IDOT contract 74D34 bid tabulation
Section 101. Let by Illinois DOT on January 16, 2026, Shelby, District 07. 2 bids received; low bid $499,150 by A & R Mechanical Service, Inc..
- Owner
- Illinois DOT
- Letting
- 16 JAN 2026
- Pay items
- 32
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | A & R Mechanical Service, Inc. | $499,150 | Low |
| 2 | Howell Paving, Inc. | $632,077 | +27% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A & R Mechanical Service, Inc. | 2. Howell Paving, Inc. |
|---|---|---|---|---|---|
| 1 | Temporary ramp SPL (X4060995) | SY | 478 | $34.50 | $32.86 |
| 2 | Surf rem var DP (SPL) (X4400102) | SY | 633 | $29.91 | $36.86 |
| 3 | Inlet box adj SPL (X6020050) | EACH | 4 | $555.19 | $716.48 |
| 4 | Conc retain wall rem (Z0075496) | LF | 28 | $17.33 | $52.44 |
| 5 | Sub gran mat B 4 (31101200) | SY | 173 | $27.75 | $19.27 |
| 6 | PCC base cse W 10 (35400500) | SY | 62 | $101.64 | $151.76 |
| 7 | Bit matls tack CT (40600290) | LB | 2,874 | $2.31 | $2.20 |
| 8 | Incidental HMA surf (40800050) | TON | 54 | $588.08 | $560.80 |
| 9 | PC conc sidewalk 6 (42400300) | SF | 4,875 | $17.46 | $20.57 |
| 10 | Detectable warnings (42400800) | SF | 93 | $28.37 | $35.30 |
| 11 | Pavement rem (44000100) | SY | 67 | $35.24 | $98.62 |
| 12 | HMA surf rem 3 3/4 (44000164) | SY | 4,257 | $4.51 | $10.91 |
| 13 | Comb curb gutter rem (44000500) | LF | 235 | $20.29 | $86.57 |
| 14 | Sidewalk rem (44000600) | SF | 4,613 | $5.86 | $8.42 |
| 15 | HMA shoulders (48203100) | TON | 894 | $199.72 | $190.21 |
| 16 | Comb CC&G TY B-6.24 (60605000) | LF | 247 | $61.99 | $121.13 |
| 17 | Non SPL waste disposl (66900200) | CY | 30 | $97.96 | $383.05 |
| 18 | Soil disposal analy (66900530) | EACH | 1 | $1,522.50 | $1,450.00 |
| 19 | Reg sub P-const plan (66901001) | LS | 1 | $2,310.00 | $2,200.00 |
| 20 | Reg sub F con report (66901003) | LS | 1 | $2,310.00 | $2,200.00 |
| 21 | Reg sub mon (66901006) | CAL DAY | 2 | $1,186.50 | $1,130.00 |
| 22 | Engr field office A (67000400) | CAL MO | 5 | $1,770.00 | $3,775.86 |
| 23 | Mobilization (67100100) | LS | 1 | $25,129 | $35,163 |
| 24 | Traf cont-prot 701201 (70100450) | LS | 1 | $598.43 | $0.01 |
| 25 | Traf cont-prot 701306 (70100460) | LS | 1 | $598.43 | $0.01 |
| 26 | TR cont & prot 701501 (70102620) | LS | 1 | $5,743.43 | $29,190 |
| 27 | TR cont & prot 701801 (70102640) | LS | 1 | $5,743.43 | $2,627.37 |
| 28 | Changeable message SN (70107025) | CAL DAY | 28 | $136.50 | $150.00 |
| 29 | THPL PVT MK line 4 (78000200) | LF | 4,704 | $1.55 | $1.48 |
| 30 | THPL PVT MK line 6 (78000400) | LF | 80 | $2.63 | $2.50 |
| 31 | GRV RCSD PVT MRKG 5 (78011025) | LF | 4,704 | $1.47 | $1.40 |
| 32 | GRV RCSD PVT MRKG 7 (78011035) | LF | 80 | $2.36 | $2.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of January 16, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.