IDOT contract 72040 bid tabulation
Section (SPZ,27)RS-7. Let by Illinois DOT on April 25, 2025, Sangamon, District 06. 3 bids received; low bid $1,821,344 by Truman L. Flatt & Sons Co., Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 57
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Truman L. Flatt & Sons Co., Inc. | $1,821,344 | Low |
| 2 | Illinois Valley Paving, a div of UCM, Inc. | $2,213,133 | +22% |
| 3 | P. H. Broughton & Sons, Inc. | $2,221,799 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Truman L. Flatt & Sons Co., Inc. | 2. Illinois Valley Paving, a div of UCM, Inc. | 3. P. H. Broughton & Sons, Inc. |
|---|---|---|---|---|---|---|
| 1 | PC conc sidewalk 4 SP (X4240420) | SF | 1,616 | $27.29 | $29.68 | $31.12 |
| 2 | Handhole to BE adjust (X8140115) | EACH | 6 | $3,174.75 | $3,268.13 | $3,340.11 |
| 3 | Construction layout (Z0013798) | LS | 1 | $10,710 | $22,745 | $13,414 |
| 4 | RR prot liability ins (Z0048665) | LS | 1 | $7,344.00 | $8,585.46 | $9,886.58 |
| 5 | Trainees TPG (Z0076604) | HR | 1,500 | $15.00 | $15.00 | $15.00 |
| 6 | Bit matls tack CT (40600290) | LB | 24,876 | $0.68 | $0.93 | $1.00 |
| 7 | LNG JNT SLNT half WD (40600372) | LF | 76,546 | $2.30 | $2.38 | $2.99 |
| 8 | Matl transfer device (40600405) | TON | 4,644 | $5.99 | $7.47 | $5.95 |
| 9 | Temporary ramp (40600990) | SY | 69 | $0.01 | $13.69 | $0.01 |
| 10 | P HMA SC IL-9.5 D N50 (40604160) | TON | 4,644 | $144.18 | $174.82 | $159.97 |
| 11 | Detectable warnings (42400800) | SF | 260 | $47.94 | $44.07 | $53.12 |
| 12 | HMA surf rem 1 1/2 (44000155) | SY | 55,280 | $3.64 | $5.61 | $5.90 |
| 13 | Comb curb gutter rem (44000500) | LF | 316 | $16.83 | $18.44 | $59.02 |
| 14 | Sidewalk rem (44000600) | SF | 1,936 | $4.59 | $13.78 | $8.59 |
| 15 | CL C patch T1 13 (44201385) | SY | 23 | $326.40 | $336.00 | $407.79 |
| 16 | CL C patch T2 13 (44201389) | SY | 132 | $280.50 | $288.75 | $354.13 |
| 17 | CL C patch T3 13 (44201394) | SY | 187 | $278.46 | $286.65 | $348.77 |
| 18 | CL C patch T4 13 (44201396) | SY | 439 | $276.42 | $284.55 | $343.40 |
| 19 | Inlets adjust (60260100) | EACH | 1 | $943.50 | $1,237.22 | $1,931.63 |
| 20 | VV adjust (60265700) | EACH | 33 | $820.54 | $939.83 | $1,335.00 |
| 21 | Man frames adjust (60300350) | EACH | 23 | $1,071.50 | $2,270.50 | $1,710.00 |
| 22 | Comb CC&G TY B-6.24 (60605000) | LF | 316 | $99.71 | $157.16 | $128.78 |
| 23 | Non SPL waste disposl (66900200) | CY | 2 | $365.93 | $741.40 | $384.99 |
| 24 | Soil disposal analy (66900530) | EACH | 1 | $1,428.00 | $1,470.00 | $1,502.38 |
| 25 | Reg sub P-const plan (66901001) | LS | 1 | $2,244.00 | $2,310.00 | $2,360.88 |
| 26 | Reg sub F con report (66901003) | LS | 1 | $2,244.00 | $2,310.00 | $2,360.88 |
| 27 | Reg sub mon (66901006) | CAL DAY | 10 | $918.00 | $945.00 | $965.81 |
| 28 | Engr field office A (67000400) | CAL MO | 12 | $2,510.52 | $3,679.49 | $3,343.99 |
| 29 | Mobilization (67100100) | LS | 1 | $46,815 | $43,333 | $39,700 |
| 30 | TR cont & prot 701606 (70102625) | LS | 1 | $2,799.16 | $0.01 | $13,736 |
| 31 | TR cont & prot 701602 (70102632) | LS | 1 | $27,092 | $60,329 | $13,414 |
| 32 | TR cont & prot 701701 (70102635) | LS | 1 | $26,960 | $1,365.00 | $4,829.07 |
| 33 | TR cont & prot 701801 (70102640) | LS | 1 | $1,210.50 | $4,000.39 | $1,475.55 |
| 34 | TR cont surveillance (70103815) | CAL DAY | 10 | $0.01 | $1,108.49 | $1,131.94 |
| 35 | Changeable message SN (70107025) | CAL DAY | 14 | $67.25 | $225.23 | $80.48 |
| 36 | Short term pavt mking (70300100) | LF | 4,086 | $0.40 | $0.01 | $1.82 |
| 37 | SHRT TRM pavt MK rem (70300150) | SF | 1,362 | $3.15 | $0.01 | $5.91 |
| 38 | Mod ureth PM LTR-sym (78009000) | SF | 593 | $4.59 | $4.73 | $4.83 |
| 39 | Mod ureth PM line 5 (78009005) | LF | 28,225 | $1.57 | $1.62 | $1.65 |
| 40 | Mod ureth PM line 6 (78009006) | LF | 6,062 | $1.89 | $1.94 | $1.99 |
| 41 | Mod ureth PM line 8 (78009008) | LF | 334 | $2.52 | $2.59 | $2.65 |
| 42 | Mod ureth PM line 12 (78009012) | LF | 265 | $3.77 | $3.89 | $3.97 |
| 43 | Mod ureth PM line 24 (78009024) | LF | 311 | $7.65 | $7.88 | $8.05 |
| 44 | GRV RCSD PM LTR & sym (78011000) | SF | 593 | $6.63 | $6.83 | $6.98 |
| 45 | GRV RCSD PVT MRKG 6 (78011030) | LF | 28,225 | $0.48 | $0.49 | $0.50 |
| 46 | GRV RCSD PVT MRKG 7 (78011035) | LF | 6,062 | $0.60 | $0.62 | $0.63 |
| 47 | GRV RCSD PVT MRKG 9 (78011045) | LF | 334 | $0.90 | $0.92 | $0.94 |
| 48 | GRV RCSD PVT MRKG 13 (78011065) | LF | 265 | $3.06 | $3.15 | $3.22 |
| 49 | GRV RCSD PVT MRKG 25 (78011125) | LF | 311 | $6.12 | $6.30 | $6.44 |
| 50 | Raised refl pavt MKR (78100100) | EACH | 603 | $36.36 | $37.43 | $38.26 |
| 51 | Raised ref PVT MK rem (78300200) | EACH | 603 | $13.46 | $10.85 | $19.99 |
| 52 | Main EX TR sig instal (85000200) | EACH | 1 | $10,710 | $11,025 | $11,268 |
| 53 | Elcbl C signal 14 2C (87301215) | LF | 160 | $18.42 | $18.96 | $19.38 |
| 54 | Ped push-button (88800100) | EACH | 2 | $3,034.50 | $3,123.75 | $3,192.55 |
| 55 | Rem elcbl FR con (89502300) | LF | 170 | $2.68 | $2.76 | $2.82 |
| 56 | Remov EX TS equip (89502375) | EACH | 1 | $1,071.00 | $1,102.50 | $1,126.78 |
| 57 | Remov EX conc FDN (89502385) | EACH | 1 | $1,428.00 | $1,470.00 | $1,502.38 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.