East Moline, section 22-00159-03-PV. Let by Illinois DOT on January 16, 2026, Rock Island, District 02. 3 bids received; low bid $8,998,442 by McCarthy Improvement Company.
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 193
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | McCarthy Improvement Company | $8,998,442 | Low |
| 2 | Gensini Excavating, Inc. | $10,596,366 | +18% |
| 3 | Langman Construction, Inc. | $11,226,679 | +25% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. McCarthy Improvement Company | 2. Gensini Excavating, Inc. | 3. Langman Construction, Inc. |
|---|---|---|---|---|---|---|
| 1 | T-ginkgo bil PS 3 (A2004524) | EACH | 8 | $490.00 | $935.92 | $840.50 |
| 2 | T-gled TR-I imp 3 (A2004621) | EACH | 12 | $490.00 | $880.87 | $840.50 |
| 3 | T-gymnoc DE JFS 3 (A2005042) | EACH | 10 | $490.00 | $880.87 | $840.50 |
| 4 | T-lirioden tul 3 (A2005424) | EACH | 12 | $490.00 | $880.87 | $840.50 |
| 5 | T-plat X acr MC 2.5 (A2005960) | EACH | 10 | $490.00 | $880.87 | $840.50 |
| 6 | T-ulmus jap X wil 2.5 (A2008517) | EACH | 9 | $490.00 | $880.87 | $840.50 |
| 7 | T-aesculus pavia 6' (A2022166) | EACH | 65 | $108.00 | $880.87 | $840.50 |
| 8 | S-rhus typhina BT 3' (C2006086) | EACH | 55 | $108.00 | $880.87 | $511.00 |
| 9 | S-viburn prun 6' (C2012772) | EACH | 64 | $215.00 | $275.27 | $511.00 |
| 10 | P PL ornament T gal P (K0012990) | UNIT | 16 | $32.00 | $4,360.29 | $4,311.00 |
| 11 | P PL ornament T 5G P (K0012995) | UNIT | 2 | $80.50 | $8,423.30 | $10,028 |
| 12 | PCC PVMT 9 SPL W IC (LR420133) | SY | 21,539 | $91.00 | $108.46 | $96.00 |
| 13 | Concrete pavers typ A (XX006739) | SF | 1,170 | $69.00 | $38.33 | $36.25 |
| 14 | Concrete pavers typ B (XX006740) | SF | 720 | $71.00 | $48.92 | $44.75 |
| 15 | Electric box adjusted (XX006857) | EACH | 1 | $4,000.00 | $4,148.89 | $3,768.00 |
| 16 | Handhole SP 12" X 12" (XX007125) | EACH | 59 | $490.00 | $503.42 | $457.20 |
| 17 | Ped bench fur & inst (XX007852) | EACH | 2 | $6,900.00 | $27,867 | $27,500 |
| 18 | Wayfinding sign (XX008269) | EACH | 6 | $4,500.00 | $9,359.22 | $12,640 |
| 19 | Pan board,NEMA X4,SPL (XX008431) | EACH | 1 | $13,500 | $13,880 | $12,606 |
| 20 | Drinking fountain (XX009045) | EACH | 1 | $17,500 | $20,884 | $6,000.00 |
| 21 | Bicycl repair station (XX009334) | EACH | 1 | $6,400.00 | $3,197.78 | $7,500.00 |
| 22 | Landscaping gravel (X0323117) | SY | 300 | $54.00 | $140.94 | $86.85 |
| 23 | RR row entry permit (X0326275) | EACH | 2 | $3,300.00 | $7,157.05 | $5,000.00 |
| 24 | Info kiosk complete (X0326406) | EACH | 1 | $42,000 | $44,043 | $75,000 |
| 25 | Trash receptacles (X0327997) | EACH | 5 | $3,600.00 | $3,863.06 | $3,000.00 |
| 26 | SP RR ful act cont SP (X1400214) | EACH | 2 | $5,800.00 | $5,912.83 | $5,370.00 |
| 27 | Trench backfill SPL (X2080250) | CY | 650 | $82.50 | $45.14 | $48.60 |
| 28 | PCC surf rem 1 1/2 (X4406812) | SY | 841 | $38.50 | $15.71 | $13.00 |
| 29 | Bicycle railing SPL (X5091725) | LF | 867 | $315.00 | $319.31 | $444.00 |
| 30 | Remove sheet piling (X5220002) | LS | 1 | $18,400 | $28,593 | $1,000.00 |
| 31 | Inlets TA T1F CL SPL (X6023205) | EACH | 1 | $2,000.00 | $2,196.64 | $2,500.00 |
| 32 | Inlets TA T3F&G SPL (X6023206) | EACH | 1 | $4,300.00 | $2,433.37 | $2,500.00 |
| 33 | Double inlet SPL (X6024210) | EACH | 3 | $5,500.00 | $5,494.35 | $6,100.00 |
| 34 | Inlets SPL (X6024240) | EACH | 10 | $3,900.00 | $3,091.81 | $4,000.00 |
| 35 | Inlets SPL N1 (X6024242) | EACH | 26 | $6,800.00 | $4,894.29 | $6,500.00 |
| 36 | Inlets SPL N2 (X6024244) | EACH | 2 | $9,500.00 | $7,619.47 | $9,500.00 |
| 37 | Man adj NF CL bolted (X6025801) | EACH | 1 | $1,800.00 | $890.49 | $1,700.00 |
| 38 | Sanitary manhole adj (X6026050) | EACH | 5 | $1,800.00 | $328.94 | $900.00 |
| 39 | San man reconst (X6026051) | EACH | 1 | $2,200.00 | $1,315.77 | $9,800.00 |
| 40 | Fence removal (X6640104) | LF | 876 | $9.00 | $9.08 | $12.00 |
| 41 | Traf cont & prot SPL (X7010216) | LS | 1 | $80,000 | $203,897 | $150,000 |
| 42 | Conduit splice (X8100105) | EACH | 4 | $550.00 | $545.04 | $1,813.00 |
| 43 | Comb LTG control (X8250091) | EACH | 1 | $2,100.00 | $2,110.78 | $1,917.00 |
| 44 | Accessible ped signal (X8760200) | EACH | 8 | $1,100.00 | $1,106.87 | $1,005.25 |
| 45 | Ped pushbutton post (X8760201) | EACH | 4 | $1,200.00 | $1,159.44 | $1,053.00 |
| 46 | Ped SH P LED 1F BM SP (X8812815) | EACH | 8 | $950.00 | $974.74 | $885.25 |
| 47 | Video veh det sys (X8891001) | EACH | 2 | $32,500 | $33,367 | $30,304 |
| 48 | Temp TR signal timing (X8900104) | EACH | 2 | $3,900.00 | $3,940.78 | $3,579.00 |
| 49 | Benches (Z0003850) | EACH | 5 | $4,600.00 | $4,589.55 | $3,500.00 |
| 50 | Bicycle racks (Z0003855) | EACH | 4 | $1,210.00 | $1,329.24 | $1,200.00 |
| 51 | Construction layout (Z0013798) | LS | 1 | $60,700 | $56,155 | $33,500 |
| 52 | Drainage STR removed (Z0018700) | EACH | 40 | $580.00 | $621.07 | $500.00 |
| 53 | RR prot liability ins (Z0048665) | LS | 1 | $10,000 | $11,561 | $12,500 |
| 54 | Storm sew WM req 12 (Z0056608) | LF | 510 | $89.00 | $100.03 | $97.00 |
| 55 | Storm sew WM req 15 (Z0056610) | LF | 86 | $83.00 | $114.45 | $120.00 |
| 56 | Storm sew WM req 18 (Z0056612) | LF | 209 | $84.00 | $120.41 | $125.00 |
| 57 | Storm sew WM req 24 (Z0056616) | LF | 232 | $114.00 | $153.90 | $160.00 |
| 58 | Temp pavement (Z0062456) | SY | 137 | $286.00 | $132.32 | $60.00 |
| 59 | Trainees (Z0076600) | HR | 1,000 | $0.80 | $0.80 | $0.80 |
| 60 | Trainees TPG (Z0076604) | HR | 1,000 | $15.00 | $15.00 | $15.00 |
| 61 | Tree remov 6-15 (20100110) | UNIT | 245 | $86.00 | $88.09 | $55.00 |
| 62 | Tree remov over 15 (20100210) | UNIT | 287 | $97.00 | $99.10 | $80.00 |
| 63 | Earth excavation (20200100) | CY | 13,490 | $21.50 | $29.38 | $42.00 |
| 64 | Rem & disp uns matl (20201200) | CY | 927 | $28.00 | $30.01 | $52.00 |
| 65 | Porous gran embank (20700220) | CY | 1,270 | $45.50 | $48.30 | $115.00 |
| 66 | Geotech fab F/GR stab (21001000) | SY | 22,666 | $1.50 | $2.20 | $1.50 |
| 67 | Topsoil F & P 6 (21101625) | SY | 13,770 | $10.00 | $21.81 | $9.00 |
| 68 | Topsoil F & P 12 (21101645) | SY | 1,291 | $22.00 | $38.18 | $14.00 |
| 69 | Seeding CL 2A (25000210) | ACRE | 3.25 | $3,000.00 | $3,853.79 | $3,500.00 |
| 70 | Nitrogen fert nutr (25000400) | LB | 280 | $2.50 | $2.20 | $2.00 |
| 71 | Phosphorus fert nutr (25000500) | LB | 280 | $2.50 | $2.20 | $2.00 |
| 72 | Potassium fert nutr (25000600) | LB | 280 | $2.50 | $2.20 | $1.50 |
| 73 | Erosion contr blanket (25100630) | SY | 13,770 | $1.50 | $1.65 | $1.50 |
| 74 | Temp eros contr seed (28000250) | LB | 932 | $3.00 | $4.13 | $3.75 |
| 75 | Perimeter eros bar (28000400) | LF | 1,797 | $3.00 | $4.13 | $3.75 |
| 76 | Inlet & pipe protect (28000500) | EACH | 49 | $135.00 | $115.39 | $200.00 |
| 77 | Agg subgrade impr 12 (30300112) | SY | 22,666 | $19.50 | $21.80 | $27.00 |
| 78 | Sub gran mat A 4 (31100300) | SY | 22,666 | $6.50 | $8.63 | $11.00 |
| 79 | Sub gran mat B 4 (31101200) | SY | 7,549 | $10.00 | $7.58 | $13.00 |
| 80 | Aggregate-temp access (40201000) | TON | 491 | $31.00 | $33.82 | $30.00 |
| 81 | Bit matls tack CT (40600290) | LB | 220 | $3.50 | $16.52 | $0.01 |
| 82 | HMA SC IL-9.5FG C N50 (40604000) | TON | 71 | $278.00 | $302.80 | $275.00 |
| 83 | Incidental HMA surf (40800050) | TON | 26 | $612.00 | $550.54 | $275.00 |
| 84 | PCC driveway pavt 8 (42300400) | SY | 1,435 | $94.00 | $107.32 | $100.00 |
| 85 | PC conc sidewalk 4 (42400100) | SF | 55,018 | $8.50 | $8.86 | $12.00 |
| 86 | Detectable warnings (42400800) | SF | 540 | $31.00 | $22.02 | $50.00 |
| 87 | Pavement rem (44000100) | SY | 20,675 | $9.00 | $11.88 | $25.00 |
| 88 | Drive pavement rem (44000200) | SY | 1,542 | $15.00 | $9.84 | $15.00 |
| 89 | Sidewalk rem (44000600) | SF | 3,122 | $1.00 | $2.43 | $2.00 |
| 90 | Structure excavation (50200100) | CY | 1,490 | $44.00 | $29.09 | $48.00 |
| 91 | Conc struct (50300225) | CY | 628 | $590.00 | $1,250.30 | $1,200.00 |
| 92 | Reinforcement bars (50800105) | LB | 111,230 | $1.40 | $1.90 | $1.85 |
| 93 | Pipe handrail (50901760) | LF | 120 | $500.00 | $519.93 | $490.00 |
| 94 | PRC flar end sec 12 (54213657) | EACH | 2 | $1,300.00 | $1,999.54 | $1,750.00 |
| 95 | PRC FL end S EQ RS 36 (54214521) | EACH | 1 | $3,400.00 | $3,878.00 | $3,200.00 |
| 96 | Storm sew CL A 1 12 (550A0050) | LF | 930 | $70.00 | $90.46 | $100.00 |
| 97 | Storm sew CL A 1 15 (550A0070) | LF | 1,453 | $69.00 | $96.50 | $105.00 |
| 98 | Storm sew CL A 1 18 (550A0090) | LF | 559 | $67.00 | $116.61 | $110.00 |
| 99 | Storm sew CL A 1 24 (550A0120) | LF | 630 | $86.00 | $137.08 | $135.00 |
| 100 | SS CL A 1 eqrs 36 (550A4500) | LF | 59 | $234.00 | $281.20 | $195.00 |
| 101 | Storm sewer rem 12 (55100500) | LF | 1,587 | $25.00 | $42.80 | $15.00 |
| 102 | Storm sewer rem 15 (55100700) | LF | 747 | $25.00 | $42.80 | $15.00 |
| 103 | Storm sewer rem 18 (55100900) | LF | 834 | $26.00 | $42.79 | $15.00 |
| 104 | Storm sewer rem 24 (55101200) | LF | 793 | $25.00 | $42.80 | $20.00 |
| 105 | Storm sewer rem 36 (55101600) | LF | 48 | $42.00 | $67.80 | $30.00 |
| 106 | Adj water main 8 (56106400) | LF | 30 | $250.00 | $601.39 | $60.00 |
| 107 | Fire hydnts relocated (56400400) | EACH | 1 | $12,000 | $7,790.04 | $2,840.00 |
| 108 | Geocomposite wall DR (59100100) | SY | 280 | $48.00 | $28.51 | $68.00 |
| 109 | Pipe underdr T 2 4 (60108204) | LF | 1,150 | $23.00 | $42.03 | $8.00 |
| 110 | Man TA 4 dia T1F CL (60218400) | EACH | 2 | $4,690.00 | $3,655.57 | $4,300.00 |
| 111 | Man TA 6 dia T1F CL (60223800) | EACH | 2 | $7,900.00 | $7,377.21 | $9,000.00 |
| 112 | Inlets TB T1F CL (60240215) | EACH | 3 | $2,850.00 | $2,637.07 | $3,500.00 |
| 113 | Man recon new T1F CL (60258200) | EACH | 1 | $1,490.00 | $718.72 | $9,500.00 |
| 114 | Inlets adj new T1F OL (60260300) | EACH | 1 | $1,490.00 | $718.72 | $2,500.00 |
| 115 | Valve box adj (60266600) | EACH | 15 | $161.00 | $611.09 | $700.00 |
| 116 | Comb CC&G TB6.18 aep (60604500) | LF | 857 | $66.00 | $65.04 | $45.00 |
| 117 | Conc bar med (60623800) | SF | 168 | $40.00 | $66.08 | $42.00 |
| 118 | Guardrail remov (63200310) | LF | 179 | $9.00 | $9.32 | $19.00 |
| 119 | Non SPL waste disposl (66900200) | CY | 2,231 | $84.00 | $90.69 | $55.00 |
| 120 | SPL waste disposal (66900205) | CY | 1,000 | $85.00 | $90.70 | $100.00 |
| 121 | Soil disposal analy (66900530) | EACH | 3 | $1,560.00 | $1,596.57 | $1,500.00 |
| 122 | Reg sub P-const plan (66901001) | LS | 1 | $4,295.00 | $4,404.34 | $2,600.00 |
| 123 | Reg sub F con report (66901003) | LS | 1 | $2,300.00 | $2,422.39 | $3,200.00 |
| 124 | Reg sub mon (66901006) | CAL DAY | 15 | $1,300.00 | $1,420.40 | $1,350.00 |
| 125 | Mobilization (67100100) | LS | 1 | $468,529 | $308,872 | $660,000 |
| 126 | TR cont surveillance (70103815) | CAL DAY | 187 | $515.00 | $0.01 | $900.00 |
| 127 | Changeable message SN (70107025) | CAL DAY | 1,320 | $37.50 | $38.54 | $35.00 |
| 128 | Temp PVT MK LTR & sym paint (70300211) | SF | 796 | $6.50 | $6.61 | $6.00 |
| 129 | Temp PVT MK line 4 - paint (70300221) | LF | 40,268 | $0.50 | $0.50 | $0.45 |
| 130 | Temp PVT MK line 24 - paint (70300281) | LF | 483 | $3.00 | $3.30 | $3.00 |
| 131 | Sign panel T1 (72000100) | SF | 407 | $62.00 | $50.45 | $50.00 |
| 132 | Remov sign panel T1 (72400310) | SF | 203 | $70.00 | $26.36 | $40.00 |
| 133 | Teles STL sin support (72800100) | LF | 813 | $26.00 | $34.59 | $30.00 |
| 134 | Epoxy PVT MK LTR-sym (78005100) | SF | 1,049 | $10.00 | $8.81 | $8.00 |
| 135 | Epoxy PVT MK line 4 (78005110) | LF | 13,764 | $2.50 | $1.43 | $1.30 |
| 136 | Epoxy PVT MK line 6 (78005130) | LF | 2,321 | $4.00 | $2.20 | $2.00 |
| 137 | Epoxy PVT MK line 8 (78005140) | LF | 3,261 | $5.00 | $2.86 | $2.60 |
| 138 | Epoxy PVT MK line 12 (78005150) | LF | 1,211 | $7.00 | $4.29 | $3.90 |
| 139 | Epoxy PVT MK line 24 (78005180) | LF | 1,212 | $14.50 | $8.81 | $8.00 |
| 140 | GRV RCSD PVT MRKG 5 (78011025) | LF | 13,764 | $1.00 | $1.10 | $1.00 |
| 141 | GRV RCSD PVT MRKG 7 (78011035) | LF | 2,321 | $1.00 | $1.76 | $1.60 |
| 142 | GRV RCSD PVT MRKG 9 (78011045) | LF | 3,261 | $2.00 | $2.20 | $2.00 |
| 143 | GRV RCSD PVT MRKG 13 (78011065) | LF | 1,211 | $2.00 | $5.18 | $4.70 |
| 144 | GRV RCSD PVT MRKG 25 (78011125) | LF | 1,212 | $5.00 | $9.91 | $9.00 |
| 145 | PVT MKG rem WTR blast (78300202) | SF | 4,437 | $4.00 | $4.13 | $3.75 |
| 146 | Elect serv install (80400100) | EACH | 1 | $7,200.00 | $7,384.97 | $6,707.00 |
| 147 | Undrgrd C PVC 2 (81028350) | LF | 6,393 | $16.00 | $16.09 | $14.61 |
| 148 | Undrgrd C PVC 2 1/2 (81028360) | LF | 216 | $19.00 | $19.61 | $17.81 |
| 149 | Undrgrd C PVC 3 (81028370) | LF | 105 | $29.00 | $29.73 | $27.00 |
| 150 | Undrgrd C PVC 4 (81028390) | LF | 600 | $43.00 | $43.76 | $39.74 |
| 151 | Handhole (81400100) | EACH | 10 | $4,020.00 | $4,114.75 | $3,737.00 |
| 152 | DBL handhole (81400300) | EACH | 2 | $6,600.00 | $6,728.73 | $6,111.00 |
| 153 | EC C XLP use 1C 8 (81702120) | LF | 3,570 | $2.00 | $2.16 | $1.96 |
| 154 | Lum LED rdwy D (82110004) | EACH | 4 | $1,100.00 | $1,116.50 | $1,014.00 |
| 155 | Light pole FDN 24D (83600200) | LF | 12 | $385.00 | $393.64 | $357.50 |
| 156 | Rem pole FDN (84200804) | EACH | 4 | $855.00 | $877.29 | $796.75 |
| 157 | Reloc EX LT unit (84400105) | EACH | 2 | $370.00 | $378.78 | $344.00 |
| 158 | RR fac & TY V cab (85700310) | EACH | 2 | $25,450 | $26,087 | $23,692 |
| 159 | Uninter power sup STD (86200200) | EACH | 2 | $9,000.00 | $9,173.14 | $8,331.00 |
| 160 | Elcbl C signal 14 2C (87301215) | LF | 1,489 | $2.00 | $1.82 | $1.65 |
| 161 | Elcbl C signal 14 3C (87301225) | LF | 2,179 | $2.00 | $2.32 | $2.11 |
| 162 | Elcbl C signal 14 5C (87301245) | LF | 2,403 | $3.00 | $3.24 | $2.94 |
| 163 | Elcbl C signal 14 7C (87301255) | LF | 3,192 | $4.00 | $4.02 | $3.65 |
| 164 | Elcbl C railrd 14 3C (87301750) | LF | 582 | $14.00 | $14.36 | $13.04 |
| 165 | Elcbl C serv 6 2C (87301805) | LF | 102 | $6.00 | $5.97 | $5.42 |
| 166 | TS post galvs 12 (87502460) | EACH | 1 | $3,110.00 | $3,186.54 | $2,894.00 |
| 167 | TS post galvs 16 (87502500) | EACH | 6 | $3,400.00 | $3,471.72 | $3,153.00 |
| 168 | S maa & P 24 (87700160) | EACH | 1 | $13,940 | $14,291 | $12,979 |
| 169 | S maa & P 32 (87700200) | EACH | 1 | $15,300 | $15,632 | $14,197 |
| 170 | S maa & P 36 (87700220) | EACH | 1 | $17,900 | $18,302 | $16,622 |
| 171 | S maa & P 42 (87700250) | EACH | 1 | $19,400 | $19,884 | $18,059 |
| 172 | S maa & P 54 (87700310) | EACH | 1 | $25,000 | $25,711 | $23,351 |
| 173 | STL comb maa&P 38 (87702920) | EACH | 1 | $25,000 | $25,561 | $23,214 |
| 174 | STL comb maa&P 42 (87702940) | EACH | 1 | $25,500 | $26,114 | $23,717 |
| 175 | STL comb maa&P 50 (87702980) | EACH | 1 | $30,000 | $30,694 | $27,876 |
| 176 | STL comb maa&P 54 (87702990) | EACH | 1 | $30,000 | $31,000 | $28,154 |
| 177 | Conc FDN TY A (87800100) | LF | 44 | $292.00 | $299.67 | $272.16 |
| 178 | Conc FDN TY C (87800150) | LF | 8 | $1,010.00 | $1,036.12 | $941.00 |
| 179 | Conc FDN TY E 30D (87800400) | LF | 10 | $335.00 | $343.54 | $312.00 |
| 180 | Conc FDN TY E 36D (87800415) | LF | 104 | $533.00 | $546.14 | $496.00 |
| 181 | SH LED 1F 3S mam (88030020) | EACH | 11 | $993.00 | $1,018.50 | $925.00 |
| 182 | SH LED 1F 3S BM (88030050) | EACH | 2 | $1,000.00 | $1,024.01 | $930.00 |
| 183 | SH LED 1F 4S BM (88030070) | EACH | 3 | $1,130.00 | $1,156.14 | $1,050.00 |
| 184 | SH LED 1F 4S mam (88030080) | EACH | 3 | $1,250.00 | $1,282.76 | $1,165.00 |
| 185 | SH LED 1F 5S BM (88030100) | EACH | 6 | $1,300.00 | $1,355.44 | $1,231.00 |
| 186 | SH LED 1F 5S mam (88030110) | EACH | 6 | $1,400.00 | $1,453.43 | $1,320.00 |
| 187 | TS backplate (88200100) | EACH | 31 | $311.00 | $319.31 | $290.00 |
| 188 | Temp TR sig install (89000100) | EACH | 2 | $105,000 | $107,383 | $97,525 |
| 189 | Illum sign LED (89100400) | EACH | 4 | $5,700.00 | $5,866.85 | $5,328.25 |
| 190 | Remov EX TS equip (89502375) | EACH | 2 | $11,500 | $11,729 | $10,652 |
| 191 | Remov EX handhole (89502380) | EACH | 13 | $1,470.00 | $1,505.18 | $1,367.00 |
| 192 | Remov EX DBL handhole (89502382) | EACH | 2 | $1,670.00 | $1,716.04 | $1,558.50 |
| 193 | Remov EX conc FDN (89502385) | EACH | 12 | $1,950.00 | $1,996.27 | $500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.