IDOT contract 76M95 bid tabulation
Section 95-(3,4)RS-2. Let by Illinois DOT on June 12, 2026, Washington, District 08. 3 bids received; low bid $74,388,393 by Samron Midwest Contracting, Inc..
- Owner
- Illinois DOT
- Letting
- 12 JUN 2026
- Pay items
- 146
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Samron Midwest Contracting, Inc. | $74,388,393 | Low |
| 2 | Howell Paving, Inc. | $88,925,753 | +20% |
| 3 | Christ Bros. Asphalt Inc/The Kilian Corp (JV) | $90,927,859 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Samron Midwest Contracting, Inc. | 2. Howell Paving, Inc. | 3. Christ Bros. Asphalt Inc/The Kilian Corp (JV) |
|---|---|---|---|---|---|---|
| 1 | Connect exist culvert (X0327423) | EACH | 1 | $2,300.00 | $2,115.43 | $2,115.43 |
| 2 | Travers pipe grate SP (X1200090) | EACH | 22 | $8,000.00 | $3,166.15 | $3,166.15 |
| 3 | HMA surf rem var DP (X4401198) | SY | 132,667 | $2.65 | $6.14 | $1.50 |
| 4 | Island removal (X4402805) | SF | 224 | $5.85 | $12.00 | $11.39 |
| 5 | Pavt removal SPL (X4404400) | SY | 758 | $20.00 | $33.66 | $33.66 |
| 6 | Aggregate SHLD removl (X4810200) | CY | 12 | $62.00 | $740.95 | $100.00 |
| 7 | HMA shoulders SPL (X4823105) | TON | 146,568 | $95.00 | $112.13 | $125.00 |
| 8 | Concrete headwall SPL (X5036003) | EACH | 459 | $3,229.00 | $3,200.00 | $3,221.00 |
| 9 | Pipe underdrn rem SPL (X6013700) | LF | 201,880 | $0.01 | $7.36 | $0.50 |
| 10 | Rem conc HDWL P DRNS (X6015000) | EACH | 29 | $338.00 | $414.98 | $265.00 |
| 11 | Remove inlet box (X6050700) | EACH | 1 | $2,165.00 | $2,367.09 | $2,367.09 |
| 12 | Traf cont & prot SPL (X7010216) | LS | 1 | $1,500,000 | $658,698 | $939,628 |
| 13 | TC-prot 701701 SPL (X7010234) | LS | 1 | $35,000 | $101,109 | $65,325 |
| 14 | Temporary signing (X7200062) | EACH | 2,255 | $105.00 | $30.00 | $99.00 |
| 15 | Temp lighting system (X8410102) | LS | 1 | $373,000 | $210,000 | $210,000 |
| 16 | Conc pavt scar (Z0012800) | SY | 269,306 | $0.85 | $0.86 | $1.80 |
| 17 | Construction layout (Z0013798) | LS | 1 | $725,000 | $210,750 | $766,604 |
| 18 | Drainage STR adj (Z0018400) | EACH | 3 | $1,700.00 | $5,706.70 | $5,706.70 |
| 19 | Expansion joint SPL (Z0021400) | LF | 190 | $250.00 | $560.00 | $560.00 |
| 20 | Tubular marker (Z0024475) | EACH | 62 | $277.00 | $325.00 | $210.00 |
| 21 | Slot DR 24" W/var SL (Z0065775) | LF | 273 | $375.00 | $918.00 | $918.00 |
| 22 | Slot DR 30" W/var SL (Z0065780) | LF | 142 | $400.00 | $1,132.00 | $1,132.00 |
| 23 | Trainees (Z0076600) | HR | 4,000 | $0.80 | $0.80 | $0.80 |
| 24 | Trainees TPG (Z0076604) | HR | 4,000 | $15.00 | $15.00 | $15.00 |
| 25 | Earth excavation (20200100) | CY | 29,793 | $70.00 | $56.26 | $63.00 |
| 26 | Furnished excavation (20400800) | CY | 32,070 | $0.01 | $33.96 | $33.96 |
| 27 | Grading & shap ditch (21400100) | LF | 310 | $35.00 | $40.26 | $40.26 |
| 28 | Seeding CL 2A (25000210) | ACRE | 2 | $3,900.00 | $3,625.00 | $20,000 |
| 29 | Nitrogen fert nutr (25000400) | LB | 181 | $2.00 | $1.70 | $10.00 |
| 30 | Phosphorus fert nutr (25000500) | LB | 181 | $2.00 | $1.70 | $10.00 |
| 31 | Potassium fert nutr (25000600) | LB | 181 | $2.00 | $1.70 | $10.00 |
| 32 | Erosion contr blanket (25100630) | SY | 9,705 | $2.65 | $2.45 | $4.00 |
| 33 | Perimeter eros bar (28000400) | LF | 207,282 | $2.50 | $4.32 | $1.00 |
| 34 | Stone riprap CL A4 (28100107) | SY | 125 | $125.00 | $89.15 | $89.15 |
| 35 | Stab subbase HMA 4 (31200500) | SY | 637 | $45.00 | $66.95 | $43.50 |
| 36 | Agg base cse A 7 (35100600) | SY | 223,470 | $20.00 | $21.56 | $19.50 |
| 37 | Agg base cse A 12 (35101100) | SY | 23,019 | $30.00 | $30.40 | $30.40 |
| 38 | Agg base cse B 4 (35101600) | SY | 1,447 | $40.00 | $63.45 | $30.50 |
| 39 | HMA BC wid 5 (35600670) | SY | 1,575 | $85.00 | $91.28 | $63.50 |
| 40 | Bit matls tack CT (40600290) | LB | 40,518 | $0.01 | $1.56 | $2.00 |
| 41 | P bit matls tack CT (40600295) | LB | 302,123 | $0.01 | $1.11 | $2.00 |
| 42 | Long joint sealant (40600370) | LF | 633,600 | $3.65 | $3.29 | $3.30 |
| 43 | Matl transfer device (40600405) | TON | 259,889 | $0.01 | $1.80 | $4.50 |
| 44 | HMA surf rem butt JT (40600982) | SY | 436 | $15.00 | $40.03 | $12.00 |
| 45 | Temporary ramp (40600990) | SY | 436 | $25.00 | $27.24 | $15.00 |
| 46 | P HMA BC SMA 12.5 N80 (40605015) | TON | 17,625 | $140.00 | $188.32 | $175.00 |
| 47 | P SC SMA 12.5 E N80 (40605034) | TON | 80,500 | $140.00 | $182.16 | $175.00 |
| 48 | PCC PVT 9 jointed (42000401) | SY | 640 | $115.00 | $140.00 | $140.00 |
| 49 | PCC PVT 10 jointed (42000501) | SY | 22,393 | $125.00 | $109.00 | $109.00 |
| 50 | Pavement rem (44000100) | SY | 628 | $25.00 | $43.00 | $40.63 |
| 51 | HMA surf rem 2 (44000157) | SY | 33,285 | $5.00 | $6.18 | $8.50 |
| 52 | HMA surf rem 3 1/4 (44000162) | SY | 18,935 | $6.00 | $8.97 | $8.50 |
| 53 | HMA surf rem 6 1/2 (44000175) | SY | 268,152 | $7.50 | $12.42 | $11.00 |
| 54 | Curb rem (44000300) | LF | 254 | $20.00 | $24.00 | $25.11 |
| 55 | Median removal (44003100) | SF | 1,838 | $5.00 | $8.00 | $3.47 |
| 56 | Paved SHLD removal (44004250) | SY | 195,333 | $18.00 | $32.45 | $23.00 |
| 57 | Welded wire reinf (44200050) | SY | 263 | $35.00 | $20.00 | $20.00 |
| 58 | CL A patch T4 15 (44200632) | SY | 7,089 | $200.00 | $342.00 | $342.00 |
| 59 | CL B patch T2 12 (44200994) | SY | 81 | $250.00 | $310.00 | $310.00 |
| 60 | CL B patch T3 12 (44200998) | SY | 98 | $250.00 | $307.00 | $307.00 |
| 61 | CL B patch T4 12 (44201000) | SY | 263 | $250.00 | $304.00 | $304.00 |
| 62 | Dowel bars 1 1/2 (44201299) | EACH | 595 | $25.00 | $30.00 | $30.00 |
| 63 | Patch reinforcement (44213000) | SY | 7,089 | $50.00 | $65.00 | $65.00 |
| 64 | Saw cuts (44213200) | LF | 18,294 | $6.00 | $5.46 | $6.00 |
| 65 | Tie bars 3/4 (44213204) | EACH | 1,504 | $18.00 | $19.00 | $19.00 |
| 66 | Aggregate SHLDS B (48101200) | TON | 31,060 | $50.00 | $53.33 | $0.01 |
| 67 | Aggregate SHLDS B 6 (48101500) | SY | 2,833 | $21.00 | $21.73 | $17.00 |
| 68 | Agg wedge SHLD type B (48102100) | TON | 28,118 | $30.00 | $53.78 | $0.01 |
| 69 | HMA shoulders (48203100) | TON | 11,144 | $114.00 | $136.25 | $126.00 |
| 70 | Conc struct (50300225) | CY | 3 | $4,000.00 | $3,158.31 | $9,500.00 |
| 71 | Reinf bars, epoxy CTD (50800205) | LB | 232 | $20.00 | $6.94 | $5.00 |
| 72 | P cul CL D 1 24 (542D0229) | LF | 571 | $90.00 | $114.26 | $110.00 |
| 73 | P cul CL D 1 30 (542D0235) | LF | 608 | $125.00 | $139.62 | $135.00 |
| 74 | SLP MT ES WG 24",1:6 (54260724) | EACH | 3 | $1,365.00 | $2,875.89 | $2,750.00 |
| 75 | SLP MT ES WG 30",1:6 (54260730) | EACH | 2 | $2,635.00 | $4,196.42 | $3,500.00 |
| 76 | Contr low-streng matl (59300100) | CY | 35 | $285.00 | $413.51 | $413.51 |
| 77 | Pipe underdr T 1 6 (60108106) | LF | 193,658 | $19.75 | $14.86 | $19.58 |
| 78 | Pipe underdrain 6 SP (60108200) | LF | 6,670 | $27.00 | $22.58 | $24.95 |
| 79 | Conc curb TB (60600605) | LF | 255 | $42.00 | $110.00 | $110.00 |
| 80 | Conc median surf 4 (60618300) | SF | 1,728 | $13.00 | $10.50 | $10.50 |
| 81 | Box cul to BE cleaned (60905305) | LF | 849 | $150.00 | $78.40 | $78.40 |
| 82 | Pipe culv cleaned 24 (60920024) | LF | 1,284 | $80.00 | $41.47 | $41.47 |
| 83 | Pipe culv cleaned 30 (60920030) | LF | 312 | $60.00 | $42.67 | $42.67 |
| 84 | Pipe culv cleaned 36 (60920036) | LF | 792 | $75.00 | $50.42 | $50.42 |
| 85 | Pipe culv cleaned 42 (60920042) | LF | 111 | $85.00 | $59.96 | $59.96 |
| 86 | Pipe culv cleaned 60 (60920060) | LF | 526 | $100.00 | $63.27 | $63.27 |
| 87 | SPBGR TY A 6FT posts (63000001) | LF | 6,374 | $33.00 | $31.00 | $31.00 |
| 88 | Traf bar term T6 (63100085) | EACH | 23 | $4,500.00 | $4,500.00 | $4,500.00 |
| 89 | TR bar TRM T1 SPL tan (63100167) | EACH | 18 | $4,200.00 | $3,900.00 | $3,900.00 |
| 90 | TR bar TRM T1 SPL FLR (63100169) | EACH | 5 | $3,800.00 | $4,500.00 | $4,500.00 |
| 91 | Guardrail remov (63200310) | LF | 6,374 | $5.00 | $5.00 | $5.00 |
| 92 | Mod glar SCR sys temp (63800920) | LF | 103,560 | $9.75 | $9.00 | $8.50 |
| 93 | Shoulder rum strip 16 (64200116) | LF | 207,280 | $0.15 | $0.21 | $0.25 |
| 94 | Engr field office A (67000400) | CAL MO | 16 | $5,000.00 | $3,709.21 | $2,500.00 |
| 95 | Mobilization (67100100) | LS | 1 | $4,450,000 | $3,812,050 | $8,794,878 |
| 96 | Traf cont-prot 701402 (70100207) | EACH | 4 | $30,000 | $45,282 | $323,706 |
| 97 | Traf cont-prot 701411 (70100420) | EACH | 8 | $35,000 | $38,147 | $4,900.00 |
| 98 | Traf cont-prot 701406 (70100700) | LS | 1 | $0.01 | $0.01 | $0.01 |
| 99 | Traf cont-prot 701401 (70100800) | LS | 1 | $150,000 | $431,068 | $216,800 |
| 100 | Traf cont-prot 701456 (70100825) | LS | 1 | $25,000 | $264,764 | $88,420 |
| 101 | TR cont surveillance (70103815) | CAL DAY | 90 | $500.00 | $1,440.28 | $575.00 |
| 102 | Changeable message SN (70107025) | CAL DAY | 2,072 | $40.00 | $45.00 | $37.50 |
| 103 | Temp PVT MK LTR & sym paint (70300211) | SF | 28 | $12.00 | $3.00 | $12.00 |
| 104 | Temp PVT MK line 6 - paint (70300241) | LF | 725,478 | $0.31 | $0.35 | $0.30 |
| 105 | Temp PVT MK line 8 - paint (70300251) | LF | 1,420 | $0.80 | $1.00 | $0.75 |
| 106 | Temp PVT MK line 24 - paint (70300281) | LF | 199 | $11.00 | $3.00 | $11.00 |
| 107 | Temp conc barrier (70400100) | LF | 120,300 | $22.00 | $22.68 | $32.00 |
| 108 | Rel temp conc barrier (70400200) | LF | 6,688 | $3.50 | $3.50 | $9.00 |
| 109 | Imp attn temp FRW TL3 (70600270) | EACH | 15 | $6,000.00 | $17,016 | $5,800.00 |
| 110 | Imp attn rel FRW TL3 (70600327) | EACH | 7 | $2,600.00 | $4,815.94 | $2,500.00 |
| 111 | Sign panel T1 (72000100) | SF | 1,036 | $25.00 | $28.00 | $24.50 |
| 112 | Sign panel T2 (72000200) | SF | 96 | $30.00 | $34.00 | $29.00 |
| 113 | Sign panel T3 (72000300) | SF | 64 | $58.00 | $64.00 | $58.50 |
| 114 | Remov sign panel T1 (72400310) | SF | 325 | $8.00 | $16.00 | $7.25 |
| 115 | Remov sign panel T2 (72400320) | SF | 96 | $4.30 | $14.00 | $4.00 |
| 116 | Remov sign panel T3 (72400330) | SF | 64 | $38.50 | $16.00 | $37.50 |
| 117 | Terminal marker - DA (72501000) | EACH | 20 | $44.00 | $50.00 | $50.00 |
| 118 | Metal post TY A (72900100) | LF | 1,426 | $10.25 | $27.00 | $10.00 |
| 119 | Wood sin support (73000100) | LF | 90 | $26.00 | $38.00 | $25.00 |
| 120 | Rem GR MT sin support (73700100) | EACH | 3 | $301.00 | $350.00 | $300.00 |
| 121 | Pref PL PM TD STD LTR/sym (78004600) | SF | 144 | $23.00 | $38.50 | $22.50 |
| 122 | Pref PL PM TD STD L 6 (78004630) | LF | 260,956 | $5.75 | $4.95 | $5.60 |
| 123 | Pref PL PM TD STD L 8 (78004640) | LF | 3,378 | $7.75 | $6.75 | $7.40 |
| 124 | Pref PL PM TD STD L12 (78004660) | LF | 220 | $13.50 | $18.50 | $13.00 |
| 125 | Pref PL PM TD STD L24 (78004720) | LF | 120 | $27.00 | $27.50 | $26.50 |
| 126 | GRV RCSD PM LTR & sym (78011000) | SF | 144 | $1.05 | $5.00 | $1.00 |
| 127 | GRV RCSD PVT MRKG 7 (78011035) | LF | 260,956 | $0.08 | $0.38 | $0.07 |
| 128 | GRV RCSD PVT MRKG 9 (78011045) | LF | 3,378 | $0.17 | $0.39 | $0.15 |
| 129 | GRV RCSD PVT MRKG 13 (78011065) | LF | 220 | $1.45 | $6.00 | $1.40 |
| 130 | GRV RCSD PVT MRKG 25 (78011125) | LF | 120 | $2.10 | $10.00 | $2.00 |
| 131 | Raised refl pavt MKR (78100100) | EACH | 1,522 | $41.00 | $30.00 | $39.75 |
| 132 | Grdrail ref type B (78200006) | EACH | 84 | $15.50 | $10.00 | $10.00 |
| 133 | Raised ref PVT MK rem (78300200) | EACH | 1,373 | $10.00 | $17.94 | $0.01 |
| 134 | PVT MKG rem grinding (78300201) | SF | 444,648 | $0.01 | $0.01 | $0.01 |
| 135 | Elect serv install (80400100) | EACH | 2 | $26,000 | $25,240 | $25,240 |
| 136 | Undrgrd C CNC 4 (81028790) | LF | 600 | $52.00 | $50.00 | $50.00 |
| 137 | Handhole (81400100) | EACH | 4 | $4,650.00 | $4,500.00 | $4,500.00 |
| 138 | UD 2#8 #8G xlpuse 3/4 (81603000) | LF | 5,800 | $21.25 | $20.76 | $20.76 |
| 139 | Lum LED rdwy I (82110009) | EACH | 15 | $2,625.00 | $2,578.00 | $2,578.00 |
| 140 | LT cont basem 240V100 (82500350) | EACH | 2 | $26,000 | $25,650 | $25,650 |
| 141 | LT P A 45MH 15MA (83009600) | EACH | 11 | $7,000.00 | $6,910.00 | $6,910.00 |
| 142 | Light pole FDN 30D (83600300) | LF | 10 | $1,150.00 | $1,100.00 | $1,100.00 |
| 143 | Bkwy dev cou SS SCRN (83800650) | EACH | 15 | $655.00 | $650.00 | $650.00 |
| 144 | Rem LT U no salv (84200600) | EACH | 7 | $2,515.00 | $2,500.00 | $2,500.00 |
| 145 | Rem pole FDN (84200804) | EACH | 6 | $1,050.00 | $1,000.00 | $1,000.00 |
| 146 | Remov lighting contr (84500110) | EACH | 2 | $1,675.00 | $1,640.00 | $1,640.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of June 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.