IDOT contract 95975 bid tabulation
Charleston, section 24-00126-00-RS. Let by Illinois DOT on April 25, 2025, Coles, District 07. 1 bid received; low bid $356,482 by Ne-Co Asphalt Co., Inc..
- Owner
- Illinois DOT
- Letting
- 25 APR 2025
- Pay items
- 18
- Data through
- 18 SEP 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Ne-Co Asphalt Co., Inc. | $356,482 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ne-Co Asphalt Co., Inc. |
|---|---|---|---|---|
| 1 | HMA surf rem var DP (X4401198) | SY | 975 | $18.00 |
| 2 | Bit matls tack CT (40600290) | LB | 3,300 | $1.00 |
| 3 | Long joint sealant (40600370) | LF | 3,000 | $5.50 |
| 4 | HMA surf rem butt JT (40600982) | SY | 77 | $25.00 |
| 5 | HMA SC IL-9.5 C N70 (40604052) | TON | 100 | $210.00 |
| 6 | P HMA SC IL-9.5 D N90 (40604164) | TON | 708 | $154.00 |
| 7 | HMA surf rem 1 1/2 (44000155) | SY | 7,800 | $5.00 |
| 8 | CL D patch T1 10 (44201761) | SY | 176 | $225.00 |
| 9 | CL D patch T2 10 (44201765) | SY | 152 | $225.00 |
| 10 | CL D patch T4 10 (44201771) | SY | 27 | $225.00 |
| 11 | Mobilization (67100100) | LS | 1 | $14,500 |
| 12 | TR cont & prot 701501 (70102620) | LS | 1 | $28,500 |
| 13 | Short term pavt mking (70300100) | LF | 300 | $3.00 |
| 14 | SHRT TRM pavt MK rem (70300150) | SF | 100 | $9.00 |
| 15 | THPL PVT MK line 4 (78000200) | LF | 700 | $5.00 |
| 16 | THPL PVT MK line 6 (78000400) | LF | 1,100 | $7.00 |
| 17 | GRV RCSD PVT MRKG 5 (78011025) | LF | 700 | $5.00 |
| 18 | GRV RCSD PVT MRKG 7 (78011035) | LF | 1,100 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.