Knapp Concrete Contractors, Inc.: IDOT bid record
Knapp Concrete Contractors, Inc. submitted 19 bids on Illinois DOT contracts in the data, from 05 MAR 2021 to 18 SEP 2026, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +27% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $796,421
- Latest bid
- 18 SEP 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 4 | 1 | 25% |
| 2022 | 2 | 0 | 0% |
| 2023 | 3 | 1 | 33% |
| 2024 | 4 | 0 | 0% |
| 2025 | 4 | 0 | 0% |
| 2026 | 2 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 04 | 15 | 2 | 13% |
| District 03 | 2 | 0 | 0% |
| District 06 | 1 | 0 | 0% |
| District 02 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Earth excavation | 20200100 | CY | 15 | 6 (40%) | $47.00 | $48.00 |
| Comb curb gutter rem | 44000500 | LF | 9 | 4 (44%) | $14.95 | $11.61 |
| Comb CC&G TB6.12 | 60603800 | LF | 8 | 3 (38%) | $66.00 | $42.50 |
| Perimeter eros bar | 28000400 | LF | 13 | 2 (15%) | $5.00 | $3.50 |
| Nitrogen fert nutr | 25000400 | LB | 8 | 2 (25%) | $4.15 | $3.00 |
| Potassium fert nutr | 25000600 | LB | 8 | 2 (25%) | $4.15 | $3.00 |
| Phosphorus fert nutr | 25000500 | LB | 8 | 2 (25%) | $4.15 | $3.00 |
| Pavement rem | 44000100 | SY | 10 | 1 (10%) | $23.00 | $20.30 |
| Temp eros contr seed | 28000250 | LB | 8 | 1 (13%) | $15.66 | $5.00 |
| Drive pavement rem | 44000200 | SY | 7 | 1 (14%) | $24.20 | $20.00 |
| Filter fabric | 28200200 | SY | 7 | 1 (14%) | $6.47 | $4.65 |
| PCC driveway pavt 6 | 42300200 | SY | 6 | 1 (17%) | $98.50 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Otto Baum Company, Inc. | 13 | 9 of 13 |
| Illinois Civil Contractors, Inc. | 11 | 6 of 11 |
| Stark Excavating, Inc. | 9 | 5 of 9 |
| R. A. Cullinan and Son, a div of UCM, Inc. | 7 | 4 of 7 |
| Gensini Excavating, Inc. | 6 | 5 of 6 |
| Phoenix Corporation of the Quad Cities | 5 | 4 of 5 |
| White Construction LLC | 2 | 1 of 2 |
| Stenstrom Excavation & Blacktop, Inc. | 2 | 1 of 2 |
| McCarthy Improvement Company | 2 | 0 of 2 |
| Centennial Contractors of the Quad Cities, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 18 SEP 2026 | 68H60 | District 04 | Section (35)N-2 | 3 of 4 | $801,370 | +23% |
| 16 JAN 2026 | 89873 | District 04 | Project Number: Qf4C-244 / /, section 22-00112-00-BR | 4 of 4 | $997,319 | +11% |
| 07 NOV 2025 | 85783 | District 02 | Kewanee, section 22-00111-00-SW | 2 of 8 | $598,981 | +12% |
| 07 NOV 2025 | 87884 | District 03 | Dwight, section 24-00056-00-SW | 6 of 6 | $383,643 | +66% |
| 19 SEP 2025 | 87871 | District 03 | Oglesby, section 22-00042-00-SW | 5 of 7 | $436,056 | +54% |
| 25 APR 2025 | 89852 | District 04 | City Of Washington, section 22-00130-00-SW | 4 of 4 | $1,007,424 | +27% |
| 02 AUG 2024 | 89861 | District 04 | Creve Coeur, section 22-00049-00-SW | 5 of 5 | $181,875 | +32% |
| 14 JUN 2024 | 89845 | District 04 | Galesburg, section 22-02201-33-SW | 5 of 5 | $594,276 | +46% |
| 26 APR 2024 | 68H85 | District 04 | Section 48-CLV-1 | 3 of 3 | $388,076 | +20% |
| 26 APR 2024 | 68H86 | District 04 | Section (103,48)PP,DR | 2 of 3 | $911,744 | +9.0% |
| 04 AUG 2023 | 89849 | District 04 | City Of Washington, section 23-00113-00-SP | 4 of 4 | $8,268,660 | +21% |
| 16 JUN 2023 | 68H66 | District 04 | Section D4 | 2 of 6 | $400,058 | +27% |
| 16 JUN 2023 | 68H67 | District 04 | Section D4 | 1 of 5 | $408,258 | Low, 6.0% under the second |
| 18 NOV 2022 | 68E32 | District 04 | Section (116-A)CLV | 3 of 5 | $696,851 | +112% |
| 21 JAN 2022 | MA032 | District 04 | Section MARSHALL | 8 of 8 | $1,026,074 | +42% |
| 17 SEP 2021 | 89725 | District 04 | City Of Washington, section 17-00120-00-BT | 1 of 8 | $388,163 | Low, 15% under the second |
| 11 JUN 2021 | 68E82 | District 04 | Section 13-SW | 4 of 4 | $281,084 | +35% |
| 11 JUN 2021 | 89785 | District 04 | City Of Peoria, section 19-00384-00-SW | 2 of 3 | $128,161 | +17% |
| 05 MAR 2021 | 72999 | District 06 | Section 102B-2 | 7 of 7 | $1,011,821 | +62% |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.