Centennial Contractors of the Quad Cities, Inc.: IDOT bid record
Centennial Contractors of the Quad Cities, Inc. submitted 19 bids on Illinois DOT contracts in the data, from 19 JAN 2024 to 12 JUN 2026, and was the low bidder on 4 of them (21%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $2,104,899
- Latest bid
- 12 JUN 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 6 | 1 | 17% |
| 2025 | 9 | 2 | 22% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 02 | 13 | 3 | 23% |
| District 04 | 6 | 1 | 17% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Sidewalk rem | 44000600 | SF | 14 | 7 (50%) | $2.00 | $3.00 |
| Pavement rem | 44000100 | SY | 11 | 6 (55%) | $18.00 | $20.30 |
| Drive pavement rem | 44000200 | SY | 13 | 5 (38%) | $18.00 | $20.00 |
| Tie bars 3/4 | 44213204 | EACH | 5 | 5 (100%) | $12.00 | $17.00 |
| Comb curb gutter rem | 44000500 | LF | 12 | 4 (33%) | $15.00 | $11.61 |
| PCC driveway pavt 6 | 42300200 | SY | 7 | 4 (57%) | $90.00 | $100.00 |
| Agg base cse B 6 | 35101800 | SY | 5 | 4 (80%) | $14.00 | $14.50 |
| Detectable warnings | 42400800 | SF | 14 | 3 (21%) | $50.00 | $37.00 |
| Earth excavation | 20200100 | CY | 9 | 3 (33%) | $38.50 | $48.00 |
| Perimeter eros bar | 28000400 | LF | 8 | 3 (38%) | $3.00 | $3.50 |
| Saw cuts | 44213200 | LF | 6 | 3 (50%) | $1.12 | $5.00 |
| TR cont surveillance | 70103815 | CAL DAY | 5 | 3 (60%) | $500.00 | $102.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Brandt Construction Co. | 16 | 3 of 16 |
| McCarthy Improvement Company | 11 | 5 of 11 |
| Phoenix Corporation of the Quad Cities | 10 | 5 of 10 |
| Valley Construction Co. | 9 | 3 of 9 |
| Langman Construction, Inc. | 6 | 1 of 6 |
| G. M. Sipes Construction, Inc. | 5 | 4 of 5 |
| Fischer Excavating, Inc. | 3 | 1 of 3 |
| Kinney Contractors, Inc. | 3 | 0 of 3 |
| J.C. Dillon, Inc. | 2 | 1 of 2 |
| Gunther Construction, a div of UCM, Inc. | 2 | 0 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 JUN 2026 | 85794 | District 02 | City Of Rock Island, section 22-00209-00-SW | 1 of 5 | $609,125 | Low, 15% under the second |
| 12 JUN 2026 | 89864 | District 04 | Aledo, section 24-00051-00-SW | 2 of 4 | $182,213 | +1.0% |
| 16 JAN 2026 | 64U81 | District 02 | Section (2-1A)PP | 2 of 3 | $873,249 | +12% |
| 16 JAN 2026 | 64U83 | District 02 | Section (112Y-1)PP&SR | 2 of 3 | $968,506 | +41% |
| 07 NOV 2025 | 85783 | District 02 | Kewanee, section 22-00111-00-SW | 6 of 8 | $740,278 | +38% |
| 07 NOV 2025 | 85785 | District 02 | Moline, section 23-00291-00-BT | 3 of 6 | $5,438,044 | +7.0% |
| 19 SEP 2025 | 85782 | District 02 | Moline, section 22-00288-00-SW | 1 of 6 | $445,774 | Low, 3.0% under the second |
| 13 JUN 2025 | 89866 | District 04 | Galesburg, section 24-02201-35-SW | 2 of 5 | $320,840 | +6.0% |
| 25 APR 2025 | 89868 | District 04 | Aledo, section 23-00049-00-BT | 4 of 8 | $1,104,564 | +20% |
| 07 MAR 2025 | 85765 | District 02 | Silvis, section 20-00052-00-BT | 2 of 8 | $1,362,876 | +18% |
| 17 JAN 2025 | 64T80 | District 02 | Section (161-I-2)PP-2 | 1 of 3 | $642,392 | Low, 1.0% under the second |
| 17 JAN 2025 | 85767 | District 02 | East Moline, section 22-00159-00-PV | 4 of 5 | $1,034,880 | +24% |
| 17 JAN 2025 | 85772 | District 02 | Moline, section 21-00287-00-RS | 2 of 4 | $1,578,832 | +1.0% |
| 14 JUN 2024 | 64T24 | District 02 | Section (161-1-1)PP | 2 of 3 | $493,811 | +6.0% |
| 14 JUN 2024 | 85751 | District 02 | Moline, section 14-00267-00-BT | 5 of 7 | $457,262 | +22% |
| 14 JUN 2024 | 89845 | District 04 | Galesburg, section 22-02201-33-SW | 1 of 5 | $407,609 | Low, 21% under the second |
| 14 JUN 2024 | 89851 | District 04 | Aledo, section 22-00048-00-SW | 3 of 5 | $401,150 | +7.0% |
| 26 APR 2024 | 64S95 | District 02 | Section (37-2-1,37-2,37-3)PP-2023 | 2 of 4 | $609,947 | +10% |
| 19 JAN 2024 | 89828 | District 04 | Aledo, section 22-00044-00-BT | 2 of 6 | $527,495 | +9.0% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.