Brandt Construction Co.: IDOT bid record

Brandt Construction Co. submitted 184 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 28 of them (15%). When it was not low, its total sat a median +24% above the low bid.

Owner
Illinois DOT
Low bid volume
$35,805,563
Latest bid
18 SEP 2026
Data through
18 SEP 2026
184Bids
28Low bids
15Win rate, percent
+24%Median gap to the low bid when not low, 156 bids

By year

YearBidsLow bidsWin rate
202138616%
202229724%
202331413%
202428311%
202534515%
202624313%
Brandt Construction Co., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 029378%
District 04752128%
District 031000%
District 06600%
Brandt Construction Co., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Trainees TPGZ0076604HR3232 (100%)$15.00$15.00
TraineesZ0076600HR3232 (100%)$0.80$0.80
Earth excavation20200100CY6529 (45%)$35.00$48.00
P bit matls tack CT40600295LB3219 (59%)$1.00$1.11
Anchor bolts 152100520EACH2119 (90%)$70.00$155.00
Bit matls tack CT40600290LB6318 (29%)$1.55$0.01
Temp conc barrier70400100LF5118 (35%)$35.00$31.73
Reinf bars, epoxy CTD50800205LB7316 (22%)$2.90$2.50
HMA SC IL-9.5 C N5040604050TON4216 (38%)$177.50$144.00
HMA surf rem butt JT40600982SY4015 (38%)$36.50$16.50
Rel temp conc barrier70400200LF4714 (30%)$10.00$8.00
Structure excavation50200100CY3814 (37%)$35.00$46.00
Brandt Construction Co., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Brandt Construction Co., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202664T43District 02Section (37-(3-1,4,5,6))BRR3 of 4$11,518,484+32%
31 JUL 202664T48District 02Section (105BR-1)BRR3 of 3$749,636+43%
31 JUL 202664V41District 02Section ((33,40-1)&(115))PP2 of 2$791,482+5.0%
31 JUL 202668L03District 04Section 22PP1 of 2$630,038Low, 5.0% under the second
12 JUN 202664T46District 02Section (115BR)BRR3 of 3$475,691+35%
12 JUN 202666N45District 03Section (06-3HB)BR3 of 3$2,941,662+22%
12 JUN 202668J50District 04Section 4RS-61 of 2$1,613,831Low, 19% under the second
12 JUN 202668K21District 04Section 35RS-52 of 2$1,923,179+24%
12 JUN 202685794District 02City Of Rock Island, section 22-00209-00-SW4 of 5$886,836+46%
12 JUN 202689864District 04Aledo, section 24-00051-00-SW3 of 4$208,478+16%
24 APR 202668K33District 04Section 121RS-22 of 2$2,127,844+14%
24 APR 202689844District 04Project Number: Ykq5-440 / /, section 21-00112-00-BR2 of 3$2,859,093+18%
24 APR 202689871District 04Project Number: Gl14-828 / /, section 23-00074-77-BR2 of 2$2,176,510+20%
27 FEB 202668K58District 04Section [(12B)BR]BRR2 of 3$477,933+22%
27 FEB 202668K59District 04Section [(55-2)B,B-1]SLP1 of 2$128,795Low, 8.0% under the second
27 FEB 202693845District 06Project Number: Yehf-204 / /, section 24-08117-00-BR3 of 4$557,455+10%
16 JAN 202664L71District 02Section 136CR3 of 6$1,033,246+27%
16 JAN 202664U81District 02Section (2-1A)PP3 of 3$1,111,092+43%
16 JAN 202664U83District 02Section (112Y-1)PP&SR3 of 3$1,484,236+117%
16 JAN 202685763District 02Moline, section 19-00274-00-BT7 of 7$1,437,518+47%
16 JAN 202685786District 02Project Number: Hhn6-619 / /, section 18-00237-00-BR3 of 3$3,895,254+37%
16 JAN 202689781District 04Project Number: Rjcz-314 / /, section 17-00138-00-BR3 of 3$1,316,950+18%
16 JAN 202689823District 04Project Number: 3J5S-767 / /, section 20-00118-00-BR3 of 4$729,664+24%
16 JAN 202689834District 04Galesburg, section 19-01502-40-BT2 of 3$2,228,613+16%
07 NOV 202546944District 023 of 3$1,704,955+66%
Brandt Construction Co.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy