IDOT letting results, April 26, 2024
212 contracts let by Illinois DOT on April 26, 2024, $579,512,633 in low bids, a median of 2 bidders per contract.
- Owner
- Illinois DOT
- Contracts
- 212
- Low bids, total
- $579,512,633
- Data through
- 18 SEP 2026
Contracts let that day
| Contract | Project | District | Bids | Low bidder | Low bid | Second bid | Gap | Source |
|---|---|---|---|---|---|---|---|---|
| 61H34 | Plainfield, section 06-00040-00-FP | District 01 | 4 | D. Construction, Inc. | $53,042,202 | $56,222,513 | +6.0% | IDOT |
| 60P75 | Section (56&57)R-4 | District 01 | 6 | R. W. Dunteman Company | $38,948,948 | $41,296,324 | +6.0% | IDOT |
| 70C24 | Section (15,21-25,21-26,27)RS-2 | District 05 | 1 | Howell Paving, Inc. | $37,020,452 | IDOT | ||
| 61D34 | Project Number: Ajkb-163 / /, section 12-00147-11-CH | District 01 | 5 | D. Construction, Inc. | $24,310,460 | $26,416,580 | +9.0% | IDOT |
| 68880 | Section (72-2BVB)BRR | District 04 | 2 | Stark Excavating, Inc. | $22,989,697 | $23,390,500 | +2.0% | IDOT |
| 62380 | Section 99-4B-2-BR | District 01 | 1 | D. Construction, Inc. | $19,992,722 | IDOT | ||
| 70254 | Section (10-33HB-2)BR | District 05 | 4 | ICC Group Inc. | $17,670,000 | $18,493,935 | +5.0% | IDOT |
| 62L31 | Section 2020-143-BR | District 01 | 2 | Lorig Construction Company | $15,385,971 | $19,150,000 | +24% | IDOT |
| 62P76 | Section 2021-189-NW | District 01 | 3 | Lorig Construction Company | $14,991,712 | $15,117,696 | +1.0% | IDOT |
| 74A08 | Section (4-2)RS-5,(3-2)RS-2 | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $9,731,126 | IDOT | ||
| 76M86 | Section 82-3, | District 08 | 4 | Gerstner Electric, Inc. | $8,855,930 | $12,570,171 | +42% | IDOT |
| 61J14 | Project Number: 26Xm-359 / /, section 14-00124-04-BR | District 01 | 3 | Dunnet Bay Construction Company | $8,419,194 | $9,040,309 | +7.0% | IDOT |
| 62T42 | Section FAU | District 01 | 4 | Builders Paving, LLC | $8,297,082 | $8,347,275 | +1.0% | IDOT |
| 62M25 | Section 2020-187-SW | District 01 | 2 | Payne & Dolan, Inc. | $7,564,874 | $10,525,000 | +39% | IDOT |
| 74458 | Section (20RS-4-1),20RS-3 | District 07 | 1 | Howell Paving, Inc. | $7,439,035 | IDOT | ||
| 89835 | City Of Peoria, section 20-00387-00-PV | District 04 | 3 | Gensini Excavating, Inc. | $7,079,330 | $7,286,728 | +3.0% | IDOT |
| 62P50 | Section 2021-134-TS | District 01 | 2 | R. W. Dunteman Company | $7,068,889 | $7,624,199 | +8.0% | IDOT |
| 72304 | Section 68-5(RS-4,CLV) | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $6,678,600 | IDOT | ||
| 70E12 | Section (101,102,103,57-24)RS | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $6,488,552 | IDOT | ||
| 74986 | Section D7 | District 07 | 1 | Howell Paving, Inc. | $6,034,809 | IDOT | ||
| 78A21 | Section (112,113,114)RS-3 | District 09 | 2 | E. T. Simonds Construction Company | $5,862,388 | $5,919,296 | +1.0% | IDOT |
| 66C45 | Section 116RS-2,117RS-3 | District 03 | 1 | Iroquois Paving Corporation | $5,775,587 | IDOT | ||
| 74B18 | Section (129, | District 07 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $5,507,664 | IDOT | ||
| 72M82 | Section 109Z(RS-3,SW,TS-2) | District 06 | 1 | Kinney Contractors, Inc. | $5,399,080 | IDOT | ||
| 72893 | Section (84-2BR-1)SR,BDR | District 06 | 1 | Freesen, a div of UCM, Inc. | $5,322,947 | IDOT | ||
| 61K34 | Lindenhurst, section 18-00032-01-PV | District 01 | 3 | Lenny Hoffman Excavating, Inc. | $5,300,754 | $5,546,324 | +5.0% | IDOT |
| 72282 | Section 34RS-4;(34BR)BDR,BRR | District 06 | 3 | Truman L. Flatt & Sons Co., Inc. | $5,162,775 | $5,401,192 | +5.0% | IDOT |
| 62L16 | Section 2020-044-RS | District 01 | 3 | Peter Baker & Son Co. | $5,133,133 | $5,169,576 | +1.0% | IDOT |
| 72189 | Section (84-5-1VHB)BDR,BP,BJR,BRR | District 06 | 2 | Sangamo Construction Company | $5,085,109 | $5,270,000 | +4.0% | IDOT |
| 64T14 | Section (12-15D,20MFT,68MFT,113)RS&(68MFT,113)SR | District 02 | 3 | Advanced Asphalt Company | $4,786,212 | $5,670,756 | +18% | IDOT |
| 46642 | Section D2 | District 02 | 3 | Precision Pavement Markings Inc. | $4,661,960 | $4,797,750 | +3.0% | IDOT |
| 70B07 | Section (5,79,72)RS-1&(34)RS-2&85-1 | District 05 | 2 | Open Road Paving Company LLC | $4,479,683 | $4,647,356 | +4.0% | IDOT |
| 72M79 | Section 101RS-12,CLV,I-1 | District 06 | 2 | P. H. Broughton & Sons, Inc. | $4,308,264 | $4,505,267 | +5.0% | IDOT |
| 61K32 | Wheaton, section 20-00123-00-PV | District 01 | 6 | Plote Construction, Inc. | $4,291,788 | $4,414,500 | +3.0% | IDOT |
| 64S27 | Section (195(1B-1,1VB,1HB-5,2B))BDR | District 02 | 2 | Martin & Company Excavating | $4,099,617 | $4,395,765 | +7.0% | IDOT |
| 74443 | Section (3,2B)B-1 | District 07 | 2 | Sangamo Construction Company | $3,650,480 | $4,271,271 | +17% | IDOT |
| 93818 | Jacksonville, section 17-00126-01-RS | District 06 | 1 | K. E. Vas Company | $3,387,270 | IDOT | ||
| 62R53 | Section FAU | District 01 | 2 | Builders Paving, LLC | $3,359,808 | $3,981,902 | +19% | IDOT |
| 64T15 | Section (115RS)RS | District 02 | 2 | Martin & Company Excavating | $3,350,526 | $3,562,707 | +6.0% | IDOT |
| 68I01 | Section (X3-16RA)I-15 | District 04 | 2 | Gensini Excavating, Inc. | $3,190,549 | $3,853,149 | +21% | IDOT |
| 46641 | Section D6 | District 06 | 1 | P & P Construction Co. | $2,796,520 | IDOT | ||
| 62P34 | Section 2021-109-RS | District 01 | 4 | Plote Construction, Inc. | $2,781,187 | $2,931,738 | +5.0% | IDOT |
| 78A19 | Section (1X-1)RS-5 | District 09 | 2 | Samron Midwest Contracting, Inc. | $2,745,072 | $3,236,415 | +18% | IDOT |
| 62W46 | Section 2023-924-TS,MS | District 01 | 5 | Traffic Control and Protection LLC dba High Star Traffic | $2,614,163 | $2,799,990 | +7.0% | IDOT |
| 61K35 | Crystal Lake, section 22-00134-00-TL | District 01 | 4 | Curran Contracting Company | $2,591,532 | $2,693,347 | +4.0% | IDOT |
| 66M98 | Section (5,K,H)RS-1 | District 03 | 1 | Iroquois Paving Corporation | $2,586,271 | IDOT | ||
| 62P12 | Section 2021-075-BDR | District 01 | 3 | Martam Construction Incorporated | $2,534,342 | $2,679,124 | +6.0% | IDOT |
| 87831 | Project Number: 9P1Q-781 / /, section 20-00146-04-RS | District 03 | 2 | Kankakee Valley Construction Company, Inc. | $2,522,672 | $2,871,208 | +14% | IDOT |
| 87826 | Project Number: Ci0B-326 / /, section 20-00274-00-RS | District 03 | 4 | Curran Contracting Company | $2,522,533 | $2,524,784 | 0.0% | IDOT |
| 95957 | Project Number: A9Ji-752 / /, section 21-00071-00-RS | District 07 | 1 | Howell Paving, Inc. | $2,438,672 | IDOT | ||
| 76T65 | Section (133, | District 08 | 2 | Charles E. Mahoney Co. | $2,396,248 | $2,498,813 | +4.0% | IDOT |
| 61K33 | Downers Grove, section 22-00118-00-PV | District 01 | 3 | K-Five Construction Corporation | $2,384,159 | $2,555,668 | +7.0% | IDOT |
| 62M37 | Section 2020-182-BR | District 01 | 3 | Lorig Construction Company | $2,360,619 | $2,485,792 | +5.0% | IDOT |
| 61J08 | New Lenox, section 19-00043-00-CH | District 01 | 4 | Austin Tyler Construction, Inc. | $2,355,249 | $2,598,463 | +10% | IDOT |
| 62U84 | Section FAP | District 01 | 4 | Martam Construction Incorporated | $2,186,382 | $2,271,355 | +4.0% | IDOT |
| 76T59 | Section (8,9)RS-3,10-1RS-2 | District 08 | 4 | Samron Midwest Contracting, Inc. | $2,173,724 | $2,307,000 | +6.0% | IDOT |
| 99717 | Carbondale, section 21-00147-00-BT | District 09 | 3 | Samron Midwest Contracting, Inc. | $2,139,256 | $2,201,472 | +3.0% | IDOT |
| 64N90 | Section (103MFT, | District 02 | 2 | Langman Construction, Inc. | $2,106,327 | $2,108,550 | 0.0% | IDOT |
| 87847 | Project Number: Jnbs-680 / /, section 21-00392-01-RS | District 03 | 3 | Curran Contracting Company | $2,100,248 | $2,246,372 | +7.0% | IDOT |
| 62P69 | Section 2021-086-BDR | District 01 | 4 | Martam Construction Incorporated | $2,061,184 | $2,163,610 | +5.0% | IDOT |
| 72219 | Section (135X,B-1)BJR,BDR | District 06 | 1 | Sangamo Construction Company | $2,016,363 | IDOT | ||
| 62R75 | Section FAP | District 01 | 2 | D. Construction, Inc. | $1,984,514 | $2,624,163 | +32% | IDOT |
| 64L95 | Section (W-15D,115)RS-4 | District 02 | 4 | Rock Road Companies, Inc. | $1,979,788 | $2,049,588 | +4.0% | IDOT |
| 72230 | Section (DX)RS,SW-1 | District 06 | 1 | Illinois Valley Paving, a div of UCM, Inc. | $1,955,410 | IDOT | ||
| 87792 | Project Number: Zh0P-871 / /, section 19-00174-00-BR | District 03 | 2 | Riber Construction, Inc. | $1,942,958 | $1,951,458 | 0.0% | IDOT |
| 90392 | Section 40(W,RS) | District 05 | 2 | Cross Construction, Inc. | $1,934,015 | $2,142,309 | +11% | IDOT |
| 62R91 | Section FAP | District 01 | 4 | Martam Construction Incorporated | $1,888,608 | $2,171,979 | +15% | IDOT |
| 70G75 | Section (125,126,127)RS-3 | District 05 | 1 | Rowe Construction, a div of UCM, Inc. | $1,818,351 | IDOT | ||
| 64S68 | Section 138RS | District 02 | 3 | Advanced Asphalt Company | $1,798,693 | $2,071,828 | +15% | IDOT |
| 87791 | Project Number: 9Lhd-112 / /, section 19-00178-00-BR | District 03 | 2 | D. Construction, Inc. | $1,773,338 | $2,137,297 | +21% | IDOT |
| 68F84 | Section (8R-VB)BRR | District 04 | 1 | Brandt Construction Co. | $1,768,094 | IDOT | ||
| 76T55 | Section DIST | District 08 | 1 | Electrico, Inc. | $1,753,628 | IDOT | ||
| 62T69 | Section FAP | District 01 | 2 | Peter Baker & Son Co. | $1,732,377 | $1,886,688 | +9.0% | IDOT |
| 62R65 | Section FAI | District 01 | 3 | ERA-Valdivia Contractors, Inc. | $1,693,659 | $1,773,300 | +5.0% | IDOT |
| 78A62 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $1,659,506 | $1,909,304 | +15% | IDOT |
| 74857 | Section (24 | District 07 | 2 | E. T. Simonds Construction Company | $1,606,937 | $1,951,951 | +21% | IDOT |
| 76T60 | Section (74-1,75,75-1)RS-4 | District 08 | 1 | The Kilian Corporation | $1,603,498 | IDOT | ||
| 61K29 | Schiller Park, section 23-00089-00-RS | District 01 | 6 | Builders Paving, LLC | $1,542,137 | $1,588,398 | +3.0% | IDOT |
| 76T34 | Section 29-RS-3, | District 08 | 2 | Christ Bros. Asphalt, Inc. | $1,504,972 | $1,581,913 | +5.0% | IDOT |
| 78A08 | Section D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,493,637 | $1,505,269 | +1.0% | IDOT |
| 61K42 | Project Number: Xuzd-086 / /, section 19-00512-00-SP | District 01 | 2 | H & H Electric Co. | $1,455,916 | $1,779,370 | +22% | IDOT |
| 61K00 | Addison, section 22-00108-00-RS | District 01 | 7 | R. W. Dunteman Company | $1,427,498 | $1,679,274 | +18% | IDOT |
| 62U87 | Section 2023 | District 01 | 4 | Schroeder Asphalt Services, Inc. | $1,375,038 | $1,382,595 | +1.0% | IDOT |
| 72265 | Section (107,108,109)Q | District 06 | 2 | A. C. Pavement Striping Co. | $1,319,116 | $1,833,568 | +39% | IDOT |
| 62T33 | Section FAU | District 01 | 1 | D. Construction, Inc. | $1,303,768 | IDOT | ||
| 95931 | Project Number: Xcnx-049 / /, section 20-00130-00-BR | District 07 | 2 | Samron Midwest Contracting, Inc. | $1,292,081 | $1,389,446 | +8.0% | IDOT |
| 74C41 | Section (8,9,10)RS-4 | District 07 | 2 | Ne-Co Asphalt Co., Inc. | $1,284,222 | $1,418,585 | +10% | IDOT |
| 62P06 | Section 2021-068-CR | District 01 | 3 | Lorig Construction Company | $1,281,947 | $1,289,686 | +1.0% | IDOT |
| 78A22 | Section D9 | District 09 | 2 | Samron Midwest Contracting, Inc. | $1,194,840 | $1,216,122 | +2.0% | IDOT |
| 76T61 | Section 9-1RS-4 | District 08 | 4 | Samron Midwest Contracting, Inc. | $1,157,685 | $1,222,000 | +6.0% | IDOT |
| 62T85 | Section FAU | District 01 | 5 | Lorig Construction Company | $1,150,113 | $1,215,724 | +6.0% | IDOT |
| 95949 | Project Number: Xdpc-892 / /, section 21-00129-00-FP | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $1,138,118 | IDOT | ||
| 95947 | Neoga, section 21-00008-01-SW | District 07 | 1 | McCarthy Improvement Company | $1,130,147 | IDOT | ||
| 89827 | Galesburg, section 21-00700-13-RS | District 04 | 2 | Gunther Construction, a div of UCM, Inc. | $1,097,188 | $1,107,777 | +1.0% | IDOT |
| 64P58 | Section (104,105)RS-2 | District 02 | 2 | Martin & Company Excavating | $1,070,501 | $1,250,081 | +17% | IDOT |
| 85757 | Project Number: Rc5M-386 / /, section 23-00355-00-RS | District 02 | 2 | Martin & Company Excavating | $1,065,955 | $1,175,728 | +10% | IDOT |
| 87794 | Project Number: 62Lm-754 / /, section 22-00118-01-BR | District 03 | 1 | Iroquois Paving Corporation | $1,057,026 | IDOT | ||
| 97807 | Edwardsville, section 21-00111-03-BT | District 08 | 4 | DMS Contracting, Inc. | $1,053,422 | $1,068,736 | +1.0% | IDOT |
| 62W01 | Section 2023 | District 01 | 1 | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company | $1,029,731 | IDOT | ||
| 62R69 | Section FAU | District 01 | 4 | Gallagher Asphalt Corporation | $1,015,841 | $1,057,963 | +4.0% | IDOT |
| 46645 | Section D2 | District 02 | 2 | Precision Pavement Markings Inc. | $998,000 | $1,746,250 | +75% | IDOT |
| 85759 | Project Number: Ppnt-861 / /, section 22-0261-00-RS | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $979,286 | $1,037,820 | +6.0% | IDOT |
| 68H26 | Section D4 | District 04 | 1 | SKC Construction, Inc. | $973,284 | IDOT | ||
| 95934 | Project Number: Xxrx-514 / /, section 10-00075-00-BR | District 07 | 3 | C-Hill Civil Contractors, Inc. | $969,999 | $1,038,960 | +7.0% | IDOT |
| 72223 | Section (1BR)BDR,BRR,BJR,I | District 06 | 2 | County Contractors, Inc. | $969,518 | $1,003,147 | +3.0% | IDOT |
| 87824 | Project Number: Qsx6-721 / /, section 20-00274-00-RS | District 03 | 2 | Advanced Asphalt Company | $949,527 | $981,414 | +3.0% | IDOT |
| 62V18 | Section 2023 | District 01 | 2 | D. Construction, Inc. | $932,635 | $1,746,751 | +87% | IDOT |
| 74C67 | Section D7 | District 07 | 4 | Three Star Painting, Inc. | $920,000 | $1,073,155 | +17% | IDOT |
| 78920 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $912,047 | $948,723 | +4.0% | IDOT |
| 89831 | Project Number: N9Ly-312 / /, section 22-00056-00-SP | District 04 | 2 | Advanced Asphalt Company | $873,700 | $925,579 | +6.0% | IDOT |
| 62R43 | Section FAU | District 01 | 4 | Gallagher Asphalt Corporation | $871,931 | $978,393 | +12% | IDOT |
| 61K41 | Palos Heights, section 19-00058-00-BT | District 01 | 7 | D. Construction, Inc. | $870,603 | $891,540 | +2.0% | IDOT |
| 74C73 | Section D7 | District 07 | 3 | Earth Worx Solutions LLC | $856,417 | $1,077,564 | +26% | IDOT |
| 68H86 | Section (103,48)PP,DR | District 04 | 3 | Stark Excavating, Inc. | $834,893 | $911,744 | +9.0% | IDOT |
| 64P27 | Section 129RS-2 | District 02 | 2 | Curran Contracting Company | $800,800 | $834,818 | +4.0% | IDOT |
| 74A85 | Section D7 | District 07 | 4 | Samron Midwest Contracting, Inc. | $790,790 | $804,849 | +2.0% | IDOT |
| 66N44 | Section (849E)MG,RS | District 03 | 2 | H. J. Eppel & Co. | $781,331 | $853,139 | +9.0% | IDOT |
| 62V97 | Section 2023 | District 01 | 3 | K-Five Construction Corporation | $780,422 | $782,486 | 0.0% | IDOT |
| 72498 | Section 110RS-3; | District 06 | 3 | Truman L. Flatt & Sons Co., Inc. | $752,964 | $760,976 | +1.0% | IDOT |
| 87820 | Project Number: Yv6Z-643 / /, section 20-00199-04-BR | District 03 | 2 | Tobey's Construction & Cartage, Inc. | $737,652 | $754,724 | +2.0% | IDOT |
| 95951 | Project Number: 04P1-736 / /, section 21-00081-01-DR | District 07 | 1 | Sangamo Construction Company | $729,047 | IDOT | ||
| 76T32 | Section (127, | District 08 | 3 | The Kilian Corporation | $721,636 | $843,491 | +17% | IDOT |
| 70H14 | Section D5 | District 05 | 4 | Three Star Painting, Inc. | $707,507 | $939,600 | +33% | IDOT |
| 76T29 | Section (6-2)RS-3,6-23RS-2,54-2RS-3 | District 08 | 2 | Christ Bros. Asphalt, Inc. | $694,979 | $742,458 | +7.0% | IDOT |
| 70753 | Section 113CR | District 05 | 4 | Stark Excavating, Inc. | $683,695 | $694,495 | +2.0% | IDOT |
| 62U81 | Section CH | District 01 | 5 | Peter Baker & Son Co. | $678,134 | $745,994 | +10% | IDOT |
| 97823 | Project Number: 6Zqt-622 / /, section 19-11004-00-BR | District 08 | 4 | C-Hill Civil Contractors, Inc. | $669,999 | $793,930 | +18% | IDOT |
| 95956 | Project Number: 8Xix-355 / /, section 21-00087-00-RS | District 07 | 1 | Howell Paving, Inc. | $647,145 | IDOT | ||
| 62T00 | Section FAP | District 01 | 3 | Martam Construction Incorporated | $637,548 | $743,894 | +17% | IDOT |
| 74C72 | Section D7 | District 07 | 1 | Ramirez Diversified Services, LLC | $628,179 | IDOT | ||
| 76T54 | Section 60-(14,15,16)RS | District 08 | 1 | Charles E. Mahoney Co. | $626,537 | IDOT | ||
| 97828 | Greenville, section 22-00044-01-RS | District 08 | 2 | The Kilian Corporation | $621,353 | $632,963 | +2.0% | IDOT |
| 76T42 | Section 3P | District 08 | 5 | Civil Coatings and Construction Inc. | $593,796 | $637,325 | +7.0% | IDOT |
| 76T64 | Section 82-1-PS-8 | District 08 | 2 | Haier Plumbing and Heating, Inc. | $590,000 | $597,770 | +1.0% | IDOT |
| 64S30 | Section (102 | District 02 | 3 | Martin & Company Excavating | $585,814 | $750,345 | +28% | IDOT |
| 66N40 | Section (53-6)I-2 | District 03 | 2 | A. C. Pavement Striping Co. | $577,571 | $669,554 | +16% | IDOT |
| 61K15 | Sugar Grove, section 18-00030-00-BT | District 01 | 3 | D. Construction, Inc. | $571,413 | $1,088,224 | +90% | IDOT |
| 64S95 | Section (37-2-1,37-2,37-3)PP-2023 | District 02 | 4 | G. M. Sipes Construction, Inc. | $553,125 | $609,947 | +10% | IDOT |
| 66N93 | Section 006(22-B, | District 03 | 4 | ERA-Valdivia Contractors, Inc. | $548,417 | $597,281 | +9.0% | IDOT |
| 74C82 | Section D7 | District 07 | 2 | Bodine Electric of Decatur | $544,837 | $671,170 | +23% | IDOT |
| 61K13 | Addison, section 23-00110-00-SW | District 01 | 8 | R. W. Dunteman Company | $544,000 | $544,736 | 0.0% | IDOT |
| 64T22 | Section ((102,103)(20)(19,20)(19,9-15D,103))SR | District 02 | 4 | Phoenix Corporation of the Quad Cities | $539,770 | $593,394 | +10% | IDOT |
| 76R59 | Section DIST | District 08 | 2 | Christ Bros. Asphalt, Inc. | $539,212 | $570,276 | +6.0% | IDOT |
| 72E36 | Section D6 | District 06 | 2 | Capitol Construction Group, LLC d/b/a Egizii Electric | $510,682 | $617,900 | +21% | IDOT |
| 62P05 | Section 2021-067-BDR | District 01 | 6 | D. Construction, Inc. | $510,572 | $539,931 | +6.0% | IDOT |
| 78825 | Section 12SLP-1 | District 09 | 2 | Sierra Bravo Contractors, LLC | $508,955 | $682,682 | +34% | IDOT |
| 70D26 | Section (14)I | District 05 | 3 | Cross Construction, Inc. | $500,000 | $604,258 | +21% | IDOT |
| 87815 | Project Number: 7Vph-466 / /, section 07-12125-00-BR | District 03 | 5 | Curnyn Construction Co. | $499,288 | $569,786 | +14% | IDOT |
| 74C88 | Section D7 | District 07 | 1 | Bodine Electric of Decatur | $467,940 | IDOT | ||
| 62W06 | Section 2023 | District 01 | 2 | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company | $456,692 | $499,624 | +9.0% | IDOT |
| 64S61 | Section (177-4-2)BDR | District 02 | 3 | Civil Constructors, Inc. d/b/a/ Helm Civil | $449,840 | $637,847 | +42% | IDOT |
| 64S55 | Section D2 | District 02 | 2 | Civil Constructors, Inc. d/b/a/ Helm Civil | $442,965 | $589,097 | +33% | IDOT |
| 66N53 | Section (22B-1)BRR | District 03 | 3 | Gensini Excavating, Inc. | $431,733 | $463,974 | +7.0% | IDOT |
| 61K39 | Montgomery, section 23-00062-00-RS | District 01 | 4 | Geneva Construction Company | $431,447 | $432,414 | 0.0% | IDOT |
| 70G81 | Section (36)I | District 05 | 1 | William Charles Construction Company, LLC | $430,000 | IDOT | ||
| 64S65 | Section (110BR-1)BR | District 02 | 5 | Martin & Company Excavating | $402,242 | $437,289 | +9.0% | IDOT |
| 72E35 | Section D6 | District 06 | 1 | Bodine Electric of Decatur | $394,130 | IDOT | ||
| 76R37 | Section 106RS-4 | District 08 | 2 | DeLaurent Construction Co., Inc. | $393,454 | $397,309 | +1.0% | IDOT |
| 68H91 | Section D4 | District 04 | 3 | Varsity Striping & Construction Co. | $385,631 | $950,166 | +146% | IDOT |
| 76T41 | Section 82-8P, | District 08 | 4 | ERA-Valdivia Contractors, Inc. | $379,102 | $476,050 | +26% | IDOT |
| 78A06 | Section (41-B)BDR-1 | District 09 | 2 | Samron Midwest Contracting, Inc. | $376,698 | $386,783 | +3.0% | IDOT |
| 76T40 | Section 14-12HB-P, | District 08 | 5 | Civil Coatings and Construction Inc. | $376,650 | $379,023 | +1.0% | IDOT |
| 74C80 | Section D7 | District 07 | 2 | G. M. Sipes Construction, Inc. | $352,266 | $510,720 | +45% | IDOT |
| 76R94 | Section 82-1L-1 | District 08 | 2 | Gerstner Electric, Inc. | $351,983 | $602,984 | +71% | IDOT |
| 76T45 | Section DIST | District 08 | 3 | Gerstner Electric, Inc. | $346,843 | $370,643 | +7.0% | IDOT |
| 78999 | Section 109CR-1;102CR-1 | District 09 | 3 | Samron Midwest Contracting, Inc. | $338,757 | $435,215 | +28% | IDOT |
| 74C71 | Section D7 | District 07 | 1 | Ambraw Asphalt Materials, Inc. | $338,337 | IDOT | ||
| 74C43 | Section D7 | District 07 | 2 | A. C. Pavement Striping Co. | $329,696 | $453,457 | +38% | IDOT |
| 68H85 | Section 48-CLV-1 | District 04 | 3 | Otto Baum Company, Inc. | $324,600 | $372,000 | +15% | IDOT |
| 87829 | Project Number: 000R-893 / /, section 19-00068-03-RS | District 03 | 2 | Kankakee Valley Construction Company, Inc. | $323,707 | $363,010 | +12% | IDOT |
| 64T03 | Section D2 | District 02 | 1 | Northern Contracting, Inc. | $319,684 | IDOT | ||
| 78A60 | Section D9 | District 09 | 1 | Gerstner Electric, Inc. | $319,167 | IDOT | ||
| 66N54 | Section (123BR-1)SLP | District 03 | 1 | Iroquois Paving Corporation | $313,415 | IDOT | ||
| 76T46 | Section 119-1BR-1 | District 08 | 3 | Samron Midwest Contracting, Inc. | $311,703 | $391,976 | +26% | IDOT |
| 72735 | Section D6 | District 06 | 2 | Capitol Construction Group, LLC d/b/a Egizii Electric | $303,500 | $435,750 | +44% | IDOT |
| 66N97 | Section (20R)TS-1 | District 03 | 1 | Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC | $299,323 | IDOT | ||
| 78A10 | Section D9 | District 09 | 2 | E. T. Simonds Construction Company | $294,033 | $349,490 | +19% | IDOT |
| 68J05 | Section (9)TS-1 | District 04 | 2 | Oberlander Electric Co. | $291,000 | $311,263 | +7.0% | IDOT |
| 74C74 | Section D7 | District 07 | 2 | Kinney Contractors, Inc. | $289,978 | $351,748 | +21% | IDOT |
| 74C86 | Section D7 | District 07 | 2 | Ramirez Diversified Services, LLC | $289,930 | $299,550 | +3.0% | IDOT |
| 95954 | Sumner, section 22-00005-00-SW | District 07 | 2 | Shores Builders, Inc. | $289,794 | $305,578 | +5.0% | IDOT |
| 76T20 | Section 131RS-3 | District 08 | 2 | The Kilian Corporation | $272,718 | $290,138 | +6.0% | IDOT |
| 61K31 | Alsip, section 23-00103-00-SW | District 01 | 6 | Davis Concrete Construction Co. | $268,435 | $305,503 | +14% | IDOT |
| 61K30 | Tinley Park, section 21-00122-00-BT | District 01 | 4 | D. Construction, Inc. | $264,969 | $299,452 | +13% | IDOT |
| 76T53 | Section DIST | District 08 | 3 | Electrico, Inc. | $263,300 | $272,719 | +4.0% | IDOT |
| 76L34 | Section 95-(1,2)CJS-1 | District 08 | 3 | Complete Asphalt Service Co. | $259,280 | $286,646 | +11% | IDOT |
| 62T45 | Section FAU | District 01 | 7 | Lorig Construction Company | $256,821 | $265,476 | +3.0% | IDOT |
| 76T51 | Section 82DM | District 08 | 6 | Stutz Excavating, Inc. | $250,615 | $302,398 | +21% | IDOT |
| 68H84 | Section (129X)CLV,SLP-1 | District 04 | 5 | Miller Trucking & Excavating Company | $243,778 | $248,759 | +2.0% | IDOT |
| 68I05 | Section (7)TS | District 04 | 2 | Laser Electric, Inc. | $243,063 | $312,551 | +29% | IDOT |
| 74B47 | Section D7 | District 07 | 2 | Feutz Contractors, Inc. | $219,895 | $291,021 | +32% | IDOT |
| 95955 | Shelbyville, section 21-00063-00-RS | District 07 | 1 | Howell Paving, Inc. | $217,075 | IDOT | ||
| 68H81 | Section (90-15-1HB)BDR | District 04 | 3 | Path Construction Company, Inc. | $211,896 | $252,046 | +19% | IDOT |
| 64S38 | Section 109 | District 02 | 4 | Curran Contracting Company | $201,632 | $238,557 | +18% | IDOT |
| 76R39 | Section 60-(13,14,15)CJS-1 | District 08 | 3 | Complete Asphalt Service Co. | $199,270 | $215,716 | +8.0% | IDOT |
| 72620 | Section (11BR)BP | District 06 | 7 | ERA-Valdivia Contractors, Inc. | $194,688 | $245,780 | +26% | IDOT |
| 66N92 | Section (70-VBR-1)BP | District 03 | 4 | ERA-Valdivia Contractors, Inc. | $186,186 | $214,805 | +15% | IDOT |
| 68H27 | Section D4 | District 04 | 2 | M & M Concrete, Inc. | $175,287 | $177,800 | +1.0% | IDOT |
| 62W10 | Section FAI | District 01 | 3 | The Final Connection, Inc. | $168,480 | $183,600 | +9.0% | IDOT |
| 78A61 | Section (41-9)RA(PP-1) | District 09 | 4 | Samron Midwest Contracting, Inc. | $164,538 | $168,792 | +3.0% | IDOT |
| 66M43 | Section (20,21)PP | District 03 | 2 | G. M. Sipes Construction, Inc. | $155,429 | $159,793 | +3.0% | IDOT |
| 46639 | Section D2 | District 02 | 3 | O'Brien Civil Works, Inc. | $152,258 | $166,835 | +10% | IDOT |
| 62W09 | Section FAI | District 01 | 3 | The Final Connection, Inc. | $140,400 | $153,000 | +9.0% | IDOT |
| 68H83 | Section (72-7-3)CLV | District 04 | 2 | Illinois Civil Contractors, Inc. | $138,627 | $202,277 | +46% | IDOT |
| 78A36 | Section 101PP-1 | District 09 | 4 | E. T. Simonds Construction Company | $131,011 | $163,104 | +24% | IDOT |
| 62W42 | Section (99-4-1HB-2)BR | District 01 | 2 | D. Construction, Inc. | $128,211 | $185,466 | +45% | IDOT |
| 72725 | Section 17DR | District 06 | 2 | Earth Worx Solutions LLC | $88,537 | $98,106 | +11% | IDOT |
| 76R12 | Section 100B-BDS-4 | District 08 | 4 | All States Painting, Inc. | $77,994 | $86,429 | +11% | IDOT |
| 70H06 | Section 74-2&74(10-70)&(10-71,73)CJS | District 05 | 2 | Complete Asphalt Service Co. | $66,944 | $85,483 | +28% | IDOT |
| 66N50 | Section (111BR-1)RCS | District 03 | 1 | D. Construction, Inc. | $59,606 | IDOT | ||
| 74B42 | Section D7 | District 07 | 3 | Complete Asphalt Service Co. | $40,973 | $53,486 | +31% | IDOT |
| 66N96 | Section (103BR)SCR | District 03 | 2 | Tobey's Construction & Cartage, Inc. | $33,295 | $112,615 | +238% | IDOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than IDOT received, the others did not match their published totals and are left out.