IDOT contract 66P48 bid tabulation

Section D3. Let by Illinois DOT on April 25, 2025, Livingston, District 03. 4 bids received; low bid $193,871 by Denler, Inc..

Owner
Illinois DOT
Letting
25 APR 2025
Pay items
7
Data through
18 SEP 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Denler, Inc.$193,871Low
2SKC Construction, Inc.$241,657+25%
3Freehill Asphalt, Inc.$317,857+64%
4Complete Asphalt Service Co.$322,837+67%
IDOT contract 66P48: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Denler, Inc.2. SKC Construction, Inc.3. Freehill Asphalt, Inc.4. Complete Asphalt Service Co.
1Temp info signing (X7200061)SF168$35.00$60.00$30.00$50.00
2Crack routing (pavt) (45100100)LF281,711$0.01$0.02$0.10$0.01
3Crack filling (45100200)LB98,599$1.53$2.02$1.69$2.65
4Mobilization (67100100)LS1$5,000.00$5,000.00$19,000$18,800
5Traf cont-prot 701306 (70100460)LS1$5,000.00$1,500.00$80,000$10,000
6Paint PVT MK line 4 (78001110)LF70,281$0.14$0.13$0.12$0.14
7Paint PVT MK line 6 (78001130)LF55,683$0.26$0.20$0.19$0.21
IDOT contract 66P48: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from IDOT's tabulation for this contract. IDOT Unit Price Tabulation of Bids reports for every letting from January 2021 to September 2026 posted on IDOT's letting site. Contracts with alternate bid groups are left out, and so are bids that did not match their published total.

Every contract let that day: IDOT letting of April 25, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy