Tobey's Construction & Cartage, Inc.: IDOT bid record

Tobey's Construction & Cartage, Inc. submitted 53 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 25 of them (47%). When it was not low, its total sat a median +13% above the low bid.

Owner
Illinois DOT
Low bid volume
$18,101,004
Latest bid
31 JUL 2026
Data through
18 SEP 2026
53Bids
25Low bids
47Win rate, percent
+13%Median gap to the low bid when not low, 28 bids

By year

YearBidsLow bidsWin rate
20217343%
20226350%
20238563%
202414857%
202512542%
20266117%
Tobey's Construction & Cartage, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 03512549%
District 01100%
District 05100%
Tobey's Construction & Cartage, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB3427 (79%)$0.01$0.01
Terminal marker - DA72501000EACH2721 (78%)$47.50$47.85
Earth excavation20200100CY3420 (59%)$39.00$48.00
Name plates51500100EACH3218 (56%)$500.00$773.24
Driving piles51202305LF1818 (100%)$0.01$0.10
Rem exist struct50100100EACH2616 (62%)$27,575$50,000
TR bar TRM T1 SPL tan63100167EACH2216 (73%)$3,752.50$3,800.00
Bit matls PR CT40600275LB2216 (73%)$0.01$0.01
Filter fabric28200200SY1714 (82%)$2.00$4.65
Grdrail ref type A78200005EACH1713 (76%)$12.00$11.00
Reinf bars, epoxy CTD50800205LB3012 (40%)$2.00$2.50
Nitrogen fert nutr25000400LB1912 (63%)$3.00$3.00
Tobey's Construction & Cartage, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Tobey's Construction & Cartage, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202666N23District 03Section (112)CR-25482 of 3$643,347+5.0%
12 JUN 202666M92District 03Section ((125)CR-2588,CR-2589)5 of 5$1,017,028+44%
12 JUN 202687851District 03Project Number: 7M6S-350 / /, section 23-00306-00-BR3 of 3$1,429,353+17%
24 APR 202666R66District 03Section (109BR)BRR2 of 2$560,096+16%
24 APR 202666R68District 03Section (7BR-1)BRR1 of 1$591,428Low
16 JAN 202666R58District 03Section (112X)CLV-22 of 4$692,947+1.0%
07 NOV 202587884District 03Dwight, section 24-00056-00-SW5 of 6$309,163+34%
07 NOV 202587890District 03Project Number: Hb68-016 / /, section 21-00145-00-BR1 of 3$679,036Low, 2.0% under the second
07 NOV 202587891District 03Project Number: 0Fcr-005 / /, section 22-00146-00-BR1 of 2$637,458Low, 26% under the second
19 SEP 202566R59District 03Section (6)SCR3 of 6$40,450+46%
19 SEP 202566R62District 03Section (15BR-2)BRR1 of 1$255,575Low
19 SEP 202566R70District 03Section (10RB-1)SCR1 of 2$64,451Low, 114% under the second
13 JUN 202546937District 03Section ILLINI3 of 3$2,048,310+25%
13 JUN 202566B58District 03Section (106BR-2)BR2 of 2$1,754,638+7.0%
13 JUN 202587882District 03Seneca, section 21-00020-00-BR4 of 4$690,114+29%
25 APR 202566P37District 03Section (11-X-1-BR-1,11-X-1-BR)BRR1 of 1$1,048,761Low
25 APR 202566R28District 03Section (112X)CLV-13 of 4$295,292+15%
07 MAR 202587853District 03Project Number: Y66W-867 / /, section 21-00835-00-BR2 of 2$1,248,690+46%
08 NOV 202466L79District 03Section (112BR)BR2 of 2$2,416,837+30%
14 JUN 202466L10District 03Section (13)BR-21 of 1$1,975,085Low
14 JUN 202466N52District 03Section (6XBR,6XBR-1)BRR1 of 3$850,262Low, 15% under the second
14 JUN 202466P02District 03Section (53-6)RA-73 of 3$3,510,489+24%
14 JUN 202487819District 03Project Number: W7U0-661 / /, section 21-00143-00-BR1 of 2$462,541Low, 1.0% under the second
14 JUN 202487823District 03Project Number: Du05-738 / /, section 17-15128-00-BR1 of 2$432,451Low, 7.0% under the second
14 JUN 202487835District 03Project Number: Wif6-885 / /, section 22-00304-00-BR1 of 1$910,990Low
Tobey's Construction & Cartage, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy