IDOT contract 95981 bid tabulation
Project Number: 00L8-664 / /, section 25-00088-00-RS. Let by Illinois DOT on August 1, 2025, Cumberland, District 07. 2 bids received; low bid $612,883 by Howell Paving, Inc..
- Owner
- Illinois DOT
- Letting
- 01 AUG 2025
- Pay items
- 15
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Howell Paving, Inc. | $612,883 | Low |
| 2 | Ne-Co Asphalt Co., Inc. | $698,277 | +14% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Howell Paving, Inc. | 2. Ne-Co Asphalt Co., Inc. |
|---|---|---|---|---|---|
| 1 | Aggregate SHLDS SPL (XX005348) | LF | 13,892 | $0.82 | $2.50 |
| 2 | Pavt rem & repl SPL (XX127400) | TON | 225 | $314.81 | $250.00 |
| 3 | Surf rem SPL (X4400104) | SY | 33,960 | $1.50 | $3.00 |
| 4 | Traf cont & prot SPL (X7010216) | LS | 1 | $23,841 | $24,000 |
| 5 | Construction layout (Z0013798) | LS | 1 | $3,472.68 | $7,700.00 |
| 6 | Agg surf course TY B (40200800) | TON | 52 | $244.49 | $95.00 |
| 7 | Bit matls tack CT (40600290) | LB | 15,285 | $1.07 | $1.25 |
| 8 | HMA surf rem butt JT (40600982) | SY | 148 | $25.99 | $41.00 |
| 9 | Temporary ramp (40600990) | SY | 80 | $49.78 | $40.00 |
| 10 | HMA SC IL-9.5 C N70 (40604052) | TON | 2,855 | $117.94 | $140.00 |
| 11 | Incidental HMA surf (40800050) | TON | 39 | $446.49 | $220.00 |
| 12 | Agg wedge SHLD type B (48102100) | TON | 305 | $58.90 | $55.00 |
| 13 | Mobilization (67100100) | LS | 1 | $36,152 | $12,000 |
| 14 | Short term pavt mking (70300100) | LF | 1,263 | $2.16 | $1.00 |
| 15 | SHRT TRM pavt MK rem (70300150) | SF | 417 | $10.87 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of August 1, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.