IDOT letting results, April 25, 2025
191 contracts let by Illinois DOT on April 25, 2025, $781,587,965 in low bids, a median of 2 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 191
- Low bids, total
- $781,587,965
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 62W87 | Section (42-B-11-1)BR,BJR | District 01 | 2 | Lorig Construction Company | $81,370,819 | $87,950,178 | +8.0% | IDOT |
| 62X94 | Section 2024-1052-N,C,SW,FL | District 01 | 4 | Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. | $78,336,172 | $81,630,848 | +4.0% | IDOT |
| 78373 | Section (1-4)R-5,RS-2,B-1,B-2,B-3,B-4 | District 09 | 2 | Samron Midwest Contracting, Inc. | $40,895,392 | $42,612,327 | +4.0% | IDOT |
| 78973 | Section (02-1B-1)BP-1 | District 09 | 4 | Capital Industrial Services, LLC | $33,351,843 | $34,480,929 | +3.0% | IDOT |
| 61G79 | Naperville, section 06-00133-00-BR | District 01 | 4 | OHLA Central, Inc. | $33,197,030 | $35,257,000 | +6.0% | IDOT |
| 76U26 | Section (103,104)RS-2,119RS-1 | District 08 | 2 | Charles E. Mahoney Co. | $25,874,598 | $26,578,558 | +3.0% | IDOT |
| 62N33 | Section 2020-263-SUR,SW&TS | District 01 | 1 | John Burns Construction Company | $25,464,000 | IDOT | ||
| 64N98 | Section 141-1HBR-3&(9,10)R-3 | District 02 | 3 | William Charles Construction Company, LLC | $23,945,140 | $24,176,049 | +1.0% | IDOT |
| 66R35 | Section (46-1,2)RS-4 | District 03 | 1 | Kankakee Valley Construction Co., Inc. & Gallagher Asphalt Corporation | $19,511,604 | IDOT | ||
| 62J79 | Section 2019-107-RS&SW | District 01 | 4 | Plote Construction, Inc. | $17,639,508 | $18,131,680 | +3.0% | IDOT |
| 70991 | Section 25RS-6 | District 05 | 2 | Cross Construction, Inc. | $14,499,778 | $15,261,584 | +5.0% | IDOT |
| 76J62 | Section (31,410,410-1)RS-4,(82-7K)RS-1 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $14,154,479 | $14,380,024 | +2.0% | IDOT |
| 78A80 | Section 77(1,1-1,1-2,1-3,2,2-1,3)RS-3;BRREP | District 09 | 2 | E. T. Simonds Construction Company | $12,722,436 | $14,272,978 | +12% | IDOT |
| 68J21 | Section 35RS-5;36RS-4;139RS-7 | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $12,640,388 | IDOT | ||
| 85774 | East Moline, section 22-00159-00-PV, | District 02 | 4 | Valley Construction Co. | $12,185,222 | $12,899,832 | +6.0% | IDOT |
| 62R62 | Section FAI | District 01 | 3 | Areatha Construction Co., Inc. | $12,098,192 | $12,213,381 | +1.0% | IDOT |
| 68A65 | Section 118RS-8,W-2 | District 04 | 1 | R. A. Cullinan and Son, a div of UCM, Inc. | $11,849,961 | IDOT | ||
| 74759 | Section 50ZRS-4 | District 07 | 1 | Howell Paving, Inc. | $10,508,360 | IDOT | ||
| 68J18 | Section 45RS-8;(46-1)RS-10 | District 04 | 2 | Advanced Asphalt Company | $9,772,668 | $9,969,644 | +2.0% | IDOT |
| 68F43 | Section 4RS-5 | District 02 | 1 | Gunther Construction, a div of UCM, Inc. | $9,337,044 | IDOT | ||
| 76U31 | Section 52RS-3 | District 08 | 2 | The Kilian Corporation | $9,334,223 | $9,464,076 | +1.0% | IDOT |
| 74A26 | Section 12RS-5,(121,122,123Z)RS-4 | District 07 | 1 | Howell Paving, Inc. | $8,847,480 | IDOT | ||
| 76N05 | Section (47,113)RS-4 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $7,874,830 | $8,240,607 | +5.0% | IDOT |
| 68H42 | Section 101RS-5;(102X)RS-2;(102-B)BRR | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $6,563,945 | IDOT | ||
| 68G11 | Section 113RS-4;115RS-5 | District 04 | 1 | Gunther Construction, a div of UCM, Inc. | $6,192,933 | IDOT | ||
| 61L06 | Park Forest, section 20-00106-00-PV | District 01 | 4 | D. Construction, Inc. | $6,160,173 | $6,329,309 | +3.0% | IDOT |
| 62V56 | Section FAP | District 01 | 1 | K-Five Construction Corporation | $5,412,662 | IDOT | ||
| 62V36 | Section FAP | District 01 | 3 | Iroquois Paving Corporation | $5,393,745 | $5,897,529 | +9.0% | IDOT |
| 66R36 | Section ((06&50-8),50-2)RS | District 03 | 1 | Advanced Asphalt Company | $5,338,646 | IDOT | ||
| 62V61 | Section FAU | District 01 | 3 | K-Five Construction Corporation | $5,275,535 | $5,685,304 | +8.0% | IDOT |
| 78A89 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $5,244,108 | $7,144,653 | +36% | IDOT |
| 72220 | Section (54-4HB)D | District 06 | 3 | Sangamo Construction Company | $4,994,242 | $5,453,298 | +9.0% | IDOT |
| 74C44 | Section (5,6)RS-3 | District 07 | 1 | Howell Paving, Inc. | $4,744,251 | IDOT | ||
| 85778 | Rochelle, section 23-00118-00-RP | District 02 | 2 | McCarthy Improvement Company | $4,668,879 | $4,785,544 | +2.0% | IDOT |
| 64U31 | Section (3,4)RS | District 02 | 2 | Martin & Company Excavating | $4,435,198 | $4,548,432 | +3.0% | IDOT |
| 62W69 | Section 2024-950-RS | District 01 | 2 | Geneva Construction Company | $4,184,234 | $4,458,458 | +7.0% | IDOT |
| 64U23 | Section 106 | District 02 | 2 | Rock Road Companies, Inc. | $4,096,256 | $4,451,475 | +9.0% | IDOT |
| 61K26 | Project Number: Zu0Q-834 / /, section 17-12082-01-BR | District 01 | 3 | Rausch Infrastructure, LLC | $3,894,087 | $4,163,339 | +7.0% | IDOT |
| 62V37 | Section FAP | District 01 | 3 | Plote Construction, Inc. | $3,811,382 | $4,049,483 | +6.0% | IDOT |
| 76U30 | Section 82-1-B-1BJR-2 | District 08 | 2 | Keeley & Sons, Inc. | $3,755,513 | $3,841,935 | +2.0% | IDOT |
| 61K44 | Project Number: L7Md-600 / /, section 20-F3000-06-BT | District 01 | 2 | D. Construction, Inc. | $3,654,428 | $4,913,365 | +34% | IDOT |
| 46945 | Section WALNUT | District 05 | 1 | Feutz Contractors, Inc. | $3,572,604 | IDOT | ||
| 61L18 | Marengo, section 21-00029-00-PV | District 01 | 7 | PirTano Construction Co., LLC | $3,549,900 | $3,674,293 | +4.0% | IDOT |
| 66A85 | Section (109,110)RS-3 | District 03 | 3 | Kankakee Valley Construction Company, Inc. | $3,511,811 | $4,026,778 | +15% | IDOT |
| 46659 | Section D2 | District 02 | 3 | RoadSafe Traffic Systems, Inc. | $3,447,500 | $4,268,750 | +24% | IDOT |
| 66R31 | Section (7X-3,7R-2,6R-2)RS-1 | District 03 | 4 | D. Construction, Inc. | $3,397,233 | $3,794,793 | +12% | IDOT |
| 68G27 | Section (103-I-8)BR | District 04 | 2 | William Charles Construction Company, LLC | $3,383,301 | $6,562,700 | +94% | IDOT |
| 62X32 | Section 2024-998-SW,RS | District 01 | 1 | Peter Baker & Son Co. | $2,996,992 | IDOT | ||
| 78B15 | Section (7A,111A,111X,112A)RS-5 | District 09 | 2 | Samron Midwest Contracting, Inc. | $2,988,051 | $3,030,048 | +1.0% | IDOT |
| 78147 | Section 111(B-1) | District 09 | 2 | E. T. Simonds Construction Company | $2,908,063 | $3,145,069 | +8.0% | IDOT |
| 89780 | Monmouth, section 17-00081-01-RP | District 04 | 3 | Brandt Construction Co. | $2,855,658 | $3,542,871 | +24% | IDOT |
| 64N76 | Section (2,3)R | District 02 | 4 | Phoenix Corporation of the Quad Cities | $2,705,618 | $2,943,583 | +9.0% | IDOT |
| 66M99 | Section (26,26A)RS,SW | District 03 | 2 | Iroquois Paving Corporation | $2,667,505 | $3,296,808 | +24% | IDOT |
| 61L33 | Glenview, section 24-00214-00-RS | District 01 | 3 | Peter Baker & Son Co. | $2,603,039 | $2,898,941 | +11% | IDOT |
| 62V89 | Section FAP | District 01 | 4 | Plote Construction, Inc. | $2,516,963 | $2,681,503 | +7.0% | IDOT |
| 95940 | Shelbyville, section 21-00060-01-BT | District 07 | 1 | Kinney Contractors, Inc. | $2,495,777 | IDOT | ||
| 89802 | Morton, section 20-00130-00-RS | District 04 | 2 | R. A. Cullinan and Son, a div of UCM, Inc. | $2,452,499 | $2,500,000 | +2.0% | IDOT |
| 95972 | Project Number: Gjje-976 / /, section 20-00099-00-RS | District 07 | 1 | Howell Paving, Inc. | $2,411,360 | IDOT | ||
| 78B08 | Section 110RS-5 | District 09 | 2 | E. T. Simonds Construction Company | $2,371,499 | $2,595,923 | +9.0% | IDOT |
| 78A99 | Section 9RS-4 | District 09 | 2 | E. T. Simonds Construction Company | $2,299,898 | $2,405,008 | +5.0% | IDOT |
| 62V86 | Section FAP | District 01 | 3 | K-Five Construction Corporation | $2,285,003 | $2,440,970 | +7.0% | IDOT |
| 97861 | Project Number: E0I9-669 / /, section 21-00109-00-RS | District 08 | 2 | Christ Bros. Asphalt, Inc. | $2,147,938 | $2,280,069 | +6.0% | IDOT |
| 62T20 | Section FAP | District 01 | 4 | Iroquois Paving Corporation | $2,071,695 | $2,204,121 | +6.0% | IDOT |
| 97852 | Jerseyville, section 22-00040-01-PV | District 08 | 3 | Baxmeyer Construction, Inc. | $2,063,878 | $2,081,088 | +1.0% | IDOT |
| 95976 | Project Number: 3Gpk-596 / /, section 23-00296-00-RS | District 07 | 2 | Howell Paving, Inc. | $2,057,823 | $2,396,171 | +16% | IDOT |
| 62V75 | Section FAP | District 01 | 3 | Peter Baker & Son Co. | $1,949,721 | $2,277,984 | +17% | IDOT |
| 66M48 | Section 122V-BR1 | District 03 | 3 | D. Construction, Inc. | $1,939,442 | $2,725,904 | +41% | IDOT |
| 66R33 | Section (7R)RS-2 | District 03 | 2 | Gallagher Asphalt Corporation | $1,938,778 | $2,100,194 | +8.0% | IDOT |
| 76T79 | Section D8 | District 08 | 1 | Electrico, Inc. | $1,923,315 | IDOT | ||
| 97862 | Godfrey, section 19-00001-05-PV | District 08 | 2 | Keller Construction, Inc. | $1,917,545 | $2,134,685 | +11% | IDOT |
| 62X93 | Section (1981-082-I)BR | District 01 | 2 | D. Construction, Inc. | $1,901,944 | $2,719,999 | +43% | IDOT |
| 46940 | Section GLP | District 03 | 3 | D. Construction, Inc. | $1,889,874 | $1,987,187 | +5.0% | IDOT |
| 72040 | Section (SPZ,27)RS-7 | District 06 | 3 | Truman L. Flatt & Sons Co., Inc. | $1,821,344 | $2,213,133 | +22% | IDOT |
| 74B64 | Section D7 | District 07 | 1 | Howell Paving, Inc. | $1,731,256 | IDOT | ||
| 91650 | Project Number: Xsek-251 / /, section 23-00226-00-SP | District 05 | 2 | Cross Construction, Inc. | $1,720,330 | $1,827,200 | +6.0% | IDOT |
| 76U16 | Section 401-2B(BJR,BDS,BDR)-1 | District 08 | 1 | Keeley & Sons, Inc. | $1,685,988 | IDOT | ||
| 46660 | Section D2 | District 02 | 1 | P & P Construction Co. | $1,683,900 | IDOT | ||
| 62V54 | Section FAP | District 01 | 3 | Builders Paving, LLC | $1,679,248 | $1,701,876 | +1.0% | IDOT |
| 78B14 | Section 116RS-3 | District 09 | 2 | E. T. Simonds Construction Company | $1,642,992 | $1,723,837 | +5.0% | IDOT |
| 61K95 | Addison, section 24-00113-00-RS | District 01 | 5 | R. W. Dunteman Company | $1,638,372 | $1,822,150 | +11% | IDOT |
| 87862 | Project Number: 6F7S-297 / /, section 21-00229-00-RS | District 03 | 2 | H. J. Eppel & Co. | $1,638,174 | $1,671,174 | +2.0% | IDOT |
| 70G71 | Section (121)BR-1,(114)BR-1 | District 05 | 3 | Sangamo Construction Company | $1,634,866 | $1,769,875 | +8.0% | IDOT |
| 76U27 | Section 125RS-6 | District 08 | 2 | Charles E. Mahoney Co. | $1,613,743 | $1,742,013 | +8.0% | IDOT |
| 62R02 | Section 2021-181-SW | District 01 | 4 | Triggi Construction, Inc. | $1,609,615 | $1,662,027 | +3.0% | IDOT |
| 78833 | Section 105B-3 | District 09 | 2 | E. T. Simonds Construction Company | $1,609,107 | $1,640,810 | +2.0% | IDOT |
| 99727 | Carbondale, section 23-00160-00-RS | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,596,208 | $1,614,247 | +1.0% | IDOT |
| 93830 | Quincy, section 21-00340-00-RS | District 06 | 1 | Diamond Construction Company | $1,576,416 | IDOT | ||
| 61L29 | Bloomingdale, section 20-00073-00-RS | District 01 | 10 | Builders Paving, LLC | $1,534,281 | $1,584,176 | +3.0% | IDOT |
| 78894 | Section 51RS-2 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,493,057 | $1,506,416 | +1.0% | IDOT |
| 78B07 | Section (134,135)RS-3 | District 09 | 2 | E. T. Simonds Construction Company | $1,463,916 | $1,689,168 | +15% | IDOT |
| 64U32 | Section (6,7)PP-RS | District 02 | 2 | Advanced Asphalt Company | $1,442,827 | $1,850,793 | +28% | IDOT |
| 85777 | Project Number: 28Xt-733 / /, section 22-00260-00-RS | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $1,439,241 | $1,742,703 | +21% | IDOT |
| 62J72 | Section 2019-114RS&SW | District 01 | 2 | Geneva Construction Company | $1,373,951 | $1,570,008 | +14% | IDOT |
| 62T27 | Section FAP | District 01 | 5 | D. Construction, Inc. | $1,260,740 | $1,394,444 | +11% | IDOT |
| 66P73 | Section D3 | District 03 | 2 | John Burns Construction Company | $1,251,719 | $1,499,713 | +20% | IDOT |
| 78B09 | Section (29,29X,30,100,101-2)RS-2 | District 09 | 2 | E. T. Simonds Construction Company | $1,208,977 | $1,809,046 | +50% | IDOT |
| 62X40 | Section (068-2323.3-CF)BR,I | District 01 | 4 | ERA-Valdivia Contractors, Inc. | $1,194,462 | $1,327,163 | +11% | IDOT |
| 76U18 | Section (82-11HB)BJR,BDR | District 08 | 1 | The Kilian Corporation | $1,173,906 | IDOT | ||
| 78B17 | Section D9 | District 09 | 4 | Kinney Contractors, Inc. | $1,168,552 | $1,202,965 | +3.0% | IDOT |
| 62V87 | Section FAP | District 01 | 3 | D. Construction, Inc. | $1,137,768 | $1,172,737 | +3.0% | IDOT |
| 62W59 | Section 2023-938-N,TS | District 01 | 3 | H & H Electric Co. | $1,101,716 | $1,125,147 | +2.0% | IDOT |
| 66P37 | Section (11-X-1-BR-1,11-X-1-BR)BRR | District 03 | 1 | Tobey's Construction & Cartage, Inc. | $1,048,761 | IDOT | ||
| 70H39 | Section (57-3 | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $1,012,723 | IDOT | ||
| 62V73 | Section FAP | District 01 | 3 | Plote Construction, Inc. | $991,171 | $1,035,999 | +5.0% | IDOT |
| 66R19 | Section (102,FRONTAGE | District 03 | 1 | Advanced Asphalt Company | $987,951 | IDOT | ||
| 78B12 | Section 1RS-2 | District 09 | 2 | E. T. Simonds Construction Company | $974,757 | $994,791 | +2.0% | IDOT |
| 78B11 | Section (13,13Z)RS-5 | District 09 | 2 | E. T. Simonds Construction Company | $963,345 | $988,006 | +3.0% | IDOT |
| 85773 | Project Number: 7Zx7-897 / /, section 22-00351-00-BR | District 02 | 3 | Martin & Company Excavating | $950,396 | $1,260,971 | +33% | IDOT |
| 85776 | Project Number: Yhm4-780 / /, section 22-00192-00-GR | District 02 | 3 | Northern Contracting, Inc. | $947,223 | $981,221 | +4.0% | IDOT |
| 61L22 | Bartlett, section 16-00089-00-RS | District 01 | 5 | Everlast Blacktop Inc. | $935,775 | $946,187 | +1.0% | IDOT |
| 74C46 | Section (101,101Z)RS-1 | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $925,196 | IDOT | ||
| 64T76 | Section D2 | District 02 | 1 | Northern Contracting, Inc. | $922,284 | IDOT | ||
| 89868 | Aledo, section 23-00049-00-BT | District 04 | 8 | Phoenix Corporation of the Quad Cities | $918,761 | $990,955 | +8.0% | IDOT |
| 61L32 | Zion, section 22-00094-00-RS | District 01 | 2 | Peter Baker & Son Co. | $892,838 | $994,994 | +11% | IDOT |
| 61K79 | Carol Stream, section 17-00064-00-BT | District 01 | 7 | Everlast Blacktop Inc. | $871,518 | $969,980 | +11% | IDOT |
| 66R26 | Section CONTRAST | District 03 | 4 | Precision Pavement Markings Inc. | $847,344 | $898,514 | +6.0% | IDOT |
| 70H42 | Section D5 | District 05 | 3 | Kinney Contractors, Inc. | $829,326 | $843,439 | +2.0% | IDOT |
| 89852 | City Of Washington, section 22-00130-00-SW | District 04 | 4 | Stark Excavating, Inc. | $791,727 | $817,880 | +3.0% | IDOT |
| 97857 | Project Number: Hll1-832 / /, section 20-00097-00-RS | District 08 | 3 | E. T. Simonds Construction Company | $773,798 | $839,915 | +9.0% | IDOT |
| 74C50 | Section D7 | District 07 | 3 | Beniach Construction Co., Inc. | $754,086 | $781,798 | +4.0% | IDOT |
| 61K61 | Bolingbrook, section 10-00055-00-BR | District 01 | 6 | D. Construction, Inc. | $753,049 | $797,761 | +6.0% | IDOT |
| 62V41 | Section FAP | District 01 | 2 | Plote Construction, Inc. | $751,115 | $768,775 | +2.0% | IDOT |
| 62V35 | Section FAP | District 01 | 5 | Builders Paving, LLC | $731,556 | $799,007 | +9.0% | IDOT |
| 66R11 | Section 50(1-8)G,SR | District 03 | 3 | Phoenix Corporation of the Quad Cities | $704,100 | $1,165,248 | +65% | IDOT |
| 46666 | Section D2 | District 02 | 1 | RoadSafe Traffic Systems, Inc. | $696,970 | IDOT | ||
| 62V38 | Section FAP | District 01 | 2 | Peter Baker & Son Co. | $682,917 | $809,000 | +18% | IDOT |
| 46657 | Section D7 | District 07 | 2 | Collins & Hermann, Inc. | $656,964 | $896,978 | +37% | IDOT |
| 62X92 | Section 2024-1051-I | District 01 | 3 | Fence Masters, Inc. | $652,316 | $759,304 | +16% | IDOT |
| 62X20 | Section (1717.6-1P)BP | District 01 | 3 | ERA-Valdivia Contractors, Inc. | $649,580 | $693,833 | +7.0% | IDOT |
| 70H36 | Section 113N | District 05 | 1 | Champaign Signal and Lighting Co. a division of Evergreen Roadworks, LLC | $647,450 | IDOT | ||
| 97839 | Edwardsville, section 21-00115-00-RS | District 08 | 2 | Charles E. Mahoney Co. | $615,086 | $624,695 | +2.0% | IDOT |
| 61L31 | Waukegan, section 22-00247-00-RS | District 01 | 2 | Peter Baker & Son Co. | $605,278 | $724,821 | +20% | IDOT |
| 66P89 | Section (116)DR,T | District 03 | 2 | Gillan Construction LLC | $601,985 | $710,815 | +18% | IDOT |
| 78A56 | Section 31CLV-1 | District 09 | 2 | Samron Midwest Contracting, Inc. | $584,789 | $695,102 | +19% | IDOT |
| 46663 | Section D3 | District 03 | 2 | Marking Specialists Corporation | $583,460 | $593,820 | +2.0% | IDOT |
| 66R12 | Section 50(4-6)PP,32(1,2)PP | District 03 | 2 | D. Construction, Inc. | $579,432 | $614,272 | +6.0% | IDOT |
| 62X48 | Section 2024-1007-RS | District 01 | 3 | Diamond Coring Company, Inc. | $566,692 | $740,541 | +31% | IDOT |
| 95978 | Forsyth, section 18-00010-00-BT | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $536,307 | IDOT | ||
| 74D28 | Section D7 | District 07 | 5 | Feutz Contractors, Inc. | $528,441 | $572,873 | +8.0% | IDOT |
| 78B10 | Section (6,6-1)RS-3 | District 09 | 2 | Samron Midwest Contracting, Inc. | $526,107 | $545,225 | +4.0% | IDOT |
| 78B25 | Section (5,6,7)PP-1 | District 09 | 4 | E. T. Simonds Construction Company | $521,745 | $583,938 | +12% | IDOT |
| 70H50 | Section MBPM | District 05 | 3 | Freesen, a div of UCM, Inc. | $517,733 | $519,851 | 0.0% | IDOT |
| 74D44 | Section D7 | District 07 | 1 | Bodine Electric of Decatur | $508,030 | IDOT | ||
| 62X22 | Section (104-B)BP | District 01 | 3 | Capital Industrial Services, LLC | $503,300 | $568,821 | +13% | IDOT |
| 74D27 | Section D7 | District 07 | 2 | G. M. Sipes Construction, Inc. | $498,479 | $503,473 | +1.0% | IDOT |
| 62W50 | Section 2023-928-RS,SW | District 01 | 3 | Schroeder Asphalt Services, Inc. | $458,691 | $519,894 | +13% | IDOT |
| 66R14 | Section (109)RS-6 | District 03 | 2 | D. Construction, Inc. | $457,951 | $518,095 | +13% | IDOT |
| 97858 | Greenville, section 24-00046-01-SW | District 08 | 1 | Keller Construction, Inc. | $449,364 | IDOT | ||
| 70H54 | Section (10-33,33)PP | District 05 | 4 | Beniach Construction Co., Inc. | $445,307 | $488,600 | +10% | IDOT |
| 62X27 | Section (60B&C-NRM)BR | District 01 | 3 | Lorig Construction Company | $433,056 | $444,481 | +3.0% | IDOT |
| 46662 | Section D3 | District 03 | 1 | Marking Specialists Corporation | $412,448 | IDOT | ||
| 62X85 | Section 2024-1044-RS | District 01 | 4 | P. T. Ferro Construction Co. | $410,872 | $423,005 | +3.0% | IDOT |
| 68H82 | Section 90[14PP;(15-1)PP-1] | District 04 | 2 | G. M. Sipes Construction, Inc. | $409,507 | $425,000 | +4.0% | IDOT |
| 70H47 | Section D5 | District 05 | 4 | Three Star Painting, Inc. | $402,640 | $423,975 | +5.0% | IDOT |
| 61L41 | Evanston, section 23-00297-00-SW | District 01 | 5 | Triggi Construction, Inc. | $396,952 | $454,097 | +14% | IDOT |
| 64T78 | Section D2 | District 02 | 1 | Rock Road Companies, Inc. | $395,040 | IDOT | ||
| 95969 | Marshall, section 22-00061-00-SW | District 07 | 3 | Feutz Contractors, Inc. | $394,399 | $470,129 | +19% | IDOT |
| 93829 | Project Number: R32N-845 / /, section 22-16119-00-BR | District 06 | 3 | County Contractors, Inc. | $391,972 | $497,203 | +27% | IDOT |
| 74C48 | Section D7 | District 07 | 4 | Complete Asphalt Service Co. | $384,459 | $397,899 | +3.0% | IDOT |
| 68J27 | Section D4 | District 04 | 2 | Oberlander Electric Co. | $382,690 | $410,757 | +7.0% | IDOT |
| 68J36 | Section D4 | District 04 | 4 | Varsity Striping & Construction Co. | $376,474 | $475,739 | +26% | IDOT |
| 95975 | Charleston, section 24-00126-00-RS | District 07 | 1 | Ne-Co Asphalt Co., Inc. | $356,482 | IDOT | ||
| 70H43 | Section (86BR)BR-1,(Z-1)BR-2 | District 05 | 3 | Stark Excavating, Inc. | $349,587 | $350,270 | 0.0% | IDOT |
| 70H56 | Section (74-3)I | District 05 | 3 | Beniach Construction Co., Inc. | $345,053 | $387,567 | +12% | IDOT |
| 64T89 | Section (195-1VB)BP | District 02 | 5 | Three Star Painting, Inc. | $339,776 | $397,000 | +17% | IDOT |
| 66R00 | Section LITTER | District 03 | 3 | The Final Connection, Inc. | $327,337 | $420,267 | +28% | IDOT |
| 64T79 | Section (12R)PP | District 02 | 2 | O'Brien Civil Works, Inc. | $310,362 | $453,034 | +46% | IDOT |
| 66R17 | Section (36)PP | District 03 | 3 | SNC Construction, Inc. | $306,453 | $407,923 | +33% | IDOT |
| 62V53 | Section FAP | District 01 | 3 | Schroeder Asphalt Services, Inc. | $293,954 | $320,938 | +9.0% | IDOT |
| 74D30 | Section D7 | District 07 | 5 | Thor General Contracting LLC | $290,712 | $333,124 | +15% | IDOT |
| 76T07 | Section 60-1HB1-BP | District 08 | 4 | ERA-Valdivia Contractors, Inc. | $278,460 | $300,000 | +8.0% | IDOT |
| 91654 | Westville, section 24-00027-00-SW | District 05 | 3 | SNC Construction, Inc. | $273,470 | $283,101 | +4.0% | IDOT |
| 66R28 | Section (112X)CLV-1 | District 03 | 4 | H. J. Eppel & Co. | $257,331 | $257,701 | 0.0% | IDOT |
| 87880 | Ladd, section 24-00024-00-SW | District 03 | 3 | Gillan Construction LLC | $255,362 | $299,648 | +17% | IDOT |
| 87881 | Mendota, section 24-00064-00-SW | District 03 | 6 | D. Construction, Inc. | $247,455 | $261,686 | +6.0% | IDOT |
| 95977 | Mt. Zion, section 18-00032-00-BT | District 07 | 2 | Kinney Contractors, Inc. | $247,095 | $371,444 | +50% | IDOT |
| 64T87 | Section (107(B-1&VB-1))BP | District 02 | 5 | Three Star Painting, Inc. | $245,276 | $344,300 | +40% | IDOT |
| 62X25 | Section (7HB-K(86)BR | District 01 | 4 | Martam Construction Incorporated | $241,055 | $356,580 | +48% | IDOT |
| 66R15 | Section (3R,16R,20)G,SR | District 03 | 5 | Phoenix Corporation of the Quad Cities | $199,908 | $231,931 | +16% | IDOT |
| 62X39 | Section (125X-HB(1&2)R-1) | District 01 | 2 | Schroeder Asphalt Services, Inc. | $198,854 | $248,123 | +25% | IDOT |
| 64T92 | Section (177-4B-2)BDS&BP | District 02 | 5 | Three Star Painting, Inc. | $195,000 | $252,156 | +29% | IDOT |
| 66P48 | Section D3 | District 03 | 4 | Denler, Inc. | $193,871 | $241,657 | +25% | IDOT |
| 66P99 | Section D3 | District 03 | 1 | Outsen Electric, Incorporated | $193,820 | IDOT | ||
| 68K08 | Section D4 | District 04 | 1 | Laser Electric, Inc. | $189,900 | IDOT | ||
| 66R13 | Section (108,109)PP | District 03 | 3 | D. Construction, Inc. | $186,398 | $194,392 | +4.0% | IDOT |
| 66N61 | Section (102)SFY | District 03 | 1 | D. Construction, Inc. | $165,198 | IDOT | ||
| 76L49 | Section 110Q | District 08 | 1 | DMS Contracting, Inc. | $104,126 | IDOT | ||
| 64U34 | Section (106BR)BDS&BP | District 02 | 5 | Three Star Painting, Inc. | $95,000 | $97,729 | +3.0% | IDOT |
| 64T85 | Section (111&123)STY | District 02 | 3 | Countryman, Inc. | $90,474 | $99,159 | +10% | IDOT |
| 66P47 | Section D3 | District 03 | 4 | Denler, Inc. | $62,830 | $66,720 | +6.0% | IDOT |
| 66R16 | Section (3R)CJS | District 03 | 5 | SKC Construction, Inc. | $23,407 | $24,148 | +3.0% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.