Howell Paving, Inc.: IDOT bid record

Howell Paving, Inc. submitted 135 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 18 SEP 2026, and was the low bidder on 110 of them (81%). When it was not low, its total sat a median +7.0% above the low bid.

Owner
Illinois DOT
Low bid volume
$464,116,034
Latest bid
18 SEP 2026
Data through
18 SEP 2026
135Bids
110Low bids
81Win rate, percent
+7.0%Median gap to the low bid when not low, 25 bids

By year

YearBidsLow bidsWin rate
2021282382%
2022282279%
2023191684%
2024252080%
2025161594%
2026191474%
Howell Paving, Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 071099486%
District 0813862%
District 0510660%
District 092150%
District 0411100%
Howell Paving, Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Raised refl pavt MKR78100100EACH2928 (97%)$35.95$48.00
Paint PVT MK line 478001110LF2523 (92%)$0.16$1.00
Changeable message SN70107025CAL DAY3419 (56%)$92.50$55.00
Short term pavt mking70300100LF3218 (56%)$1.29$1.01
Bit matls tack CT40600290LB3916 (41%)$1.27$0.01
HMA SC IL-9.5 C N7040604052TON2415 (63%)$110.70$131.00
THPL PVT MK line 478000200LF1615 (94%)$1.21$0.88
HMA surf rem butt JT40600982SY2314 (61%)$8.87$16.50
Incidental HMA surf40800050TON3013 (43%)$239.84$250.00
Agg wedge SHLD type B48102100TON2813 (46%)$42.03$50.00
SHRT TRM pavt MK rem70300150SF2613 (50%)$3.77$1.20
THPL PVT MK line 1278000600LF1513 (87%)$5.50$3.10
Howell Paving, Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Howell Paving, Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
18 SEP 202674B73District 07Section D71 of 1$3,605,567Low
31 JUL 202674829District 07Section (2,2Z)1 of 2$3,050,707Low, 9.0% under the second
31 JUL 202674E43District 07Section D71 of 2$61,319Low, 94% under the second
31 JUL 202691669District 05Project Number: R9Gf-473 / /, section 22-00137-01-RS2 of 2$2,294,716+5.0%
31 JUL 202697902District 08Salem, section 23-00047-04-RS1 of 2$436,089Low, 28% under the second
12 JUN 202674D52District 07Section (DX,BX)RS-2&(CX,BX-1)RS-31 of 1$12,896,618Low
12 JUN 202674D54District 07Section (7,6)&(5,4)RS-31 of 2$1,860,730Low, 4.0% under the second
12 JUN 202676M95District 08Section 95-(3,4)RS-22 of 3$88,925,753+20%
12 JUN 202695A12District 07Project Number: Kxzm-943 / /, section 25-00301-00-PP1 of 1$732,605Low
24 APR 202674D10District 07Section (24,25)RS-41 of 1$1,158,719Low
24 APR 202674E24District 07Section (4,3)SR1 of 3$215,113Low, 6.0% under the second
24 APR 202695A04District 07Project Number: T5Ul-360 / /, section 23-00130-00-SD2 of 2$2,516,363+1.0%
24 APR 202695A08District 07Project Number: 6Ai0-352 / /, section 25-00131-00-RS2 of 2$975,883+7.0%
27 FEB 202676U40District 08Section (28,29-2)RS-11 of 1$4,980,603Low
16 JAN 202674498District 07Section (106,107)RS-31 of 1$2,835,837Low
16 JAN 202674B61District 07Section (107Z)RS-41 of 1$1,434,601Low
16 JAN 202674C61District 07Section (25-6-1)RS-91 of 1$6,207,309Low
16 JAN 202674D34District 07Section 1012 of 2$632,077+27%
16 JAN 202695982District 07Project Number: 1Vv2-637 / /, section 21-00072-00-RS1 of 1$2,076,432Low
19 SEP 202574608District 07Section (105)RS-31 of 1$947,329Low
19 SEP 202574A04District 07Section 25-8BR1 of 4$7,201,957Low, 3.0% under the second
19 SEP 202574D57District 07Section (26-0,1)MED1 of 8$860,301Low, 2.0% under the second
19 SEP 202576R08District 08Section 24RS-51 of 1$1,023,182Low
01 AUG 202595981District 07Project Number: 00L8-664 / /, section 25-00088-00-RS1 of 2$612,883Low, 14% under the second
13 JUN 202574B63District 07Section D71 of 1$1,185,220Low
Howell Paving, Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy