Langman Construction, Inc.: IDOT bid record
Langman Construction, Inc. submitted 34 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 12 JUN 2026, and was the low bidder on 7 of them (21%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $11,747,702
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 1 | 0 | 0% |
| 2022 | 3 | 3 | 100% |
| 2023 | 5 | 1 | 20% |
| 2024 | 9 | 3 | 33% |
| 2025 | 12 | 0 | 0% |
| 2026 | 4 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 31 | 4 | 13% |
| District 04 | 3 | 3 | 100% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Short term pavt mking | 70300100 | LF | 15 | 10 (67%) | $1.00 | $1.01 |
| Bit matls tack CT | 40600290 | LB | 12 | 10 (83%) | $0.01 | $0.01 |
| Changeable message SN | 70107025 | CAL DAY | 11 | 10 (91%) | $50.00 | $55.00 |
| SHRT TRM pavt MK rem | 70300150 | SF | 14 | 9 (64%) | $1.93 | $1.20 |
| Trainees TPG | Z0076604 | HR | 9 | 9 (100%) | $15.00 | $15.00 |
| Sidewalk rem | 44000600 | SF | 16 | 8 (50%) | $2.00 | $3.00 |
| Sign panel T1 | 72000100 | SF | 13 | 8 (62%) | $35.00 | $31.00 |
| Trainees | Z0076600 | HR | 8 | 8 (100%) | $0.80 | $0.80 |
| HMA BC HM N50 | 40600900 | TON | 8 | 8 (100%) | $100.00 | $180.00 |
| Perimeter eros bar | 28000400 | LF | 11 | 7 (64%) | $3.00 | $3.50 |
| Teles STL sin support | 72800100 | LF | 11 | 7 (64%) | $24.00 | $19.50 |
| GRV RCSD PVT MRKG 5 | 78011025 | LF | 10 | 7 (70%) | $0.49 | $0.65 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Valley Construction Co. | 25 | 15 of 25 |
| Brandt Construction Co. | 24 | 11 of 24 |
| McCarthy Improvement Company | 10 | 7 of 10 |
| Phoenix Corporation of the Quad Cities | 9 | 5 of 9 |
| Advanced Asphalt Company | 8 | 7 of 8 |
| Centennial Contractors of the Quad Cities, Inc. | 6 | 5 of 6 |
| Miller Trucking & Excavating Company | 5 | 4 of 5 |
| Fischer Excavating, Inc. | 2 | 0 of 2 |
| J.C. Dillon, Inc. | 2 | 2 of 2 |
| Gensini Excavating, Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 85794 | District 02 | City Of Rock Island, section 22-00209-00-SW | 2 of 5 | $699,792 | +15% |
| 16 JAN 2026 | 64U16 | District 02 | Section ((3,10 | 3 of 3 | $6,578,390 | +9.0% |
| 16 JAN 2026 | 85763 | District 02 | Moline, section 19-00274-00-BT | 6 of 7 | $1,177,655 | +21% |
| 16 JAN 2026 | 85780 | District 02 | East Moline, section 22-00159-03-PV | 3 of 3 | $11,226,679 | +25% |
| 07 NOV 2025 | 64U80 | District 02 | 2 of 4 | $529,098 | +54% | |
| 07 NOV 2025 | 64U82 | District 02 | 3 of 4 | $774,698 | +46% | |
| 07 NOV 2025 | 64U87 | District 02 | 4 of 5 | $499,304 | +40% | |
| 19 SEP 2025 | 64P76 | District 02 | Section (102W,103)RS | 2 of 4 | $2,480,379 | +6.0% |
| 19 SEP 2025 | 85782 | District 02 | Moline, section 22-00288-00-SW | 3 of 6 | $523,916 | +18% |
| 13 JUN 2025 | 64R16 | District 02 | Section (81-2,2HB-1,2-1,3)RS | 3 of 3 | $14,605,756 | +26% |
| 25 APR 2025 | 85774 | District 02 | East Moline, section 22-00159-00-PV, | 4 of 4 | $14,651,292 | +20% |
| 07 MAR 2025 | 64T82 | District 02 | Section (33&40)1RS | 3 of 4 | $295,610 | +11% |
| 07 MAR 2025 | 85765 | District 02 | Silvis, section 20-00052-00-BT | 6 of 8 | $1,490,966 | +29% |
| 17 JAN 2025 | 64N06 | District 02 | Section (18Z)RS-6 | 3 of 3 | $1,088,604 | +8.0% |
| 17 JAN 2025 | 85767 | District 02 | East Moline, section 22-00159-00-PV | 5 of 5 | $1,097,500 | +31% |
| 17 JAN 2025 | 85772 | District 02 | Moline, section 21-00287-00-RS | 4 of 4 | $1,635,329 | +4.0% |
| 13 DEC 2024 | 64N05 | District 02 | Section (37-1)RS,(37-1HB,1VBY)BDR,(81-37-2BR)BDR | 3 of 3 | $28,368,793 | +16% |
| 14 JUN 2024 | 85751 | District 02 | Moline, section 14-00267-00-BT | 4 of 7 | $438,995 | +17% |
| 26 APR 2024 | 64N90 | District 02 | Section (103MFT, | 1 of 2 | $2,106,327 | Low, 0.0% under the second |
| 26 APR 2024 | 64T14 | District 02 | Section (12-15D,20MFT,68MFT,113)RS&(68MFT,113)SR | 3 of 3 | $7,172,453 | +50% |
| 26 APR 2024 | 64T22 | District 02 | Section ((102,103)(20)(19,20)(19,9-15D,103))SR | 3 of 4 | $953,483 | +77% |
| 08 MAR 2024 | 68E30 | District 04 | Section (123, | 1 of 1 | $5,182,635 | Low |
| 08 MAR 2024 | 85755 | District 02 | Moline, section 21-00286-00-RS | 1 of 3 | $1,044,013 | Low, 7.0% under the second |
| 19 JAN 2024 | 85746 | District 02 | Project Number: Ebil-868 / /, section 23-00393-00-RS | 3 of 3 | $399,623 | +18% |
| 19 JAN 2024 | 85747 | District 02 | City Of Rock Island, section 19-00197-00-RS | 3 of 3 | $1,465,493 | +5.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.