IDOT contract 85774 bid tabulation

East Moline, section 22-00159-00-PV,. Let by Illinois DOT on April 25, 2025, Rock Island, District 02. 4 bids received; low bid $12,185,222 by Valley Construction Co..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
174
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Valley Construction Co.$12,185,222Low
2McCarthy Improvement Company$12,899,832+6.0%
3Miller Trucking & Excavating Company$14,547,990+19%
4Langman Construction, Inc.$14,651,292+20%
IDOT contract 85774: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Valley Construction Co.2. McCarthy Improvement Company3. Miller Trucking & Excavating Company4. Langman Construction, Inc.
1T-ginkgo bil PS 3 (A2004524)EACH11$1,055.00$1,055.00$1,100.00$650.00
2T-gled tri-I SK 3 (A2004824)EACH27$963.00$963.00$1,150.00$650.00
3T-gymnoc DE JFS 3 (A2005042)EACH8$904.00$904.00$1,050.00$650.00
4T-lirioden tul 3 (A2005424)EACH13$866.00$866.00$1,000.00$650.00
5T-plat X acr MC 2.5 (A2005960)EACH19$709.00$709.00$850.00$600.00
6T-ulmus jap X wil 2.5 (A2008517)EACH8$803.00$803.00$950.00$600.00
7T-ulmus parv FR 2-1/2 (A2008630)EACH6$796.00$796.00$950.00$600.00
8P PL ornament T gal P (K0012990)UNIT73$3,525.00$4,177.10$4,000.00$3,500.00
9P PL ornament T 5G P (K0012995)UNIT3$6,995.00$6,995.97$8,000.00$6,500.00
10Sidewalk, special (XX006429)SF2,561$21.00$27.00$18.50$20.00
11Concrete pavers typ A (XX006739)SF5,238$28.95$35.35$34.00$30.00
12Concrete pavers typ B (XX006740)SF6,732$26.30$30.81$31.00$28.00
13Ped bench fur & inst (XX007852)EACH2$21,500$23,000$30,000$20,000
14Drinking fountain (XX009045)EACH1$16,500$18,000$18,000$14,500
15Geotextile fabric (XX009314)SY656$8.40$6.50$7.00$2.00
16RR row entry permit (X0326275)EACH2$3,650.00$2,500.00$6,000.00$16,500
17Info kiosk complete (X0326406)EACH1$34,000$46,000$52,500$42,835
18Tri geogrid reinf T1 (X0327487)SY3,502$5.50$5.00$6.50$4.00
19Conc paver pavement (X0327978)SY3,502$177.90$171.00$210.00$180.00
20Trash receptacles (X0327997)EACH26$3,200.00$3,700.00$4,400.00$4,000.00
21Infiltration agg (X1200055)CY227$126.00$180.00$80.00$90.00
22SP RR ful act cont SP (X1400214)EACH1$6,500.00$6,500.00$7,250.00$6,500.00
23Luminaire LED special (X1400238)EACH129$2,875.00$2,875.00$3,000.00$2,875.00
24River rock (X1800002)TON55$215.00$138.00$115.00$250.00
25Tree rem < 6 unit dia (X2010106)UNIT27$65.00$30.00$80.00$50.00
26Stump removal only (X2010400)UNIT12$65.00$30.00$500.00$50.00
27Geotech fabric SPL (X2100102)SY3,694$7.50$4.75$8.50$2.00
28PLNTG soil mix F&P 30 (X2111230)SY2,088$99.45$86.00$110.00$85.00
29Rem & rel sign panel (X2600011)EACH50$175.00$175.00$250.00$175.00
30Rem & rel SN P&P assy (X2600012)EACH39$200.00$200.00$550.00$200.00
31Gateway mon sign comp (X2600032)EACH1$55,000$103,000$80,000$150,000
32Agg base cse CA-7 (X3510407)TON3,039$51.50$62.00$44.00$45.00
33PC conc SDWLK 5 CLRD (X4240200)SF18,172$14.75$18.00$15.00$18.50
34Abandon fill SS (X5509900)LF207$19.00$39.00$30.00$25.00
35Trench drain (X6010302)LF597$286.00$250.00$225.00$350.00
36Pipe drains 15 SPL (X6012105)LF318$75.00$65.00$100.00$60.00
37Pipe drains 18 SPL (X6012108)LF158$80.00$72.50$115.00$70.00
38Sanitary manhole adj (X6026050)EACH4$1,785.00$830.00$4,000.00$2,000.00
39Remov inlets SPL (X6050065)EACH17$1,500.00$1,300.00$700.00$2,000.00
40Comb CC&G TB6.18 SPL (X6060048)LF553$50.00$70.00$57.00$60.00
41Conc curb TB SPL (X6061005)LF900$78.00$105.50$57.00$60.00
42Traf cont & prot SPL (X7010216)LS1$75,000$223,700$250,000$300,000
43Sign and post (X7200064)EACH9$9,300.00$8,800.00$5,000.00$9,300.00
44Small entrance sign (X7200066)EACH9$7,900.00$7,200.00$5,000.00$7,900.00
45Light controller SPL (X8250505)EACH2$44,405$44,404$38,000$44,404
46Light pole special (X8300001)EACH65$16,550$16,550$22,000$16,550
47Accessible ped signal (X8760200)EACH8$1,080.00$1,080.80$975.00$1,080.80
48Ped SH P LED 1F BM SP (X8812815)EACH8$1,080.00$1,080.80$1,075.00$1,080.80
49Video veh det sys (X8891001)EACH1$39,098$39,098$38,000$39,098
50Benches (Z0003850)EACH50$4,500.00$4,750.00$7,000.00$4,500.00
51Bicycle racks (Z0003855)EACH40$1,175.00$1,200.00$3,100.00$2,500.00
52Construction layout (Z0013798)LS1$75,000$103,000$100,000$75,000
53RR prot liability ins (Z0048665)LS1$10,000$5,000.00$12,000$15,000
54SS 2 wat MN 12 (Z0056668)LF374$93.50$90.00$120.00$161.00
55SS 2 wat MN 15 (Z0056669)LF229$105.00$87.00$135.00$181.00
56SS 2 wat MN 18 (Z0056670)LF219$115.00$106.00$145.00$201.00
57SS 2 wat MN 24 (Z0056672)LF62$185.00$152.00$285.00$301.00
58Trainees (Z0076600)HR2,000$0.80$0.80$0.80$0.80
59Trainees TPG (Z0076604)HR2,000$15.00$15.00$15.00$15.00
60Tree remov 6-15 (20100110)UNIT182$55.00$40.00$80.00$75.00
61Tree remov over 15 (20100210)UNIT18$50.00$50.00$90.00$100.00
62Earth excavation (20200100)CY9,679$28.00$27.00$35.00$40.00
63Trench backfill (20800150)CY3,638$39.00$40.00$45.00$40.00
64Geotech fab F/GR stab (21001000)SY13,812$2.59$1.50$5.50$3.00
65Sodding salt tolerant (25200110)SY1,261$1.00$42.00$30.00$14.00
66Inlet & pipe protect (28000500)EACH205$1.00$150.00$250.00$125.00
67Agg subgrade impr 12 (30300112)SY13,812$25.00$15.50$18.00$27.00
68Sub gran mat A 4 (31100300)SY13,811$7.20$6.25$7.50$12.00
69Sub gran mat B 4 (31101200)SY9,786$16.50$16.00$6.50$12.00
70Aggregate-temp access (40201000)TON464$61.00$29.50$32.25$45.00
71PCC PVT 7 jointed (42000201)SY13,811$79.50$82.00$101.70$95.00
72PCC driveway pavt 8 (42300400)SY1,391$100.00$90.00$93.60$100.00
73PC conc sidewalk 5 (42400200)SF74,556$9.50$12.50$11.55$13.00
74Detectable warnings (42400800)SF725$30.00$35.00$57.75$85.00
75Pavement rem (44000100)SY24,031$11.50$11.00$13.20$25.00
76Drive pavement rem (44000200)SY738$21.00$18.50$12.00$14.00
77Comb curb gutter rem (44000500)LF8,328$4.25$3.75$10.00$8.00
78Sidewalk rem (44000600)SF71,294$2.25$1.40$2.50$1.10
79Reinf bars, epoxy CTD (50800205)LB3,330$2.15$3.50$2.30$3.50
80Pedestrian rail (50900805)LF858$132.16$84.50$160.00$225.00
81Drilled shaft in soil (51603000)CY9$1,550.00$6,500.00$1,100.00$5,500.00
82Storm sew CL A 2 12 (550A0340)LF991$84.00$68.00$95.00$125.00
83Storm sew CL A 2 15 (550A0360)LF439$89.25$65.00$106.00$135.00
84Storm sew CL A 2 18 (550A0380)LF510$99.50$80.00$114.00$140.00
85Storm sew CL A 2 21 (550A0400)LF91$121.00$85.00$125.00$160.00
86Storm sew CL A 2 24 (550A0410)LF210$116.00$91.00$135.00$160.00
87Storm sew CL A 2 36 (550A0450)LF45$225.00$144.00$170.00$190.00
88Storm sewer rem 12 (55100500)LF457$24.65$27.00$11.00$25.00
89Storm sewer rem 15 (55100700)LF189$25.50$33.00$13.00$25.00
90Storm sewer rem 18 (55100900)LF31$25.95$30.00$17.50$30.00
91Storm sewer rem 24 (55101200)LF22$27.50$28.00$28.00$30.00
92Storm sewer rem 30 (55101400)LF1,955$32.00$32.00$20.50$35.00
93Storm sewer rem 36 (55101600)LF796$36.50$39.00$31.75$40.00
94Water valves adjust (56109210)EACH89$800.00$57.00$1,320.00$400.00
95Fire hydnts to BE adj (56400300)EACH5$2,250.00$910.00$5,000.00$2,150.00
96Fire hydnts relocated (56400400)EACH6$5,550.00$1,900.00$5,000.00$4,900.00
97Pipe underdrain 4 SP (60108100)LF471$15.75$9.50$55.00$25.00
98Pipe underdr T 2 12 (60108212)LF2,302$69.50$47.00$75.00$40.00
99Man TA 4 dia T1F CL (60218400)EACH1$4,250.00$4,200.00$5,500.00$4,500.00
100Man TA 4 dia T23F&G (60219530)EACH16$4,275.00$4,200.00$4,575.00$4,500.00
101Man TA 5 dia T1F CL (60221100)EACH3$6,000.00$5,350.00$6,400.00$6,500.00
102Man TA 5 dia T23F&G (60222230)EACH1$6,000.00$6,350.00$6,400.00$6,500.00
103Man TA 6 dia T1F CL (60223800)EACH2$8,000.00$6,975.00$10,250$10,000
104Man TA 7 dia T23F&G (60224439)EACH1$11,250$10,800$15,750$15,000
105Man TA 7 dia T1F CL (60224446)EACH5$11,184$10,800$15,850$15,000
106Inlets TB T23F&G (60240327)EACH104$3,100.00$3,225.00$4,500.00$5,000.00
107Man adj new T23F&G (60256930)EACH1$1,400.00$1,100.00$2,500.00$2,000.00
108Man reconst (60257900)EACH2$4,450.00$1,390.00$2,500.00$4,500.00
109Inl recon new T1F CL (60263000)EACH2$4,650.00$1,770.00$2,500.00$4,500.00
110FR & grates adjust (60300105)EACH16$1,200.00$850.00$2,800.00$1,200.00
111Remov manholes (60500040)EACH9$1,205.00$725.00$550.00$1,000.00
112Remov inlets (60500060)EACH40$800.00$725.00$400.00$1,000.00
113Comb CC&G TB6.18 (60604400)LF7,898$39.50$42.00$52.00$52.00
114Non SPL waste disposl (66900200)CY281$105.00$61.00$50.00$75.00
115Soil disposal analy (66900530)EACH1$1,500.00$1,900.00$2,000.00$1,900.00
116Reg sub P-const plan (66901001)LS1$4,000.00$2,250.00$4,500.00$2,250.00
117Reg sub F con report (66901003)LS1$1,200.00$2,350.00$1,350.00$2,350.00
118Reg sub mon (66901006)CAL DAY7$1,000.00$1,500.00$1,120.00$1,500.00
119Mobilization (67100100)LS1$335,000$773,000$413,840$850,000
120Sign panel T1 (72000100)SF120$28.00$47.50$32.00$47.50
121Remov sign panel T1 (72400310)SF38$52.00$52.00$22.00$52.00
122Teles STL sin support (72800100)LF252$28.00$20.00$35.00$20.00
123Epoxy PVT MK LTR-sym (78005100)SF712$6.60$6.60$10.00$6.60
124Epoxy PVT MK line 4 (78005110)LF9,233$1.48$1.48$1.00$1.48
125Epoxy PVT MK line 6 (78005130)LF139$2.30$2.31$1.50$2.31
126Epoxy PVT MK line 12 (78005150)LF78$4.60$4.62$5.00$4.62
127Epoxy PVT MK line 24 (78005180)LF1,976$9.25$9.24$10.00$9.24
128Pref THPL PM LTR-sym (78006100)SF1,567$13.75$13.75$20.00$13.75
129GRV RCSD PVT MRKG 5 (78011025)LF9,233$0.50$0.49$0.80$0.49
130GRV RCSD PVT MRKG 7 (78011035)LF139$0.75$0.75$7.50$0.75
131GRV RCSD PVT MRKG 13 (78011065)LF78$1.50$1.48$11.00$1.48
132GRV RCSD PVT MRKG 25 (78011125)LF1,976$3.00$2.97$6.25$2.97
133Elect serv install (80400100)EACH2$5,415.00$5,414.00$4,000.00$5,414.00
134Undrgrd C galvs 2 (81028200)LF71$52.45$52.43$85.00$52.43
135Undrgrd C galvs 2 1/2 (81028210)LF65$63.00$63.03$135.00$63.03
136Undrgrd C galvs 3 (81028220)LF55$86.30$86.28$70.00$86.28
137Undrgrd C galvs 4 (81028240)LF135$113.15$113.13$258.00$113.13
138Undrgrd C galvs 5 (81028250)LF84$170.80$170.78$280.00$170.78
139Undrgrd C PVC 1 1/2 (81028340)LF16,826$16.60$16.61$7.55$16.61
140Undrgrd C PVC 2 (81028350)LF12,124$16.35$16.35$10.50$16.34
141Handhole (81400100)EACH22$6,141.50$6,141.41$4,500.00$6,141.41
142DBL handhole (81400300)EACH1$10,140$10,141$4,850.00$10,141
143Gulfbox junction CC (81500120)EACH2$1,495.00$1,494.94$1,700.00$1,494.94
144EC C XLP use 1C 10 (81702110)LF7,683$1.50$1.50$1.25$1.50
145EC C XLP use 1C 6 (81702130)LF17,883$2.90$2.89$2.40$2.89
146EC C XLP use 1C 4 (81702140)LF32,412$3.90$3.91$3.45$3.91
147EC C XLP use 1C 2 (81702150)LF9,300$6.00$6.00$5.05$6.00
148EC C XLP use 1C 1 (81702155)LF6,924$5.85$5.86$3.29$5.86
149A CBL 3-1C8 mess wire (81800340)LF3,743$30.95$30.96$52.50$30.96
150Light pole FDN 24D (83600200)LF390$386.00$386.00$1,680.00$386.00
151Rem LT unit salv (84200500)EACH35$1,650.00$1,650.50$16.60$1,650.50
152RR fac & TY V cab (85700310)EACH1$33,220$33,222$31,000$32,222
153Uninter power sup STD (86200200)EACH1$8,778.00$8,778.00$5,600.00$8,788.00
154Elcbl C signal 14 2C (87301215)LF1,058$2.00$2.00$2.25$2.00
155Elcbl C signal 14 3C (87301225)LF1,058$2.80$2.80$2.34$2.80
156Elcbl C signal 14 5C (87301245)LF626$3.50$3.50$2.65$3.50
157Elcbl C signal 14 7C (87301255)LF1,554$4.00$4.00$3.25$4.00
158Elcbl C railrd 14 3C (87301750)LF455$4.60$4.62$8.50$4.62
159Elcbl C serv 6 2C (87301805)LF53$6.50$6.50$4.75$6.50
160TS post galvs 10 (87502440)EACH1$2,650.00$2,646.00$2,350.00$2,646.00
161TS post galvs 16 (87502500)EACH4$3,085.00$3,085.85$2,700.00$3,085.50
162S maa & P 24 (87700160)EACH1$19,950$19,953$16,500$19,953
163S maa & P 26 (87700170)EACH2$18,875$18,874$18,500$18,874
164S maa & P 28 (87700180)EACH1$19,615$19,616$19,250$19,616
165Conc FDN TY A (87800100)LF20$440.00$440.00$350.00$440.00
166Conc FDN TY C (87800150)LF4$1,100.00$1,100.00$1,215.00$1,000.00
167Conc FDN TY E 36D (87800415)LF44$520.00$520.00$2,100.00$520.00
168SH LED 1F 3S mam (88030020)EACH4$1,075.00$1,074.74$1,050.00$1,074.74
169SH LED 1F 5S BM (88030100)EACH5$1,365.00$1,367.67$1,450.00$1,367.67
170SH LED 1F 5S mam (88030110)EACH5$1,760.00$1,761.61$1,475.00$1,761.61
171TS backplate (88200100)EACH14$240.00$240.40$200.00$240.40
172Remov EX TS equip (89502375)EACH1$13,240$13,240$10,050$13,240
173Remov EX handhole (89502380)EACH6$1,560.00$1,561.61$1,250.00$1,561.61
174Remov EX conc FDN (89502385)EACH5$2,080.00$2,080.00$1,500.00$2,080.80
IDOT contract 85774: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy