 | Section 103P | 1 of 4 | $314,406 | Low, 25% under the second |
| 12 JUN 2026 | 76V03 | District 08 | Section DIST | 3 of 4 | $6,828,372 | +133% |
| 12 JUN 2026 | 78C15 | District 09 | Section D9 | 1 of 4 | $409,970 | Low, 38% under the second |
| 12 JUN 2026 | 80B51 | District 01 | Section (29R-SF) | 2 of 2 | $589,677 | +20% |
| 24 APR 2026 | 64U99 | District 02 | Section (195-1HB-1 | 3 of 6 | $820,200 | +12% |
| 24 APR 2026 | 74D61 | District 07 | Section D7 | 2 of 4 | $2,760,432 | +30% |
| 24 APR 2026 | 74D63 | District 07 | Section D7 | 1 of 5 | $669,591 | Low, 8.0% under the second |
| 24 APR 2026 | 80B54 | District 01 | Section (533-VB) | 2 of 3 | $937,263 | +2.0% |
| 27 FEB 2026 | 64U96 | District 02 | Section D2 | 1 of 5 | $364,310 | Low, 11% under the second |
| 27 FEB 2026 | 64U97 | District 02 | Section D2 | 3 of 5 | $606,750 | +4.0% |
| 27 FEB 2026 | 80B56 | District 01 | Section (1300B-89)BP | 1 of 3 | $401,758 | Low, 6.0% under the second |
| 16 JAN 2026 | 72653 | District 06 | Section (54-4HVB,5HVB)BP | 3 of 5 | $1,897,750 | +30% |
| 16 JAN 2026 | 72729 | District 06 | Section (84-9-3)BP | 5 of 5 | $592,852 | +45% |
| 16 JAN 2026 | 72A25 | District 06 | Section (75-1HB,75-5HB-1,86-9HB)BP | 6 of 6 | $761,650 | +36% |
| 16 JAN 2026 | 72K80 | District 06 | Section (84-9-2HB-4,84-10-3HB-2)BP | 2 of 6 | $396,900 | +4.0% |
| 07 NOV 2025 | 78B82 | District 09 | 1 of 4 | $2,044,033 | Low, 6.0% under the second | |
| 07 NOV 2025 | 80B53 | District 01 | 1 of 3 | $1,180,528 | Low, 30% under the second | |
| 13 JUN 2025 | 62Y02 | District 01 | Section (10-B)BP | 2 of 3 | $563,416 | +13% |
| 13 JUN 2025 | 62Y07 | District 01 | Section (0202-604-HB)BP | 3 of 3 | $778,300 | +21% |
| 25 APR 2025 | 62X20 | District 01 | Section (1717.6-1P)BP | 3 of 3 | $957,856 | +47% |
| 25 APR 2025 | 62X22 | District 01 | Section (104-B)BP | 2 of 3 | $568,821 | +13% |
| 25 APR 2025 | 64T87 | District 02 | Section (107(B-1&VB-1))BP | 2 of 5 | $344,300 | +40% |
| 25 APR 2025 | 64T89 | District 02 | Section (195-1VB)BP | 3 of 5 | $397,900 | +17% |
| 25 APR 2025 | 64T92 | District 02 | Section (177-4B-2)BDS&BP | 3 of 5 | $272,275 | +40% |
| 25 APR 2025 | 64U34 | District 02 | Section (106BR)BDS&BP | 2 of 5 | $97,729 | +3.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.