McCarthy Improvement Company: IDOT bid record
McCarthy Improvement Company submitted 71 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 31 JUL 2026, and was the low bidder on 19 of them (27%). When it was not low, its total sat a median +31% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $85,241,387
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 6 | 2 | 33% |
| 2022 | 8 | 2 | 25% |
| 2023 | 7 | 2 | 29% |
| 2024 | 18 | 7 | 39% |
| 2025 | 21 | 3 | 14% |
| 2026 | 11 | 3 | 27% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 31 | 8 | 26% |
| District 07 | 20 | 5 | 25% |
| District 04 | 13 | 2 | 15% |
| District 08 | 2 | 1 | 50% |
| District 03 | 2 | 1 | 50% |
| District 05 | 2 | 2 | 100% |
| District 09 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Trainees TPG | Z0076604 | HR | 24 | 24 (100%) | $15.00 | $15.00 |
| Trainees | Z0076600 | HR | 22 | 22 (100%) | $0.80 | $0.80 |
| Perimeter eros bar | 28000400 | LF | 41 | 14 (34%) | $3.20 | $3.50 |
| Pavement rem | 44000100 | SY | 41 | 14 (34%) | $20.00 | $20.30 |
| Sidewalk rem | 44000600 | SF | 40 | 14 (35%) | $2.00 | $3.00 |
| Sign panel T1 | 72000100 | SF | 30 | 14 (47%) | $30.00 | $31.00 |
| Filter fabric | 28200200 | SY | 26 | 14 (54%) | $2.35 | $4.65 |
| Changeable message SN | 70107025 | CAL DAY | 25 | 14 (56%) | $48.00 | $55.00 |
| Erosion contr blanket | 25100630 | SY | 21 | 14 (67%) | $1.85 | $1.85 |
| SHRT TRM pavt MK rem | 70300150 | SF | 21 | 13 (62%) | $1.20 | $1.20 |
| Inlet & pipe protect | 28000500 | EACH | 41 | 12 (29%) | $200.00 | $200.00 |
| Drive pavement rem | 44000200 | SY | 40 | 10 (25%) | $19.00 | $20.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Phoenix Corporation of the Quad Cities | 31 | 21 of 31 |
| Brandt Construction Co. | 22 | 15 of 22 |
| Valley Construction Co. | 19 | 10 of 19 |
| Miller Trucking & Excavating Company | 11 | 7 of 11 |
| Centennial Contractors of the Quad Cities, Inc. | 11 | 6 of 11 |
| Feutz Contractors, Inc. | 11 | 8 of 11 |
| Langman Construction, Inc. | 10 | 3 of 10 |
| Gensini Excavating, Inc. | 10 | 8 of 10 |
| Fischer Excavating, Inc. | 9 | 5 of 9 |
| Kinney Contractors, Inc. | 7 | 3 of 7 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 46949 | District 08 | Section ELDON | 1 of 4 | $2,907,718 | Low, 8.0% under the second |
| 31 JUL 2026 | 85781 | District 02 | East Moline, section 22-00159-04-PV | 4 of 4 | $6,559,251 | +3.0% |
| 12 JUN 2026 | 74D42 | District 07 | Section D7 | 2 of 3 | $969,969 | +51% |
| 12 JUN 2026 | 85794 | District 02 | City Of Rock Island, section 22-00209-00-SW | 5 of 5 | $944,635 | +55% |
| 12 JUN 2026 | 89864 | District 04 | Aledo, section 24-00051-00-SW | 4 of 4 | $293,914 | +63% |
| 12 JUN 2026 | 95996 | District 07 | Teutopolis, section 23-00022-00-PV | 2 of 5 | $311,700 | +14% |
| 12 JUN 2026 | 95997 | District 07 | Vandalia, section 21-00070-00-SW | 1 of 5 | $1,645,985 | Low, 9.0% under the second |
| 16 JAN 2026 | 64L71 | District 02 | Section 136CR | 5 of 6 | $1,118,037 | +38% |
| 16 JAN 2026 | 74893 | District 07 | Section (25-1)R-BR | 2 of 4 | $33,960,863 | +4.0% |
| 16 JAN 2026 | 85763 | District 02 | Moline, section 19-00274-00-BT | 3 of 7 | $1,155,181 | +18% |
| 16 JAN 2026 | 85780 | District 02 | East Moline, section 22-00159-03-PV | 1 of 3 | $8,998,442 | Low, 18% under the second |
| 07 NOV 2025 | 64U87 | District 02 | 5 of 5 | $507,693 | +43% | |
| 07 NOV 2025 | 85783 | District 02 | Kewanee, section 22-00111-00-SW | 5 of 8 | $708,003 | +32% |
| 07 NOV 2025 | 85785 | District 02 | Moline, section 23-00291-00-BT | 2 of 6 | $5,105,659 | 0.0% |
| 19 SEP 2025 | 74D57 | District 07 | Section (26-0,1)MED | 4 of 8 | $992,663 | +15% |
| 19 SEP 2025 | 85782 | District 02 | Moline, section 22-00288-00-SW | 6 of 6 | $655,603 | +47% |
| 19 SEP 2025 | 95980 | District 07 | Bethany, section 18-00056-00-SW | 5 of 5 | $526,282 | +87% |
| 19 SEP 2025 | 95983 | District 07 | Project Number: 4Un2-323 / /, section 20-02116-00-PV | 8 of 8 | $509,664 | +38% |
| 19 SEP 2025 | 95988 | District 07 | Flora, section 24-00067-00-SW | 6 of 6 | $439,096 | +104% |
| 13 JUN 2025 | 64M76 | District 02 | Section 75CR | 6 of 6 | $843,902 | +71% |
| 13 JUN 2025 | 70E30 | District 05 | Section D5 | 1 of 3 | $1,111,995 | Low, 7.0% under the second |
| 13 JUN 2025 | 74D32 | District 07 | Section D7 | 3 of 3 | $899,374 | +90% |
| 25 APR 2025 | 85774 | District 02 | East Moline, section 22-00159-00-PV, | 2 of 4 | $12,899,832 | +6.0% |
| 25 APR 2025 | 85778 | District 02 | Rochelle, section 23-00118-00-RP | 1 of 2 | $4,668,879 | Low, 2.0% under the second |
| 25 APR 2025 | 89868 | District 04 | Aledo, section 23-00049-00-BT | 3 of 8 | $1,065,432 | +16% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.