IDOT contract 68F91 bid tabulation
Section (12RS-4,11RS-2). Let by Illinois DOT on February 27, 2026, Fulton, District 04. 1 bid received; low bid $11,748,219 by Gunther Construction, a div of UCM, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 121
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gunther Construction, a div of UCM, Inc. | $11,748,219 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gunther Construction, a div of UCM, Inc. |
|---|---|---|---|---|
| 1 | Constr sta layout (XZ013798) | LS | 1 | $9,046.36 |
| 2 | Brick paver removal (X1700112) | SF | 395 | $8.80 |
| 3 | Exc & GR EX SHLD SPL (X2020060) | UNIT | 637 | $1,055.09 |
| 4 | Grad & shap ditch SPL (X2020114) | LF | 21,550 | $22.28 |
| 5 | HMA surf rem SPL (X4400196) | SY | 1,843 | $61.66 |
| 6 | Partial depth patch (X4421000) | TON | 224 | $810.53 |
| 7 | Part depth patch SPL (X4421002) | SY | 2,000 | $65.42 |
| 8 | Headwall removal (X5012652) | EACH | 5 | $1,342.00 |
| 9 | Remov EX flar end sec (X5427602) | EACH | 2 | $1,120.90 |
| 10 | Cur-in-PL pipe LNR 12 (X5430212) | LF | 94 | $463.84 |
| 11 | SS DI T1 10 (X5504010) | LF | 144 | $192.50 |
| 12 | SS D I T1 12 (X5504013) | LF | 37 | $264.00 |
| 13 | San man FR & cover (X6026053) | EACH | 2 | $935.00 |
| 14 | Class SI conc out SPL (X6060097) | CY | 105 | $1,264.48 |
| 15 | Conc gutter TA SPL (X6062700) | LF | 3,919 | $86.06 |
| 16 | Linear delin panels 4 (X6350204) | EACH | 15 | $96.80 |
| 17 | Rumble strip (X6420108) | SF | 825 | $37.37 |
| 18 | GDRL agg eros cont (Z0001002) | TON | 40 | $16.50 |
| 19 | Construction layout (Z0013798) | LS | 1 | $127,301 |
| 20 | SS 1 wat MN 8 (Z0056644) | LF | 68 | $206.80 |
| 21 | Trainees (Z0076600) | HR | 5,000 | $0.80 |
| 22 | Trainees TPG (Z0076604) | HR | 5,000 | $15.00 |
| 23 | Earth excavation (20200100) | CY | 1,525 | $49.50 |
| 24 | Trench backfill (20800150) | CY | 66 | $104.50 |
| 25 | Topsoil F & P 4 (21101615) | SY | 5,967 | $7.15 |
| 26 | Explor trench 48 (21301048) | LF | 500 | $19.80 |
| 27 | Seeding CL 2A (25000210) | ACRE | 5.25 | $1,650.00 |
| 28 | Nitrogen fert nutr (25000400) | LB | 453 | $2.20 |
| 29 | Phosphorus fert nutr (25000500) | LB | 453 | $2.20 |
| 30 | Potassium fert nutr (25000600) | LB | 453 | $2.20 |
| 31 | Mowing (25000750) | ACRE | 5.25 | $550.00 |
| 32 | Erosion contr blanket (25100630) | SY | 24,315 | $1.72 |
| 33 | Temp ditch checks (28000305) | LF | 5,624 | $45.93 |
| 34 | Perimeter eros bar (28000400) | LF | 14,098 | $5.79 |
| 35 | Inlet & pipe protect (28000500) | EACH | 2 | $1,112.96 |
| 36 | Inlet filters (28000510) | EACH | 4 | $551.38 |
| 37 | Stone riprap CL B3 (28100225) | TON | 359 | $124.30 |
| 38 | Agg surf course TY B (40200800) | TON | 117 | $101.20 |
| 39 | P bit matls tack CT (40600295) | LB | 152,936 | $0.90 |
| 40 | Matl transfer device (40600405) | TON | 21,787 | $4.67 |
| 41 | HMA surf rem butt JT (40600982) | SY | 3,012 | $59.22 |
| 42 | Temporary ramp (40600990) | SY | 428 | $23.41 |
| 43 | P HMA BC IL-9.5 N50 (40603205) | TON | 9,757 | $177.65 |
| 44 | P HMA SC IL-9.5 D N50 (40604160) | TON | 12,030 | $181.84 |
| 45 | Incidental HMA surf (40800050) | TON | 397 | $700.45 |
| 46 | PCC driveway pavt 8 (42300400) | SY | 85 | $227.70 |
| 47 | PC conc sidewalk 4 (42400100) | SF | 1,052 | $27.50 |
| 48 | Detectable warnings (42400800) | SF | 175 | $49.50 |
| 49 | HMA surf rem 1 (44000153) | SY | 76,348 | $4.38 |
| 50 | HMA surf rem 2 (44000157) | SY | 14,834 | $4.70 |
| 51 | Drive pavement rem (44000200) | SY | 331 | $30.80 |
| 52 | Gutter rem (44000400) | LF | 589 | $27.50 |
| 53 | Comb curb gutter rem (44000500) | LF | 130 | $58.30 |
| 54 | Sidewalk rem (44000600) | SF | 1,086 | $8.80 |
| 55 | CL D patch T2 12 (44201789) | SY | 253 | $349.05 |
| 56 | CL D patch T3 12 (44201794) | SY | 44 | $327.05 |
| 57 | CL D patch T4 12 (44201796) | SY | 1,586 | $305.05 |
| 58 | Agg wedge SHLD type B (48102100) | TON | 673 | $101.81 |
| 59 | HMA shoulders 4 (48203013) | SY | 842 | $141.10 |
| 60 | HMA shoulders 4 1/4 (48203014) | SY | 21,117 | $60.07 |
| 61 | HMA shoulders 6 (48203021) | SY | 588 | $150.70 |
| 62 | Pipe culvert remov (50105220) | LF | 265 | $60.50 |
| 63 | P cul CL A 1 12 (542A0217) | LF | 78 | $191.40 |
| 64 | P cul CL A 1 15 (542A0220) | LF | 28 | $247.50 |
| 65 | P cul CL A 1 eqrs 24 (542A5479) | LF | 67 | $347.60 |
| 66 | P cul CL C 1 12 (542C0217) | LF | 132 | $157.30 |
| 67 | PRC flar end sec 12 (54213657) | EACH | 2 | $2,559.70 |
| 68 | PRC flar end sec 15 (54213660) | EACH | 2 | $2,780.80 |
| 69 | PRC flar end sec 21 (54213666) | EACH | 1 | $3,245.00 |
| 70 | PRCF end S EL eqrs 24 (54214719) | EACH | 4 | $3,850.00 |
| 71 | Metal FL end sec 10" (54262710) | EACH | 1 | $770.00 |
| 72 | Metal FL end sec 12" (54262712) | EACH | 5 | $781.00 |
| 73 | Storm sew CL A 2 21 (550A0400) | LF | 8 | $360.80 |
| 74 | Storm sewer rem 8 (55100300) | LF | 56 | $44.00 |
| 75 | Storm sewer rem 21 (55101100) | LF | 4 | $88.00 |
| 76 | Man TA 4 dia T1F CL (60218400) | EACH | 1 | $7,480.00 |
| 77 | Inlets TA T8G (60236200) | EACH | 2 | $3,630.00 |
| 78 | Inlets TA T24F&G (60237470) | EACH | 2 | $3,872.00 |
| 79 | Remov inlets (60500060) | EACH | 2 | $605.00 |
| 80 | Comb CC&G TB6.12 (60603800) | LF | 163 | $122.10 |
| 81 | Pipe culv cleaned 10 (60920010) | LF | 129 | $51.70 |
| 82 | Pipe culv cleaned 12 (60920012) | LF | 217 | $38.50 |
| 83 | Pipe culv cleaned 15 (60920015) | LF | 189 | $41.80 |
| 84 | Pipe culv cleaned 18 (60920018) | LF | 31 | $67.10 |
| 85 | SPBGR TY A 6FT posts (63000001) | LF | 250 | $53.90 |
| 86 | SPBGR TY A 9FT posts (63000003) | LF | 150 | $53.90 |
| 87 | LSG OV cul 12'6" span (63000350) | LF | 100 | $57.20 |
| 88 | TR bar TRM T1 SPL tan (63100167) | EACH | 6 | $4,620.00 |
| 89 | Guardrail remov (63200310) | LF | 601 | $14.87 |
| 90 | Shoulder rum strip 8 (64200108) | LF | 37,589 | $0.60 |
| 91 | Sinusoidal rum STP 14 (64200214) | LF | 22,955 | $0.65 |
| 92 | Engr field office A (67000400) | CAL MO | 12 | $3,918.66 |
| 93 | Mobilization (67100100) | LS | 1 | $612,115 |
| 94 | Traf cont-prot 701201 (70100450) | LS | 1 | $57,452 |
| 95 | Traf cont-prot 701306 (70100460) | LS | 1 | $53,718 |
| 96 | Traf cont-prot 701326 (70100500) | LS | 1 | $93,267 |
| 97 | Traf cont-prot 701336 (70100600) | LS | 1 | $57,052 |
| 98 | TR cont & prot 701501 (70102620) | LS | 1 | $15,785 |
| 99 | TR cont & prot 701801 (70102640) | LS | 1 | $6,155.43 |
| 100 | TR cont surveillance (70103815) | CAL DAY | 5 | $2,098.80 |
| 101 | Changeable message SN (70107025) | CAL DAY | 21 | $176.00 |
| 102 | Short term pavt mking (70300100) | LF | 14,434 | $3.25 |
| 103 | SHRT TRM pavt MK rem (70300150) | SF | 4,812 | $0.01 |
| 104 | Sign panel T1 (72000100) | SF | 45 | $65.05 |
| 105 | Terminal marker - DA (72501000) | EACH | 6 | $16.50 |
| 106 | Teles STL sin support (72800100) | LF | 74 | $34.88 |
| 107 | Base tel STL sin supp (73100100) | EACH | 4 | $1,039.54 |
| 108 | Mod ureth PM LTR-sym (78009000) | SF | 73 | $8.80 |
| 109 | Mod ureth PM line 4 (78009004) | LF | 37,606 | $0.66 |
| 110 | Mod ureth PM line 6 (78009006) | LF | 66,524 | $0.77 |
| 111 | Mod ureth PM line 8 (78009008) | LF | 282 | $1.98 |
| 112 | Mod ureth PM line 12 (78009012) | LF | 624 | $4.35 |
| 113 | Mod ureth PM line 24 (78009024) | LF | 151 | $7.59 |
| 114 | GRV RCSD PM LTR & sym (78011000) | SF | 73 | $3.30 |
| 115 | GRV RCSD PVT MRKG 5 (78011025) | LF | 37,606 | $0.61 |
| 116 | GRV RCSD PVT MRKG 7 (78011035) | LF | 66,524 | $0.72 |
| 117 | GRV RCSD PVT MRKG 9 (78011045) | LF | 249 | $1.49 |
| 118 | GRV RCSD PVT MRKG 13 (78011065) | LF | 624 | $2.09 |
| 119 | GRV RCSD PVT MRKG 25 (78011125) | LF | 55 | $3.69 |
| 120 | Raised refl pavt MKR (78100100) | EACH | 500 | $49.50 |
| 121 | Raised ref PVT MK rem (78300200) | EACH | 40 | $95.40 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.