IDOT contract 76U40 bid tabulation
Section (28,29-2)RS-1. Let by Illinois DOT on February 27, 2026, Marion, District 08. 1 bid received; low bid $4,980,603 by Howell Paving, Inc..
- Owner
- Illinois DOT
- Letting
- 27 FEB 2026
- Pay items
- 53
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Howell Paving, Inc. | $4,980,603 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Howell Paving, Inc. |
|---|---|---|---|---|
| 1 | WF beam TM JT rep SPL (X4210307) | EACH | 8 | $8,571.94 |
| 2 | Part dep rem T4 2 (X4406620) | SY | 9,184 | $11.47 |
| 3 | PCC surf rem 1/4 (X4406803) | SY | 58,308 | $2.97 |
| 4 | CL A patch expan JT (X4420525) | LF | 240 | $78.48 |
| 5 | CL A patch T1 10 SPL (X4420551) | SY | 32 | $245.00 |
| 6 | CL A patch T2 10 SPL (X4420553) | SY | 118 | $200.00 |
| 7 | CL A patch T3 10 SPL (X4420557) | SY | 89 | $190.00 |
| 8 | CL A patch T4 10 SPL (X4420559) | SY | 1,997 | $180.00 |
| 9 | Partial depth patch (X4421000) | TON | 1,029 | $284.68 |
| 10 | Construction layout (Z0013798) | LS | 1 | $34,678 |
| 11 | Agg base cse B 4 (35101600) | SY | 113 | $21.59 |
| 12 | Bit matls tack CT (40600290) | LB | 59,534 | $1.32 |
| 13 | Long joint sealant (40600370) | LF | 21,865 | $2.98 |
| 14 | Matl transfer device (40600405) | TON | 12,245 | $2.86 |
| 15 | HMA surf rem butt JT (40600982) | SY | 155 | $110.91 |
| 16 | PCC surf rem butt JT (40600985) | SY | 889 | $9.45 |
| 17 | HMA BC IL-19.0 N70 (40603085) | TON | 7,797 | $130.03 |
| 18 | HMA SC IL-9.5 D N70 (40604062) | TON | 5,198 | $137.84 |
| 19 | Protective coat (42001300) | SY | 113 | $4.91 |
| 20 | Comb curb gutter rem (44000500) | LF | 396 | $64.13 |
| 21 | CL D patch T3 10 (44201769) | SY | 64 | $303.58 |
| 22 | Patch reinforcement (44213000) | SY | 2,236 | $60.00 |
| 23 | Saw cuts (44213200) | LF | 3,175 | $5.00 |
| 24 | Tie bars 3/4 (44213204) | EACH | 1,681 | $25.00 |
| 25 | Aggregate SHLDS B 4 (48101498) | SY | 9,915 | $13.15 |
| 26 | Agg wedge SHLD type B (48102100) | TON | 2,321 | $41.77 |
| 27 | HMA shoulders (48203100) | TON | 4,751 | $114.08 |
| 28 | Man adjust (60255500) | EACH | 1 | $797.56 |
| 29 | Inlets adjust (60260100) | EACH | 1 | $760.71 |
| 30 | Comb CC&G TY B-6.24 (60605000) | LF | 396 | $138.17 |
| 31 | SPBGR TY A 6FT posts (63000001) | LF | 1,363 | $35.00 |
| 32 | Traf bar term T6 (63100085) | EACH | 18 | $4,400.00 |
| 33 | TR bar TRM T1 SPL tan (63100167) | EACH | 18 | $4,000.00 |
| 34 | Guardrail remov (63200310) | LF | 2,702 | $5.75 |
| 35 | Engr field office A (67000400) | CAL MO | 7 | $3,298.28 |
| 36 | Mobilization (67100100) | LS | 1 | $275,172 |
| 37 | Traf cont-prot 701201 (70100450) | LS | 1 | $0.01 |
| 38 | Traf cont-prot 701306 (70100460) | LS | 1 | $161,340 |
| 39 | Traf cont-prot 701326 (70100500) | LS | 1 | $48,507 |
| 40 | Traf cont-prot 701336 (70100600) | LS | 1 | $0.01 |
| 41 | TR cont & prot 701501 (70102620) | LS | 1 | $42,805 |
| 42 | TR cont & prot 701601 (70102630) | LS | 1 | $23,900 |
| 43 | Changeable message SN (70107025) | CAL DAY | 128 | $125.00 |
| 44 | Short term pavt mking (70300100) | LF | 5,586 | $2.73 |
| 45 | SHRT TRM pavt MK rem (70300150) | SF | 2,973 | $0.01 |
| 46 | Temp PVT MK line 6 - paint (70300241) | LF | 49,198 | $0.01 |
| 47 | Temp PVT MK line 24 - paint (70300281) | LF | 120 | $0.01 |
| 48 | Terminal marker - DA (72501000) | EACH | 18 | $50.00 |
| 49 | THPL PVT MK line 6 (78000400) | LF | 49,198 | $0.77 |
| 50 | THPL PVT MK line 24 (78000650) | LF | 120 | $15.00 |
| 51 | Raised refl pavt MKR (78100100) | EACH | 273 | $61.92 |
| 52 | Grdrail ref type A (78200005) | EACH | 57 | $10.00 |
| 53 | Raised ref PVT MK rem (78300200) | EACH | 273 | $0.01 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of February 27, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.