Open Road Paving Company LLC: IDOT bid record

Open Road Paving Company LLC submitted 44 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 25 APR 2025, and was the low bidder on 22 of them (50%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$179,092,490
Latest bid
25 APR 2025
Data through
18 SEP 2026
44Bids
22Low bids
50Win rate, percent
+7.0%Median gap to the low bid when not low, 22 bids

By year

YearBidsLow bidsWin rate
20217229%
2022151173%
202311545%
20247343%
20254125%
Open Road Paving Company LLC, IDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Paint PVT MK line 478001110LF2826 (93%)$0.15$1.00
Raised refl pavt MKR78100100EACH2421 (88%)$38.06$48.00
Bit matls tack CT40600290LB3619 (53%)$1.00$0.01
SHRT TRM pavt MK rem70300150SF2918 (62%)$6.50$1.20
Incidental HMA surf40800050TON3217 (53%)$363.00$250.00
Raised ref PVT MK rem78300200EACH2117 (81%)$14.00$15.00
Survey marker T2 SPLXZ193400EACH1817 (94%)$375.00$508.65
Engr field office B67000500CAL MO1816 (89%)$2,200.00$2,500.00
Temporary ramp40600990SY2615 (58%)$40.23$19.46
Bit matls tack CT40800029LB2615 (58%)$3.92$1.50
HMA surf rem 1 1/244000155SY2215 (68%)$4.25$3.80
HMA surf rem SPLX4400196SY2313 (57%)$16.00$16.00
Open Road Paving Company LLC, IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Open Road Paving Company LLC, IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
25 APR 202570991District 05Section 25RS-62 of 2$15,261,584+5.0%
25 APR 202591650District 05Project Number: Xsek-251 / /, section 23-00226-00-SP2 of 2$1,827,200+6.0%
07 MAR 202570H32District 05Section (38)RS-32 of 2$852,544+19%
17 JAN 202570A55District 05Section 92(12,12-1)RS-21 of 1$32,255,503Low
14 JUN 202470C14District 05Section (14)RS-3(122)RS-4,(14CR)2 of 2$14,202,647+15%
14 JUN 202470G24District 05Section (116)I2 of 2$309,338+1.0%
26 APR 202470B07District 05Section (5,79,72)RS-1&(34)RS-2&85-11 of 2$4,479,683Low, 4.0% under the second
26 APR 202490392District 05Section 40(W,RS)2 of 2$2,142,309+11%
08 MAR 202470F51District 05Section CHAMPAIGN2 of 2$606,455+36%
08 MAR 202491638District 05Project Number: Ipc9-391- / /, section 23-00201-03-SD1 of 2$2,541,678Low, 2.0% under the second
19 JAN 202470B89District 05Section 101RS-51 of 2$9,851,467Low, 12% under the second
22 SEP 202391635District 05Project Number: A3Hk-750 / /, section 20-00453-00-SP1 of 2$8,174,434Low, 7.0% under the second
16 JUN 202370A93District 05Section (104)RS-22 of 2$4,443,002+2.0%
28 APR 202370840District 05Section 48RS-6&(48Z-2)RS-3&(48X-3)CR2 of 2$7,301,287+6.0%
28 APR 202370944District 05Section (113)RS-72 of 2$4,863,090+1.0%
28 APR 202370996District 05Section (10,11)RS-31 of 2$5,516,276Low, 9.0% under the second
28 APR 202370E29District 05Section D52 of 2$612,173+47%
28 APR 202370F46District 05Section CHAMPAIGN1 of 2$591,140Low, 3.0% under the second
28 APR 202370G23District 05Section (89-15)I1 of 2$222,890Low, 16% under the second
10 MAR 202370B05District 05Section K(RS-2)2 of 2$2,577,501+10%
10 MAR 202370E84District 05Section (3R,3X)RS-11 of 2$2,292,482Low, 11% under the second
20 JAN 202391609District 05Mahomet, section 18-00036-00-RS2 of 2$897,325+2.0%
17 JUN 202270A29District 05Section (92-10,11,12)R1 of 1$63,305,838Low
17 JUN 202270F39District 05Section (10-37)RS-3&(10,27-38)RS-21 of 1$8,228,483Low
29 APR 202270A57District 05Section (114,115)RS-3&(74,10-70)RS-41 of 1$8,224,171Low
Open Road Paving Company LLC: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy