Cross Construction, Inc.: IDOT bid record
Cross Construction, Inc. submitted 53 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 22 of them (42%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $62,392,795
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 10 | 4 | 40% |
| 2022 | 11 | 5 | 45% |
| 2023 | 14 | 5 | 36% |
| 2024 | 10 | 4 | 40% |
| 2025 | 4 | 3 | 75% |
| 2026 | 4 | 1 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 05 | 45 | 22 | 49% |
| District 03 | 8 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Bit matls tack CT | 40600290 | LB | 45 | 26 (58%) | $1.20 | $0.01 |
| Short term pavt mking | 70300100 | LF | 31 | 25 (81%) | $2.00 | $1.01 |
| HMA SC IL-9.5 C N50 | 40604050 | TON | 28 | 20 (71%) | $125.00 | $144.00 |
| Agg wedge SHLD type B | 48102100 | TON | 23 | 15 (65%) | $45.00 | $50.00 |
| Incidental HMA surf | 40800050 | TON | 35 | 13 (37%) | $375.00 | $250.00 |
| Trainees TPG | Z0076604 | HR | 12 | 12 (100%) | $15.00 | $15.00 |
| Temporary ramp | 40600990 | SY | 28 | 11 (39%) | $48.50 | $19.46 |
| Long joint sealant | 40600370 | LF | 23 | 11 (48%) | $2.85 | $3.30 |
| HMA BC IL-9.5FG N50 | 40602965 | TON | 12 | 11 (92%) | $123.50 | $120.00 |
| Trainees | Z0076600 | HR | 11 | 11 (100%) | $0.80 | $0.80 |
| Sidewalk rem | 44000600 | SF | 19 | 9 (47%) | $5.60 | $3.00 |
| Comb curb gutter rem | 44000500 | LF | 17 | 9 (53%) | $21.00 | $11.61 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Open Road Paving Company LLC | 31 | 13 of 31 |
| Stark Excavating, Inc. | 8 | 5 of 8 |
| Iroquois Paving Corporation | 7 | 7 of 7 |
| Feutz Contractors, Inc. | 5 | 4 of 5 |
| A & R Mechanical Service, Inc. | 3 | 2 of 3 |
| Duce Construction Company | 3 | 2 of 3 |
| Phoenix Corporation of the Quad Cities | 3 | 2 of 3 |
| Tobey's Construction & Cartage, Inc. | 3 | 2 of 3 |
| William Charles Construction Company, LLC | 3 | 1 of 3 |
| Mid-Illinois Concrete and Excavation, Inc. | 2 | 1 of 2 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 46951 | District 05 | Section KICKAPOO | 2 of 2 | $4,958,714 | +21% |
| 12 JUN 2026 | 66M92 | District 03 | Section ((125)CR-2588,CR-2589) | 4 of 5 | $999,324 | +42% |
| 12 JUN 2026 | 70H86 | District 05 | Section D5 | 1 of 2 | $526,225 | Low, 20% under the second |
| 16 JAN 2026 | 66R58 | District 03 | Section (112X)CLV-2 | 4 of 4 | $1,150,251 | +68% |
| 25 APR 2025 | 70991 | District 05 | Section 25RS-6 | 1 of 2 | $14,499,778 | Low, 5.0% under the second |
| 25 APR 2025 | 91650 | District 05 | Project Number: Xsek-251 / /, section 23-00226-00-SP | 1 of 2 | $1,720,330 | Low, 6.0% under the second |
| 25 APR 2025 | 91654 | District 05 | Westville, section 24-00027-00-SW | 2 of 3 | $283,101 | +4.0% |
| 07 MAR 2025 | 70H32 | District 05 | Section (38)RS-3 | 1 of 2 | $717,409 | Low, 19% under the second |
| 20 SEP 2024 | 66P19 | District 03 | Section (109,110)RS-2 | 2 of 2 | $8,999,311 | +16% |
| 14 JUN 2024 | 70G24 | District 05 | Section (116)I | 1 of 2 | $307,328 | Low, 1.0% under the second |
| 14 JUN 2024 | 91647 | District 05 | Project Number: Xbdf-524 / /, section 23-17132-00-BR | 4 of 4 | $463,208 | +63% |
| 26 APR 2024 | 70753 | District 05 | Section 113CR | 3 of 4 | $728,344 | +7.0% |
| 26 APR 2024 | 70B07 | District 05 | Section (5,79,72)RS-1&(34)RS-2&85-1 | 2 of 2 | $4,647,356 | +4.0% |
| 26 APR 2024 | 70D26 | District 05 | Section (14)I | 1 of 3 | $500,000 | Low, 21% under the second |
| 26 APR 2024 | 90392 | District 05 | Section 40(W,RS) | 1 of 2 | $1,934,015 | Low, 11% under the second |
| 08 MAR 2024 | 70F51 | District 05 | Section CHAMPAIGN | 1 of 2 | $444,501 | Low, 36% under the second |
| 08 MAR 2024 | 91627 | District 05 | Rantoul, section 22-00116-00-SW | 2 of 5 | $179,129 | +1.0% |
| 08 MAR 2024 | 91638 | District 05 | Project Number: Ipc9-391- / /, section 23-00201-03-SD | 2 of 2 | $2,600,017 | +2.0% |
| 17 NOV 2023 | 91622 | District 05 | Danville, section 22-00368-00-PV | 2 of 3 | $1,798,750 | +10% |
| 22 SEP 2023 | 66N33 | District 03 | Section (13)SFY | 2 of 2 | $1,480,657 | +10% |
| 22 SEP 2023 | 91635 | District 05 | Project Number: A3Hk-750 / /, section 20-00453-00-SP | 2 of 2 | $8,757,655 | +7.0% |
| 16 JUN 2023 | 70A93 | District 05 | Section (104)RS-2 | 1 of 2 | $4,336,940 | Low, 2.0% under the second |
| 28 APR 2023 | 66N14 | District 03 | Section (915S)RS,MG | 3 of 3 | $326,830 | +11% |
| 28 APR 2023 | 70840 | District 05 | Section 48RS-6&(48Z-2)RS-3&(48X-3)CR | 1 of 2 | $6,915,403 | Low, 6.0% under the second |
| 28 APR 2023 | 70944 | District 05 | Section (113)RS-7 | 1 of 2 | $4,795,467 | Low, 1.0% under the second |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.