Gunther Construction, a div of UCM, Inc.: IDOT bid record

Gunther Construction, a div of UCM, Inc. submitted 38 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 31 JUL 2026, and was the low bidder on 28 of them (74%). When it was not low, its total sat a median +24% above the low bid.

Owner
Illinois DOT
Low bid volume
$172,686,654
Latest bid
31 JUL 2026
Data through
18 SEP 2026
38Bids
28Low bids
74Win rate, percent
+24%Median gap to the low bid when not low, 10 bids

By year

YearBidsLow bidsWin rate
20217686%
20228563%
202344100%
20244250%
20259778%
20266467%
Gunther Construction, a div of UCM, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 04372773%
District 0211100%
Gunther Construction, a div of UCM, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Changeable message SN70107025CAL DAY119 (82%)$110.00$55.00
Part depth patch SPLX0556100SY76 (86%)$50.77$65.00
Partial depth patchX4421000TON105 (50%)$488.23$417.71
Man adjust60255500EACH75 (71%)$1,574.27$725.00
Detectable warnings42400800SF53 (60%)$33.44$37.00
Comb curb gutter rem44000500LF62 (33%)$37.62$11.61
Drive pavement rem44000200SY62 (33%)$45.74$20.00
PC conc sidewalk 442400100SF62 (33%)$17.07$12.47
Raised ref PVT MK rem78300200EACH52 (40%)$62.29$15.00
Pavement rem44000100SY71 (14%)$40.19$20.30
Sidewalk rem44000600SF61 (17%)$4.16$3.00
Short term pavt mking70300100LF51 (20%)$3.81$1.01
Gunther Construction, a div of UCM, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Gunther Construction, a div of UCM, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202668L03District 04Section 22PP2 of 2$660,905+5.0%
12 JUN 202668J50District 04Section 4RS-62 of 2$1,927,448+19%
12 JUN 202668K19District 04Section 32RS-101 of 1$4,415,604Low
12 JUN 202668K21District 04Section 35RS-51 of 2$1,549,883Low, 24% under the second
24 APR 202668K23District 04Section 22RS-21 of 1$11,296,811Low
27 FEB 202668F91District 04Section (12RS-4,11RS-2)1 of 1$11,748,219Low
07 NOV 202568B60District 041 of 1$35,946,274Low
13 JUN 202589806District 04Project Number: A8Q5-432 / /, section 20-00059-02-RS1 of 2$1,710,475Low, 10% under the second
13 JUN 202589866District 04Galesburg, section 24-02201-35-SW5 of 5$424,278+40%
25 APR 202568F43District 02Section 4RS-51 of 1$9,337,044Low
25 APR 202568G11District 04Section 113RS-4;115RS-51 of 1$6,192,933Low
25 APR 202568H42District 04Section 101RS-5;(102X)RS-2;(102-B)BRR1 of 1$6,563,945Low
25 APR 202568J21District 04Section 35RS-5;36RS-4;139RS-71 of 1$12,640,388Low
25 APR 202589780District 04Monmouth, section 17-00081-01-RP3 of 3$3,995,905+40%
07 MAR 202568E50District 04Section 110RS-5;(111,112,108X-1)W,RS-31 of 1$29,190,217Low
14 JUN 202489845District 04Galesburg, section 22-02201-33-SW3 of 5$499,401+23%
26 APR 202489827District 04Galesburg, section 21-00700-13-RS1 of 2$1,097,188Low, 1.0% under the second
19 JAN 202489809District 04Macomb, section 19-00155-00-PV1 of 1$6,189,408Low
19 JAN 202489829District 04Macomb, section 21-00151-00-SW2 of 2$1,726,295+25%
16 JUN 202368H03District 04Section (55-1)RS-1;31RS-3;24RS-51 of 1$359,699Low
16 JUN 202368H62District 04Section 111-PP1 of 2$118,583Low, 38% under the second
16 JUN 202368H65District 04Section 38-PP1 of 2$152,618Low, 39% under the second
16 JUN 202368H69District 04Section (106,108)I;(107)I-11 of 2$252,522Low, 24% under the second
23 SEP 202268H08District 04Section D42 of 4$471,085+8.0%
17 JUN 202268G92District 04Section (21,22)PP1 of 2$208,605Low, 14% under the second
Gunther Construction, a div of UCM, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy