IDOT contract 74A04 bid tabulation
Section 25-8BR. Let by Illinois DOT on September 19, 2025, Effingham, District 07. 4 bids received; low bid $7,201,957 by Howell Paving, Inc..
- Owner
- Illinois DOT
- Letting
- 19 SEP 2025
- Pay items
- 92
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Howell Paving, Inc. | $7,201,957 | Low |
| 2 | Samron Midwest Contracting, Inc. | $7,414,568 | +3.0% |
| 3 | Plocher Construction Company, Inc. | $8,498,500 | +18% |
| 4 | William Charles Construction Company, LLC | $8,643,813 | +20% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Howell Paving, Inc. | 2. Samron Midwest Contracting, Inc. | 3. Plocher Construction Company, Inc. | 4. William Charles Construction Company, LLC |
|---|---|---|---|---|---|---|---|
| 1 | Rodent shields (X0322278) | EACH | 2 | $50.00 | $125.00 | $52.00 | $400.00 |
| 2 | Pipe underdrain 6 mod (X1200107) | LF | 566 | $32.07 | $44.00 | $33.00 | $40.00 |
| 3 | Recoverable delineatr (X2600002) | EACH | 70 | $110.00 | $120.00 | $115.00 | $95.00 |
| 4 | Conc HDWL rem SPL (X5012650) | EACH | 8 | $517.87 | $400.00 | $900.00 | $1,200.00 |
| 5 | BR deck grooving long (X5030250) | SY | 512 | $14.97 | $13.75 | $10.00 | $12.50 |
| 6 | Bar terminators (X5080530) | EACH | 589 | $30.70 | $30.00 | $5.25 | $35.00 |
| 7 | Pipe drain removal (X6010003) | LF | 116 | $21.04 | $17.00 | $15.25 | $20.00 |
| 8 | P undr outlet ext 6 (X6010106) | EACH | 7 | $499.37 | $830.00 | $500.00 | $650.00 |
| 9 | Remove inlet box (X6050700) | EACH | 2 | $1,220.60 | $1,000.00 | $900.00 | $575.00 |
| 10 | Class SI conc (misc) (X6060095) | CY | 3 | $1,500.00 | $1,000.00 | $2,000.00 | $1,400.00 |
| 11 | Wov W fence remov (X6650202) | LF | 51 | $13.35 | $4.00 | $15.00 | $37.38 |
| 12 | Temp rumble strips SP (X7010118) | EACH | 16 | $1,800.00 | $1,900.00 | $1,800.00 | $1,550.00 |
| 13 | Real-time TR cont cbu (X7011854) | CAL MO | 20 | $600.00 | $1,440.00 | $600.00 | $1,580.00 |
| 14 | Real-time TR con W SGN (X7011860) | CAL MO | 80 | $575.00 | $630.00 | $575.00 | $655.00 |
| 15 | Real-time TR mon SU (X7011862) | CAL MO | 160 | $181.50 | $340.00 | $181.50 | $225.00 |
| 16 | Temp raised pavt MKR (X7810400) | EACH | 176 | $104.00 | $115.00 | $104.00 | $95.00 |
| 17 | Approach slab rem (Z0004552) | SY | 1,248 | $45.38 | $40.00 | $60.00 | $50.00 |
| 18 | Diamond grind BR sec (Z0029090) | SY | 1,144 | $13.89 | $15.00 | $20.00 | $17.00 |
| 19 | Tree remov acres (20100500) | ACRE | 0.50 | $24,352 | $40,000 | $16,000 | $70,000 |
| 20 | Earth excavation (20200100) | CY | 943 | $68.89 | $42.00 | $55.00 | $100.00 |
| 21 | Topsoil exc & plac (21101505) | CY | 1,464 | $68.63 | $27.00 | $25.00 | $38.00 |
| 22 | Seeding CL 2 (25000200) | ACRE | 0.50 | $5,725.00 | $3,500.00 | $5,725.00 | $14,750 |
| 23 | Seeding CL 5 (25000320) | ACRE | 0.50 | $8,225.00 | $4,500.00 | $8,225.00 | $14,750 |
| 24 | Nitrogen fert nutr (25000400) | LB | 82 | $1.65 | $1.30 | $1.65 | $6.35 |
| 25 | Phosphorus fert nutr (25000500) | LB | 82 | $1.65 | $1.30 | $1.65 | $6.35 |
| 26 | Potassium fert nutr (25000600) | LB | 82 | $1.65 | $1.30 | $1.65 | $6.35 |
| 27 | Agr ground limestone (25000700) | TON | 2 | $350.00 | $400.00 | $350.00 | $498.00 |
| 28 | Mulch method 2 (25100115) | ACRE | 1 | $3,125.00 | $3,600.00 | $3,125.00 | $4,637.50 |
| 29 | Erosion contr blanket (25100630) | SY | 344 | $2.25 | $3.00 | $2.25 | $5.85 |
| 30 | Temp eros contr seed (28000250) | LB | 366 | $3.19 | $2.00 | $5.70 | $4.00 |
| 31 | Temp ditch checks (28000305) | LF | 150 | $32.03 | $16.00 | $9.00 | $20.00 |
| 32 | Perimeter eros bar (28000400) | LF | 855 | $14.46 | $5.00 | $2.50 | $8.00 |
| 33 | Temp eros contr blank (28001100) | SY | 344 | $4.25 | $5.00 | $2.25 | $14.00 |
| 34 | Stone riprap CL A3 (28100105) | SY | 39 | $36.06 | $60.00 | $140.00 | $65.00 |
| 35 | Stone riprap CL A5 (28100109) | SY | 1,913 | $135.63 | $130.00 | $150.00 | $130.00 |
| 36 | Filter fabric (28200200) | SY | 1,952 | $2.84 | $3.00 | $1.60 | $3.84 |
| 37 | Stab subbase 4 (31200100) | SY | 2,141 | $43.35 | $36.00 | $16.00 | $43.38 |
| 38 | Agg base cse B (35101400) | TON | 7,921 | $42.63 | $44.00 | $50.00 | $30.00 |
| 39 | HMA base cse 10 (35501324) | SY | 15,482 | $86.46 | $95.00 | $86.46 | $86.46 |
| 40 | Welded wire reinf (42000060) | SY | 5,524 | $9.54 | $7.00 | $12.50 | $16.50 |
| 41 | PVT con PCC BR app SL (42000080) | SY | 228 | $197.50 | $200.00 | $225.00 | $224.00 |
| 42 | PCC PVT 10 1/2 jointd (42000511) | SY | 5,524 | $119.81 | $100.00 | $114.00 | $93.00 |
| 43 | PCC PVT 13 jointed (42000561) | SY | 2,074 | $139.41 | $110.00 | $140.00 | $114.00 |
| 44 | Protective coat (42001300) | SY | 5,524 | $1.23 | $1.00 | $2.65 | $1.00 |
| 45 | Pavement rem (44000100) | SY | 1,425 | $43.08 | $23.00 | $29.10 | $55.00 |
| 46 | Paved SHLD removal (44004250) | SY | 18,026 | $19.30 | $5.00 | $12.50 | $13.00 |
| 47 | Aggregate SHLDS B 6 (48101500) | SY | 45 | $72.25 | $34.00 | $90.00 | $45.00 |
| 48 | PCC shoulders 9 (48300400) | SY | 1,492 | $117.35 | $88.00 | $120.00 | $85.00 |
| 49 | Rem exist struct (50100100) | EACH | 1 | $125,230 | $243,000 | $320,000 | $254,490 |
| 50 | Structure excavation (50200100) | CY | 479 | $59.55 | $0.01 | $56.00 | $80.00 |
| 51 | Conc struct (50300225) | CY | 109 | $856.15 | $800.00 | $1,100.00 | $1,425.00 |
| 52 | Conc sup-STR (50300255) | CY | 298.80 | $1,456.23 | $1,350.00 | $2,200.00 | $1,750.00 |
| 53 | Protective coat (50300300) | SY | 1,171 | $2.82 | $2.00 | $2.50 | $3.00 |
| 54 | Conc supstr app slab (50301350) | CY | 142.60 | $432.90 | $515.00 | $550.00 | $880.68 |
| 55 | F&E PP con beam IL63N (50401345) | LF | 787 | $739.48 | $770.00 | $1,200.00 | $1,555.00 |
| 56 | Reinforcement bars (50800105) | LB | 71 | $3.00 | $40.00 | $3.00 | $16.85 |
| 57 | Reinf bars, epoxy CTD (50800205) | LB | 140,140 | $1.53 | $1.50 | $1.50 | $2.50 |
| 58 | Fur M S pile 14X0.312 (51200959) | LF | 990 | $102.71 | $95.00 | $68.00 | $65.00 |
| 59 | Driving piles (51202305) | LF | 990 | $0.01 | $0.01 | $0.10 | $68.00 |
| 60 | Test pile met shells (51203200) | EACH | 2 | $7,225.76 | $25,000 | $50,000 | $7,500.00 |
| 61 | Pile shoes (51204650) | EACH | 22 | $434.63 | $200.00 | $315.00 | $500.00 |
| 62 | Name plates (51500100) | EACH | 1 | $573.72 | $900.00 | $1,500.00 | $1,619.04 |
| 63 | P cul CL A 1 15 (542A0220) | LF | 54 | $154.52 | $70.00 | $140.00 | $95.00 |
| 64 | P cul CL A 1 eqrs 24 (542A5479) | LF | 1,262 | $149.81 | $137.00 | $152.25 | $100.00 |
| 65 | PRC FL end S EQ RS 24 (54214509) | EACH | 4 | $3,063.00 | $2,700.00 | $1,910.00 | $5,500.00 |
| 66 | Granular backfill STR (58600101) | CY | 282 | $90.62 | $106.00 | $125.00 | $85.00 |
| 67 | Geocomposite wall DR (59100100) | SY | 128 | $31.17 | $18.00 | $20.00 | $60.00 |
| 68 | Pipe underdrain 6 SP (60108200) | LF | 33 | $71.29 | $30.00 | $71.30 | $200.00 |
| 69 | P undr for struct 4 (60146304) | LF | 192 | $69.30 | $26.00 | $26.00 | $40.00 |
| 70 | Man TA 7 dia T1F OL (60224445) | EACH | 2 | $5,362.77 | $5,600.00 | $8,050.00 | $7,000.00 |
| 71 | Inlets TA T8G (60236200) | EACH | 4 | $3,189.70 | $2,200.00 | $3,350.00 | $3,000.00 |
| 72 | SPBGR TY A 6FT posts (63000001) | LF | 550 | $35.55 | $40.00 | $30.00 | $30.00 |
| 73 | Traf bar term T6 (63100085) | EACH | 2 | $5,340.00 | $5,000.00 | $4,500.00 | $4,500.00 |
| 74 | TR bar TRM T1 SPL tan (63100167) | EACH | 2 | $4,070.00 | $4,500.00 | $3,600.00 | $3,600.00 |
| 75 | Guardrail remov (63200310) | LF | 765 | $9.95 | $7.00 | $8.50 | $5.00 |
| 76 | Mod glar SCR sys temp (63800920) | LF | 13,887.50 | $8.00 | $9.00 | $8.00 | $13.00 |
| 77 | Shoulder rum strip 16 (64200116) | LF | 16,066 | $0.60 | $2.00 | $0.30 | $0.30 |
| 78 | Wov W fence 4 (66500105) | LF | 155 | $144.70 | $26.00 | $55.00 | $55.00 |
| 79 | Perm surv MKRS T1 (66700205) | EACH | 1 | $398.91 | $1,000.00 | $1,500.00 | $700.00 |
| 80 | Engr field office A (67000400) | CAL MO | 14 | $3,331.50 | $2,000.00 | $650.00 | $2,600.00 |
| 81 | Mobilization (67100100) | LS | 1 | $65,682 | $440,000 | $593,360 | $450,000 |
| 82 | Traf cont-prot 701416 (70100410) | EACH | 1 | $131,373 | $170,000 | $175,000 | $250,000 |
| 83 | Traf cont-prot 701401 (70100800) | LS | 1 | $66,727 | $60,000 | $52,000 | $170,000 |
| 84 | Changeable message SN (70107025) | CAL DAY | 28 | $115.00 | $130.00 | $115.00 | $150.00 |
| 85 | Temp PVT MK L6 T4 tape (70307130) | LF | 14,339 | $2.28 | $2.50 | $2.28 | $2.45 |
| 86 | Temp conc barrier (70400100) | LF | 13,887.50 | $33.57 | $45.00 | $37.00 | $35.50 |
| 87 | Terminal marker - DA (72501000) | EACH | 2 | $50.00 | $47.00 | $50.00 | $50.00 |
| 88 | Pref PL PM TB STD L6 (78003131) | LF | 16,536 | $4.75 | $5.30 | $7.50 | $4.50 |
| 89 | GRV RCSD PVT MRKG 7 (78011035) | LF | 2,197 | $0.25 | $0.30 | $3.50 | $3.95 |
| 90 | Raised refl pavt MKR (78100100) | EACH | 19 | $66.50 | $74.00 | $645.00 | $275.00 |
| 91 | Grdrail ref type A (78200005) | EACH | 10 | $10.00 | $13.00 | $10.00 | $10.00 |
| 92 | PVT MKG rem grinding (78300201) | SF | 7,169 | $0.95 | $1.00 | $2.75 | $1.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of September 19, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.