Cross Construction, Inc.: IDOT bid record

Cross Construction, Inc. submitted 53 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 22 of them (42%). When it was not low, its total sat a median +10% above the low bid.

Owner
Illinois DOT
Low bid volume
$62,392,795
Latest bid
31 JUL 2026
Data through
18 SEP 2026
53Bids
22Low bids
42Win rate, percent
+10%Median gap to the low bid when not low, 31 bids

By year

YearBidsLow bidsWin rate
202110440%
202211545%
202314536%
202410440%
20254375%
20264125%
Cross Construction, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 05452249%
District 03800%
Cross Construction, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB4526 (58%)$1.20$0.01
Short term pavt mking70300100LF3125 (81%)$2.00$1.01
HMA SC IL-9.5 C N5040604050TON2820 (71%)$125.00$144.00
Agg wedge SHLD type B48102100TON2315 (65%)$45.00$50.00
Incidental HMA surf40800050TON3513 (37%)$375.00$250.00
Trainees TPGZ0076604HR1212 (100%)$15.00$15.00
Temporary ramp40600990SY2811 (39%)$48.50$19.46
Long joint sealant40600370LF2311 (48%)$2.85$3.30
HMA BC IL-9.5FG N5040602965TON1211 (92%)$123.50$120.00
TraineesZ0076600HR1111 (100%)$0.80$0.80
Sidewalk rem44000600SF199 (47%)$5.60$3.00
Comb curb gutter rem44000500LF179 (53%)$21.00$11.61
Cross Construction, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Cross Construction, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202646951District 05Section KICKAPOO2 of 2$4,958,714+21%
12 JUN 202666M92District 03Section ((125)CR-2588,CR-2589)4 of 5$999,324+42%
12 JUN 202670H86District 05Section D51 of 2$526,225Low, 20% under the second
16 JAN 202666R58District 03Section (112X)CLV-24 of 4$1,150,251+68%
25 APR 202570991District 05Section 25RS-61 of 2$14,499,778Low, 5.0% under the second
25 APR 202591650District 05Project Number: Xsek-251 / /, section 23-00226-00-SP1 of 2$1,720,330Low, 6.0% under the second
25 APR 202591654District 05Westville, section 24-00027-00-SW2 of 3$283,101+4.0%
07 MAR 202570H32District 05Section (38)RS-31 of 2$717,409Low, 19% under the second
20 SEP 202466P19District 03Section (109,110)RS-22 of 2$8,999,311+16%
14 JUN 202470G24District 05Section (116)I1 of 2$307,328Low, 1.0% under the second
14 JUN 202491647District 05Project Number: Xbdf-524 / /, section 23-17132-00-BR4 of 4$463,208+63%
26 APR 202470753District 05Section 113CR3 of 4$728,344+7.0%
26 APR 202470B07District 05Section (5,79,72)RS-1&(34)RS-2&85-12 of 2$4,647,356+4.0%
26 APR 202470D26District 05Section (14)I1 of 3$500,000Low, 21% under the second
26 APR 202490392District 05Section 40(W,RS)1 of 2$1,934,015Low, 11% under the second
08 MAR 202470F51District 05Section CHAMPAIGN1 of 2$444,501Low, 36% under the second
08 MAR 202491627District 05Rantoul, section 22-00116-00-SW2 of 5$179,129+1.0%
08 MAR 202491638District 05Project Number: Ipc9-391- / /, section 23-00201-03-SD2 of 2$2,600,017+2.0%
17 NOV 202391622District 05Danville, section 22-00368-00-PV2 of 3$1,798,750+10%
22 SEP 202366N33District 03Section (13)SFY2 of 2$1,480,657+10%
22 SEP 202391635District 05Project Number: A3Hk-750 / /, section 20-00453-00-SP2 of 2$8,757,655+7.0%
16 JUN 202370A93District 05Section (104)RS-21 of 2$4,336,940Low, 2.0% under the second
28 APR 202366N14District 03Section (915S)RS,MG3 of 3$326,830+11%
28 APR 202370840District 05Section 48RS-6&(48Z-2)RS-3&(48X-3)CR1 of 2$6,915,403Low, 6.0% under the second
28 APR 202370944District 05Section (113)RS-71 of 2$4,795,467Low, 1.0% under the second
Cross Construction, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way