IDOT contract 89866 bid tabulation
Galesburg, section 24-02201-35-SW. Let by Illinois DOT on June 13, 2025, Knox, District 04. 5 bids received; low bid $302,246 by Illinois Civil Contractors, Inc..
- Owner
- Illinois DOT
- Letting
- 13 JUN 2025
- Pay items
- 23
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Illinois Civil Contractors, Inc. | $302,246 | Low |
| 2 | Centennial Contractors of the Quad Cities, Inc. | $320,840 | +6.0% |
| 3 | Brandt Construction Co. | $385,000 | +27% |
| 4 | Phoenix Corporation of the Quad Cities | $423,731 | +40% |
| 5 | Gunther Construction, a div of UCM, Inc. | $424,278 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Illinois Civil Contractors, Inc. | 2. Centennial Contractors of the Quad Cities, Inc. | 3. Brandt Construction Co. | 4. Phoenix Corporation of the Quad Cities | 5. Gunther Construction, a div of UCM, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Constructn layout SPL (X0320050) | LS | 1 | $11,616 | $8,500.00 | $8,500.00 | $10,750 | $12,600 |
| 2 | Landscaping, special (X0327618) | LS | 1 | $11,063 | $25,000 | $33,000 | $10,000 | $12,000 |
| 3 | Brick sidewalk rem (X4400060) | SF | 114 | $4.14 | $3.00 | $7.00 | $16.25 | $3.77 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $5,894.83 | $20,000 | $5,500.00 | $10,900 | $11,800 |
| 5 | Agg base cse B 2 (35101582) | SY | 1,102 | $9.70 | $7.00 | $35.00 | $25.00 | $45.82 |
| 6 | Agg base cse B 6 (35101800) | SY | 172 | $23.82 | $16.00 | $55.00 | $31.00 | $68.64 |
| 7 | PCC bse cse 6 (35300100) | SY | 106 | $105.38 | $100.00 | $117.00 | $250.00 | $165.75 |
| 8 | P HMA BC HM N50 (40600905) | TON | 9 | $1,327.54 | $800.00 | $665.00 | $1,075.00 | $852.80 |
| 9 | P HMA SC "D" N50 (40603535) | TON | 9 | $1,327.54 | $800.00 | $665.00 | $1,075.00 | $852.80 |
| 10 | PC conc sidewalk 4 (42400100) | SF | 7,979 | $11.16 | $12.00 | $12.50 | $13.00 | $12.34 |
| 11 | PC conc sidewalk 6 (42400300) | SF | 1,245 | $12.86 | $16.00 | $20.00 | $21.50 | $14.73 |
| 12 | PC conc sidewalk 8 (42400410) | SF | 753 | $14.49 | $20.00 | $38.00 | $39.50 | $60.10 |
| 13 | Detectable warnings (42400800) | SF | 260 | $37.45 | $50.00 | $43.00 | $58.00 | $30.59 |
| 14 | Pavement rem (44000100) | SY | 103 | $18.57 | $17.00 | $45.00 | $112.00 | $74.44 |
| 15 | Drive pavement rem (44000200) | SY | 113 | $22.97 | $17.00 | $45.00 | $38.00 | $59.83 |
| 16 | Comb curb gutter rem (44000500) | LF | 361 | $20.10 | $17.00 | $30.00 | $41.50 | $31.31 |
| 17 | Sidewalk rem (44000600) | SF | 1,342 | $4.30 | $2.50 | $5.00 | $7.00 | $3.77 |
| 18 | Man adjust (60255500) | EACH | 1 | $2,002.38 | $5,000.00 | $1,900.00 | $2,400.00 | $1,520.83 |
| 19 | Inlets adjust (60260100) | EACH | 2 | $1,731.04 | $1,500.00 | $1,900.00 | $2,025.00 | $2,601.24 |
| 20 | Inlets adj new T3F&G (60260500) | EACH | 5 | $2,480.89 | $3,200.00 | $2,800.00 | $2,575.00 | $2,601.56 |
| 21 | Comb CC&G TB6.18 aep (60604500) | LF | 426 | $95.16 | $60.00 | $75.00 | $88.00 | $115.05 |
| 22 | Mobilization (67100100) | LS | 1 | $18,135 | $23,000 | $16,883 | $35,000 | $17,696 |
| 23 | Paint PVT MK line 12 (78001150) | LF | 208 | $17.15 | $10.00 | $22.00 | $20.00 | $24.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 13, 2025. Compiled by Mirage Metrics.