Ne-Co Asphalt Co., Inc.: IDOT bid record

Ne-Co Asphalt Co., Inc. submitted 28 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 10 of them (36%). When it was not low, its total sat a median +15% above the low bid.

Owner
Illinois DOT
Low bid volume
$10,762,664
Latest bid
31 JUL 2026
Data through
18 SEP 2026
28Bids
10Low bids
36Win rate, percent
+15%Median gap to the low bid when not low, 18 bids

By year

YearBidsLow bidsWin rate
20215120%
20228338%
20234250%
20245360%
20253133%
2026300%
Ne-Co Asphalt Co., Inc., IDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
District 0725936%
District 053133%
Ne-Co Asphalt Co., Inc., IDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Bit matls tack CT40600290LB2115 (71%)$1.00$0.01
Temporary ramp40600990SY1815 (83%)$15.00$19.46
Incidental HMA surf40800050TON1814 (78%)$185.00$250.00
Agg wedge SHLD type B48102100TON1612 (75%)$40.50$50.00
Paint PVT MK line 478001110LF1612 (75%)$0.17$1.00
Raised refl pavt MKR78100100EACH1412 (86%)$37.43$48.00
Short term pavt mking70300100LF1910 (53%)$1.00$1.01
SHRT TRM pavt MK rem70300150SF159 (60%)$3.00$1.20
Long joint sealant40600370LF149 (64%)$2.39$3.30
THPL PVT MK LTR & sym78000100SF109 (90%)$9.25$5.75
THPL PVT MK line 1278000600LF98 (89%)$4.00$3.10
THPL PVT MK line 2478000650LF98 (89%)$9.00$6.00
Ne-Co Asphalt Co., Inc., IDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Howell Paving, Inc.2417 of 24
Open Road Paving Company LLC10 of 1
Ramirez Diversified Services, LLC11 of 1
Ne-Co Asphalt Co., Inc., IDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
31 JUL 202674829District 07Section (2,2Z)2 of 2$3,316,240+9.0%
31 JUL 202674E43District 07Section D72 of 2$119,180+94%
12 JUN 202674D54District 07Section (7,6)&(5,4)RS-32 of 2$1,939,522+4.0%
01 AUG 202595981District 07Project Number: 00L8-664 / /, section 25-00088-00-RS2 of 2$698,277+14%
25 APR 202595975District 07Charleston, section 24-00126-00-RS1 of 1$356,482Low
25 APR 202595976District 07Project Number: 3Gpk-596 / /, section 23-00296-00-RS2 of 2$2,396,171+16%
14 JUN 202495960District 07Project Number: Biv7-939 / /, section 22-00191-00-SD1 of 2$2,999,290Low, 7.0% under the second
26 APR 202474C41District 07Section (8,9,10)RS-41 of 2$1,284,222Low, 10% under the second
26 APR 202474C86District 07Section D72 of 2$299,550+3.0%
08 MAR 202474903District 07Section 10RS-22 of 2$5,685,172+17%
08 MAR 202474A64District 07Section (111,1 of 2$1,801,329Low, 2.0% under the second
16 JUN 202374812District 07Section 1112 of 2$3,560,100+29%
16 JUN 202374B23District 07Section (22,5)RS-31 of 1$1,477,664Low
28 APR 202370E29District 05Section D51 of 2$416,368Low, 47% under the second
20 JAN 202391623District 05Project Number: Aulw-716 / /, section 22-00140-00-RS2 of 2$1,189,998+3.0%
23 SEP 202295926District 07Project Number: 8V9U-618 / /, section 20-00031-00-SD2 of 2$1,097,001+38%
29 APR 202274A21District 07Section (113R-5)&(114RS-4)2 of 2$1,049,474+7.0%
29 APR 202274A23District 07Section (7,6)RS-32 of 2$787,114+6.0%
11 MAR 202270B03District 05Section 120RS-42 of 2$3,354,064+25%
11 MAR 202274964District 07Section (1,2)RS-41 of 2$838,284Low, 12% under the second
11 MAR 202274A19District 07Section (F-X)RS-2,(113,120)RS-21 of 2$1,179,401Low, 8.0% under the second
11 MAR 202295913District 07Project Number: 77Vp-507 / /, section 21-00187-00-RS1 of 2$178,093Low, 15% under the second
21 JAN 202274966District 07Section (CF-X,D-X)RS-22 of 2$759,5900.0%
23 APR 202174A35District 07Section D72 of 2$549,767+11%
05 MAR 202174943District 07Section 12RS-22 of 2$3,269,583+31%
Ne-Co Asphalt Co., Inc.: latest IDOT bids in the data

How this record was read

IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

  • Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy