IDOT contract 87884 bid tabulation
Dwight, section 24-00056-00-SW. Let by Illinois DOT on November 7, 2025, Livingston, District 03. 6 bids received; low bid $230,453 by D. Construction, Inc..
- Owner
- Illinois DOT
- Letting
- 07 NOV 2025
- Pay items
- 16
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | D. Construction, Inc. | $230,453 | Low |
| 2 | Phoenix Corporation of the Quad Cities | $273,187 | +19% |
| 3 | Davis Concrete Construction Co. | $279,243 | +21% |
| 4 | Gensini Excavating, Inc. | $283,380 | +23% |
| 5 | Tobey's Construction & Cartage, Inc. | $309,163 | +34% |
| 6 | Knapp Concrete Contractors, Inc. | $383,643 | +66% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. D. Construction, Inc. | 2. Phoenix Corporation of the Quad Cities | 3. Davis Concrete Construction Co. | 4. Gensini Excavating, Inc. | 5. Tobey's Construction & Cartage, Inc. | 6. Knapp Concrete Contractors, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Structure adj (X0326862) | EACH | 8 | $750.00 | $1,335.00 | $550.00 | $500.00 | $375.00 | $1,920.00 |
| 2 | Construction layout (Z0013798) | LS | 1 | $10,000 | $5,000.00 | $5,880.00 | $15,000 | $8,500.00 | $16,500 |
| 3 | Drain util STR recon (Z0017700) | EACH | 2 | $2,000.00 | $1,875.00 | $2,000.00 | $1,500.00 | $1,050.00 | $3,000.00 |
| 4 | Inlet filters (28000510) | EACH | 18 | $275.00 | $400.00 | $25.00 | $250.00 | $1.00 | $400.00 |
| 5 | PCC driveway pavt 6 (42300200) | SY | 353 | $80.00 | $125.00 | $87.00 | $120.00 | $101.00 | $108.00 |
| 6 | PC conc sidewalk 4 (42400100) | SF | 13,213 | $10.00 | $10.25 | $13.95 | $12.00 | $15.75 | $15.60 |
| 7 | Detectable warnings (42400800) | SF | 81 | $40.00 | $45.00 | $24.00 | $30.00 | $19.00 | $34.00 |
| 8 | Drive pavement rem (44000200) | SY | 566 | $12.50 | $19.00 | $18.00 | $15.00 | $17.50 | $24.00 |
| 9 | Comb curb gutter rem (44000500) | LF | 47 | $12.00 | $35.00 | $20.00 | $10.00 | $42.00 | $16.80 |
| 10 | Sidewalk rem (44000600) | SF | 1,481 | $3.00 | $3.00 | $4.00 | $2.00 | $2.75 | $2.40 |
| 11 | Comb CC&G TB6.12 (60603800) | LF | 47 | $55.00 | $98.00 | $55.00 | $100.00 | $235.00 | $96.00 |
| 12 | Mobilization (67100100) | LS | 1 | $12,000 | $32,150 | $18,500 | $20,000 | $18,500 | $24,000 |
| 13 | TR cont & prot 701501 (70102620) | LS | 1 | $10,000 | $1,800.00 | $250.00 | $10,000 | $1.00 | $33,000 |
| 14 | TR cont & prot 701801 (70102640) | LS | 1 | $0.01 | $1,600.00 | $4,400.00 | $0.01 | $1.00 | $4,950.00 |
| 15 | THPL PVT MK line 6 (78000400) | LF | 415 | $4.29 | $3.05 | $3.90 | $4.00 | $3.90 | $3.41 |
| 16 | THPL PVT MK line 12 (78000600) | LF | 404 | $8.53 | $12.60 | $7.75 | $13.00 | $7.75 | $14.30 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of November 7, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.