SKC Construction, Inc.: IDOT bid record
SKC Construction, Inc. submitted 69 bids on Illinois DOT contracts in the data, from 15 JAN 2021 to 31 JUL 2026, and was the low bidder on 18 of them (26%). When it was not low, its total sat a median +34% above the low bid.
- Owner
- Illinois DOT
- Low bid volume
- $5,081,469
- Latest bid
- 31 JUL 2026
- Data through
- 18 SEP 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2021 | 22 | 8 | 36% |
| 2022 | 9 | 1 | 11% |
| 2023 | 8 | 2 | 25% |
| 2024 | 8 | 3 | 38% |
| 2025 | 10 | 1 | 10% |
| 2026 | 12 | 3 | 25% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| District 01 | 34 | 13 | 38% |
| District 03 | 12 | 2 | 17% |
| District 06 | 8 | 2 | 25% |
| District 02 | 4 | 0 | 0% |
| District 08 | 4 | 0 | 0% |
| District 04 | 4 | 1 | 25% |
| District 07 | 2 | 0 | 0% |
| District 09 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Mod ureth PM line 12 | 78009012 | LF | 33 | 21 (64%) | $2.50 | $4.50 |
| Crack routing (pavt) | 45100100 | LF | 47 | 20 (43%) | $0.05 | $0.05 |
| Mod ureth PM LTR-sym | 78009000 | SF | 32 | 17 (53%) | $5.05 | $7.00 |
| Mod ureth PM line 24 | 78009024 | LF | 31 | 16 (52%) | $5.00 | $8.00 |
| Temp info signing | Z0030850 | SF | 30 | 12 (40%) | $22.00 | $18.00 |
| JT CR RT PCC pav/SHLD | 45200100 | LF | 17 | 11 (65%) | $0.12 | $0.70 |
| Mod ureth PM line 8 | 78009008 | LF | 26 | 10 (38%) | $1.50 | $2.25 |
| Mod ureth PM line 6 | 78009006 | LF | 37 | 9 (24%) | $1.13 | $1.90 |
| Mod ureth PM line 4 | 78009004 | LF | 39 | 8 (21%) | $0.75 | $1.69 |
| Trainees TPG | Z0076604 | HR | 5 | 5 (100%) | $15.00 | $15.00 |
| Crack filling | 45100200 | LB | 49 | 4 (8%) | $2.67 | $2.32 |
| Changeable message SN | 70107025 | CAL DAY | 17 | 4 (24%) | $118.00 | $55.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Freehill Asphalt, Inc. | 49 | 35 of 49 |
| Denler, Inc. | 40 | 24 of 40 |
| Complete Asphalt Service Co. | 29 | 20 of 29 |
| Kinney Contractors, Inc. | 7 | 5 of 7 |
| Antigua, Inc. | 5 | 0 of 5 |
| Countryman, Inc. | 4 | 2 of 4 |
| RoadSafe Traffic Systems, Inc. | 3 | 1 of 3 |
| Diamond Coring Company, Inc. | 2 | 0 of 2 |
| Mosley Construction 1, LLC | 2 | 0 of 2 |
| Quality Saw & Seal, Inc. | 1 | 0 of 1 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 31 JUL 2026 | 62V64 | District 01 | Section FAP | 2 of 2 | $91,284 | +7.0% |
| 31 JUL 2026 | 62V79 | District 01 | Section FAP | 2 of 2 | $197,404 | +4.0% |
| 31 JUL 2026 | 62V80 | District 01 | Section FAP | 2 of 2 | $117,765 | +127% |
| 12 JUN 2026 | 62V63 | District 01 | Section FAP | 1 of 2 | $184,544 | Low, 124% under the second |
| 24 APR 2026 | 66T58 | District 03 | Section (17,18)CJS | 4 of 5 | $59,621 | +20% |
| 24 APR 2026 | 68J47 | District 04 | Section D4 | 3 of 3 | $984,777 | +19% |
| 24 APR 2026 | 74D56 | District 07 | Section (26-3,4)CJS | 3 of 3 | $504,653 | +52% |
| 27 FEB 2026 | 66R39 | District 03 | Section D3 | 2 of 4 | $42,894 | +8.0% |
| 27 FEB 2026 | 66R41 | District 03 | Section D3 | 4 of 4 | $76,953 | +35% |
| 27 FEB 2026 | 72A82 | District 06 | Section D6 | 1 of 3 | $153,087 | Low, 8.0% under the second |
| 16 JAN 2026 | 72777 | District 06 | Section D6 | 1 of 4 | $148,228 | Low, 1.0% under the second |
| 16 JAN 2026 | 78B84 | District 09 | Section D9 | 4 of 4 | $200,404 | +135% |
| 19 SEP 2025 | 72416 | District 06 | Section D6 | 3 of 3 | $298,392 | +21% |
| 13 JUN 2025 | 64T31 | District 02 | Section D2 | 4 of 4 | $343,417 | +34% |
| 13 JUN 2025 | 64T32 | District 02 | Section D2 | 5 of 5 | $226,366 | +41% |
| 13 JUN 2025 | 64T33 | District 02 | Section D2 | 4 of 4 | $312,593 | +60% |
| 25 APR 2025 | 66P47 | District 03 | Section D3 | 4 of 4 | $109,603 | +74% |
| 25 APR 2025 | 66P48 | District 03 | Section D3 | 2 of 4 | $241,657 | +25% |
| 25 APR 2025 | 66R16 | District 03 | Section (3R)CJS | 1 of 5 | $23,407 | Low, 3.0% under the second |
| 25 APR 2025 | 74C48 | District 07 | Section D7 | 4 of 4 | $609,455 | +59% |
| 07 MAR 2025 | 68J19 | District 04 | Section D4 | 2 of 4 | $996,662 | +16% |
| 17 JAN 2025 | 72878 | District 06 | Section (75-6)CJS | 2 of 4 | $98,607 | +18% |
| 14 JUN 2024 | 66P23 | District 03 | Section D3 | 4 of 4 | $280,968 | +51% |
| 14 JUN 2024 | 66P24 | District 03 | Section D3 | 2 of 4 | $146,430 | +65% |
| 26 APR 2024 | 68H26 | District 04 | Section D4 | 1 of 1 | $973,284 | Low |
How this record was read
IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.
- Every bid counted here matched its published total to within one dollar; IDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.